1 Institutional Support Services Capital Project Process.

Slides:



Advertisements
Similar presentations
Educational Activities 2013 Karen Panetta R1 Educational Activities March 2013.
Advertisements

Museum Presentation Intermuseum Conservation Association.
Free Powerpoint Templates Page 1 Free Powerpoint Templates ABOUT US Who we are… What we do… How we do it… And how we serve your community…
Jim McElwain College Architect SETTING UP A LABORATORY.
MULTIPLE PROFESSIONAL REVIEWS DOCUMENT SOLUTIONS Architectural and engineering review identifies building code and accessibility repairs needed. ($750,000.
October 11, Trace Little, Director of Purchasing Introduction and Agenda Reasons for a new procedure Who was involved in the process Judy Smith,
Bond Program Planning Imperatives Study Session October 12, 2004.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Green Roof Action Project 綠頂行動 Our scheme is not just about physical implementation of green features on top of school buildings, it is about the knowledge.
CITY OF MERIDIAN FY08 BUDGET HEARING Mayor – Tammy de Weerd Council President – Joe Borton Council Vice President – Charlie Rountree Council – Keith Bird.
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
INDUSTRIAL & SYSTEMS ENGINEERING
IT Governance and Management
Facilities Management and Planning Horace Bomar, Director November 1, 2011.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Office of Inspector General (OIG) Internal Audit
Integrating work flows of five utilities utilizing Oracle’s WAM
School Solutions.  History & Organization Structure.  AKADEMIKA Team.  Our Strengths.  Modernization of Schools & Role of AKADEMIKA?  Our Services.
Cheryl Miller Ferris State University 2010  Provide physicians an overview of the Nursing Administrator role in relation to patient care services, present.
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
Bexar County’s Nationally Recognized Hospital District University Health System.
Mia Alexander-Snow, PhD Director, Office for Planning and Institutional Effectiveness Program Review Orientation 1.
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
Technology Access In Post-Secondary Education Ron Stewart Managing Consultant AltFormat Solutions LLC.
CITY OF MERIDIAN FY07 BUDGET HEARING Mayor – Tammy de Weerd Council President – Shaun Wardle Council Vice President – Joe Borton Council – Keith Bird Council.
UNM and Health System Internal Audit Departments Internal Audit Department Orientation Manu Patel, Internal Audit Director Purvi Mody, Executive Director,
PROCUREMENT SERVICES DEPARTMENT “How We Do Business”
Agenda  Finance and Administration Strategy - Vision, Mission and Core Values - Balanced Scorecard Objectives  Key Initiatives  Your questions.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
FACILITIES PLANNING & CONSTRUCTION (F P & C). The goal of Facilities Planning and Construction is to provide excellent customer service to Angelo State.
IT PMB: Executive Oversight and Decision Authority for Application and Infrastructure Projects at NASA Larry Sweet Chair, IT PMB JSC CIO August 2010.
1 Strategic Thinking for IT Leaders View from the CFO Seminars in Academic Computing Executive Leadership Institute.
The Expectation Triad Healthcare Engineering Consultants Regulatory Compliance: “Ensuring that all of the required standards are being met”
Department of Public Works Public Buildings Division Joey Duncan, P.E., Director.
Unit 8a Troubleshooting; Maintenance and Upgrades; Interaction with Vendors, Developers, and Users Component 8 Installation and Maintenance of Health IT.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Industrial Risk Control
Contractors Information Session Purchasing Department Joe Zaborowski-Director LeeAnn Crist-Buyer/ Designer.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Total Cost of Ownership for Technology Resources at Mission College Description and Recommendations.
PLUTUS PARTNERS COMPANY PROFILE : Plutus Partners is a leading consultancy and contracting company in India that has executed construction work for some.
FMDG FMDG at Virginia Tech: A Synergestic Approach Virginia Tech Facilities Managers' Development Group : A Synergistic Approach Dawn Maxey, Facilities.
MDC Strategic Plan Strategic Plan Coordinating Committee October/November 2010.
Construction of a Transfer Station
DOE ASSET MANAGEMENT PLAN
Process of Planning, Designing and Financing a Hospital
Smart Schools Bond Act High-Tech Security Projects Protecting Our Greatest Assets Conference December 2.
Planning for School Implementation. Choice Programs Requires both district and school level coordination roles The district office establishes guidelines,
Coast Construction & Design. Challenges Challenge One –Staffing & Collaboration Challenge Two –Design Challenge Three –Execution.
New England Association of Schools and Colleges Community Resources for Learning.
MD. SAIFUL ISLAM B.SC ENGINEER(COMPUTER) IT SPECIALIST BANGLADESH SHIPPING CORPORATION CHITTAGONG Web:
Careers in Distribution, Copyright 2005, WERC Careers in Distribution Management Jobs.
Funding Technology at Mission College Challenges and Recommendations.
FACILITIES PLANNING INTRODUCTION Form Follows Function Form and function should be one, joined in a spiritual union.
Installation and Maintenance of Health IT Systems Unit 8a Troubleshooting; Maintenance and Upgrades; and Interaction with Vendors, Developers, and Users.
Charlie Conner, Project Manager Performance Contract Energy Conservation Measures September 30, 2013.
1Archer Mechanical. Archer Mechanical is dedicated to providing solutions that save you both time and money. Specializing in sustainable mechanical and.
IT Governance Purpose: Information technology is a catalyst for productivity, creativity and community that enhances learning opportunities in an environment.
Budget Study Sessions Strategic Support Proposed Operating Budget OUTCOMES: - A High Performing Workforce that is Committed to Exceeding.
Making Health Facility Safe Through Facility Management
Clinical Engineering Lecture (3).
How to Build a Great Team
Safety and Security- From Assessment to Implementation
Controlling Project Cost and Schedule
Ralph R. Alster, Architect
Carleton College Facilities Management
The Director of Facilities in a School District
Project Management Method and PMI ® PMBOK ® Roles
Equipment Maintenance Office Supplies Replenishment
Presentation transcript:

1 Institutional Support Services Capital Project Process

What is the Office of Capital Projects (OCP)? Convergence of staff from HSC and Main Campus Facility Planning Groups and PPD Construction Management Convergence of staff from HSC and Main Campus Facility Planning Groups and PPD Construction Management Formed in March 2006 Formed in March 2006 Staff of architects, engineers, project managers, construction managers and support personnel Staff of architects, engineers, project managers, construction managers and support personnel

OCP Mission The Office of Capital Projects manages programming, design and construction, retrofitting, and restoration of campus buildings and their environments in support of… excellence in teaching, research, patient care, and community service; excellence in teaching, research, patient care, and community service; a sustainable environment; a sustainable environment; a lasting campus heritage; a lasting campus heritage; a diverse workplace that fully supports staff development. a diverse workplace that fully supports staff development.

What Value do we bring? Professional Project Management services Professional Project Management services Coordination of services with UNM entities and external vendors and contractors Coordination of services with UNM entities and external vendors and contractors Assurance of code compliance Assurance of code compliance Sustainability practices Sustainability practices Best value for quality work Best value for quality work Compliance with UNM Standards Compliance with UNM Standards Initial 20 hours of consultation is free Initial 20 hours of consultation is free

Customer Service Objectives Provide a responsive, consistent, and cost-effective delivery of programming, design, and construction. Provide a responsive, consistent, and cost-effective delivery of programming, design, and construction. Serve as an advocate for modifications to a building or building system and furniture specifications. Serve as an advocate for modifications to a building or building system and furniture specifications. Improve the livability of campus buildings and maintain the integrity of building systems. Improve the livability of campus buildings and maintain the integrity of building systems. Enhance customer involvement in the project development and implementation process. Enhance customer involvement in the project development and implementation process.

When do you need OCP? Modifications that affect the structural, mechanical, electrical, plumbing and/or security systems of a building, including walls and partitions Modifications that affect the structural, mechanical, electrical, plumbing and/or security systems of a building, including walls and partitions Change of space usage (e.g., office to a lab, classroom to a Office) Change of space usage (e.g., office to a lab, classroom to a Office) Modifications requiring coordination with facilities maintenance staff (PPD) Modifications requiring coordination with facilities maintenance staff (PPD) Modifications that affect exiting, exit elements and ADA compliance Modifications that affect exiting, exit elements and ADA compliance Design, installation or removal of equipment connected to building systems (eg. hoods, exhaust fans, water filtration) Design, installation or removal of equipment connected to building systems (eg. hoods, exhaust fans, water filtration)

When do you need OCP? – Continued Furniture – new or reconfiguration Furniture – new or reconfiguration Design and specifications - Yes Design and specifications - Yes System furniture changes (eg. Reconfigure or moving partitions) - Yes System furniture changes (eg. Reconfigure or moving partitions) - Yes Designing new systems furniture applications – Yes Designing new systems furniture applications – Yes Evaluation of various furniture options for quality and best value – Yes Evaluation of various furniture options for quality and best value – Yes Ordering a pencil drawer or shelf for existing systems furniture – NO Ordering a pencil drawer or shelf for existing systems furniture – NO Ordering a chair – NO (Unless you would like an ergonomic evaluation) Ordering a chair – NO (Unless you would like an ergonomic evaluation)

How to Request Project Services Call OCP at Call OCP at Contact anyone within ISS with whom you have a working relationship Contact anyone within ISS with whom you have a working relationship Project request form can be found at; Project request form can be found at; Fax to to: to:

Project Process Development of Scope, Schedule and Budget Development of Scope, Schedule and Budget Approval Process Approval Process Proceed with Project scope listed Proceed with Project scope listed Do not proceed – Cancel Project. Do not proceed – Cancel Project. Do not proceed–Re-Evaluate: Budget, Scope, and Schedule Do not proceed–Re-Evaluate: Budget, Scope, and Schedule When project is approved schedule will vary based on : When project is approved schedule will vary based on : Complexity Complexity Design/Engineering requirements Design/Engineering requirements Construction permitting Construction permitting Construction duration Construction duration

Scope Statement

Project Team Members Successful project management requires communication between these participants: Successful project management requires communication between these participants: Client Client OCP Project Manager OCP Project Manager OCP Construction Manager (if Required) OCP Construction Manager (if Required) College Representative / Executive Leadership College Representative / Executive Leadership PPD Facility Manager PPD Facility Manager Building Mangers Building Mangers Planning and Campus Development Planning and Campus Development Physical Plant Department - Engineering Physical Plant Department - Engineering Safety and Risk Management Services Safety and Risk Management Services Parking and Transportation Parking and Transportation Police Police IT IT Purchasing Purchasing