April 23rd-24th 2013Handling Engineering Group. Visit schedule – April 23 rd April 23rd-24th 2013Handling Engineering Group2 Prevessin site Visit of PR559.

Slides:



Advertisements
Similar presentations
Work at Height Regulations 2005
Advertisements

Hansen – Managing Safely Work at Height Regulations 2005.
Student Placement Health & Safety Briefing Nick Izzard Health & Safety Adviser FAHS, FML & GSA.
University of Wisconsin Eau Claire By: Chaizong Lor
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
National Committee for the Certification of Radiation Protection Officer SAFETY AND WORK PROCEDURE IN SALES OF RADIOACTIVE MATERIAL AND IRRADIATING APPARATUS.
Roofing Fall Protection The following presentation can be used to satisfy the training requirements of the Fall Protection Standard in the WISHA Safety.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Gauges and well logging
“Guidance on rescue during working at height” & their role within the “Working at height regulations 2005 Delivered by Daniel McNess Abseil Inspector /
BIDDERS’ CONFERENCE IT-3980 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Up to 10 Tons Capacity 20 March.
Slide #1 Facilitated Discussion: MOL / OHSA Requirements for “Fall Protection” Occupational Health and Safety Act - R.R.O. 1990, REGULATION 851  INDUSTRIAL.
Appendices Subpart R Steel Erection
RADIATION MONITORING OF SCRAP METAL: BELARUS’ PERSPECTIVE V. PIOTUKH LEADING STATE NUCLEAR AND RADIATION SAFETY INSPECTOR PROMATOMNADZOR BELARUS Group.
Technical Specification April 23rd-24th 2013Handling Engineering Group1  Technical documents during tender  Contract execution  Documents during contract.
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
OSHA Compliance Presented By; Rob Hecker-Safety Liaison Division of Construction.
Student XXX BCT 480 Hazard Recognition Site Report November 15, 2004
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014.
General Safety Chapter. Hearing Protectors Hearing Conservation What are the effects of noise? Is hearing loss painful? When should I wear hearing protection?
ENGINEERING BY CALEB REILLY- HALL. HAZARDS Mechanical equipment (such as metal guillotines, power presses, angle grinders) Forklifts Welding Noise Electricity.
PPE: Face, Head, Foot, and Hand The participant will better understand the various types of PPE and their importance as laid out by OSHA.
COMPANY – MS1 Rack Options Site Visit & Warehouse Storage System Evaluation Design/Build for Warehouse Storage Systems Warehouse Space Planning Building.
Transport and handling at CERN for FAIR
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
ATLAS Open Days Guides Safety Training. 1. Generalities: Name and phone number of the person responsible for the ATLAS visit point: Site manager: B. Di.
Dismantling LEP and the Experiments Access to the underground areas, project organisation, coordination and safety.
April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for.
J. Pedersen EN DSO Performance Scientific performance Measurable, reproducible, controllable: Documented presence! Technical performance Measurable,
Working / walking on a roof
1 Identification of non-applicable chapters and sections using the NASA-STD Annex Table of Contents as they relate to payload systems, instruments,
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Fall Protection Training. - Falls remain the number one cause of fatalities in the construction industry. FALL PROTECTION FACT!!!
Laboratory Safety Deona Willes, MPH Deputy Director Office of Environmental Health and Safety I Environmental.
EN-HE Group meeting 19 th June 2015 I. Rühl / EN-HE.
Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015.
Fatal fall from a height On the 7 th of March 2008 a colleague observed the erection of a tower crane. Noticing the lack of common sense on site, he approached.
Radiation Protection computing tools Gérald Dumont HSE/RP.
1Fall FALL PROTECTION. 2Fall CONTENTS  Introduction  Purpose  Same Level Falls  Lower Level Falls  Fall Prevention  Summary.
Sale of material salvaged from the LEP experiments 4 large experiments ALEPH DELPHI L3 OPAL The 4 detectors are situated in caverns (100 m under ground.
Guidance on the Working at Height Regulations 2005 (amended). Delivered by Daniel McNess Abseil Inspector / Emergency Rescue Co-ordinator Severn Bridges.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.
Miloš Štěpanovský – director NPP Temelín EXERCISE „ZÓNA 2010“ exercise program and safety precautions.
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
Safety in the Neutrino Platform Hall
Safety Code 35 and the O.H.S. Regulation
EN-Handling Engineering Group
Beam schedule some technical info
EN-HE Group meeting 4th December 2015
Steel Erection 29 CFR 1926, Subpart R
EN-HE SPS works during EYETS
STOP WORK ORDER DUE TO IMMEDIATE DANGER ON CONSTRUCTION SITE
TECHjOSH.COM TechJosh.com.
DID YOU KNOW CORRECTLY SUITING UP IS THE BEST WAY TO KEEP FROM FALLING DOWN. Working at heights is hazardous. That’s why it’s important to always wear.
DID YOU KNOW KEY CONTROLS CAN BE IMPLEMENTED TO REDUCE DROPS AND DROP-RELATED INJURIES Key controls include: DROP Zones – Restrict areas where there.
Most Frequently Cited Serious Violations
FALL PROTECTION.
Things to consider: Storage and handling of equipment.
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Radiation Protection Handbook
Large Animal Emergency Rescue
Steel Erection 29 CFR 1926, Subpart R
12 Safe Maintenance Rules
Presentation transcript:

April 23rd-24th 2013Handling Engineering Group

Visit schedule – April 23 rd April 23rd-24th 2013Handling Engineering Group2 Prevessin site Visit of PR559 (project n.7) and TCC8 crane (included in next IT) in building 911 G. Roche / R. Rinaldesi Visit of PR538 (project n.5) and PR534 (project n.6) in building EHN1 J.P. Granchelli / H. Lourenço – 15.30Bonfanti / MeloniBrunnhuber / Brun-Mech / Bang – 17.00Brunnhuber / Brun-Mech / BangBonfanti / Meloni : Visit of PR37 and PR38 (project n. 8) in building 156 Meyrin site

Visit schedule – April 23 rd April 23rd-24th 2013Handling Engineering Group3 CraneLocation / extent of visit PR559 (project n.7) Surface hall, no access on crane foreseen TCC8-PR560Underground cavern, access on crane for inspection PR534 – PR538 (projects n.5-6)Surface hall, access on cranes for inspection PR37 – PR38 (project n.8)Surface hall, access on railways only

Visit schedule – April 24 th April 23rd-24th 2013Handling Engineering Group4 Meyrin site Visit of PR122 (project n.1) and installation site of new 5 ton crane (project n.2) in building 184 G. Roche / R. Rinaldesi Visit of PR146 (project n.4) in building 184 and installation site of new 30 ton crane (project n.3) in building 375 J.P. Granchelli / H. Lourenço 9.00 – 10.00Bonfanti / MeloniBrunnhuber / Brun-Mech / Bang – 11.00Brunnhuber / Brun-Mech / BangBonfanti / Meloni

Visit schedule – April 24 th April 23rd-24th 2013Handling Engineering Group5 CraneLocation / extent of visit PR122 (project n.1) Surface hall, access on crane for inspection New 5 ton crane (project n.2)Surface hall, access on railways PR146 (project n.4)Surface hall, access on crane for inspection New 30 ton crane (project n.3)ISR storage area, access to hall only

Hazards April 23rd-24th 2013Handling Engineering Group6  Access to railways and cranes at ~10 from the ground  Access to radiation areas

Measures April 23rd-24th 2013Handling Engineering Group7  Personal Protective Equipment: safety shoes, helmet  Fall-arrest harness (with lanyard)  Dosimeters (escort only)  All visitors shall be authorized by their employer to work in height and use a harness  All visitors shall be authorized by their employer to work in radioactive areas