May 7 th, 2014. Purpose and Scope of Project Project History Project Elements Next Steps.

Slides:



Advertisements
Similar presentations
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
Advertisements

Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Introducing Bicycle/Pedestrian Planning & School Travel Plans Presentation prepared for the 2010 Active Transportation Conference Jim Fisher, PhD, AICP.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Slide 1. Slide 2 Introduction How did you get to school as a child?
Maryland Avenue and Westminster Street Jerry Auge, PE Project Manager Ramsey County Paul St. Martin Traffic Engineer City of St. Paul September 10, 2013.
Chubaka Producciones Presenta :.
March 8, 2005 Pedestrian Connections  Some key arterial segments are missing sidewalks (Meridian, 1 st and 15 th Ave).  ¼ of the residential areas have.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Anaheim Regional Transportation Intermodal Center Project Update.
Public Works EVANSTON ILLINOIS September 29, 2014 Dodge Avenue/ETHS /Mason Park Bike Improvements Project Sat Nagar, P.E. Assistant Director of Engineering.
Ensuring a Safe University Board of Regents Facilities and Operations Committee December 12, 2013.
Bicycle and Pedestrian Planning May City of Ellsworth Bike-Ped Planning May 2009 Accomplishments: POLICY and ADMINISTRATION The City Council adopted.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Economic Development in Southeast Guilford County February 2013.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Massachusetts Avenue Roadway Improvements Board of Selectmen’s Meeting July 13, 2015 TOWN OF LEXINGTON.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Public safety (vehicular & pedestrian) Worker safety Maintenance of traffic flow Business access Maintenance of utility services.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
Park Lane ZOM Location Map. Park Lane ZOM Aerial.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
“First In the Nation” Diverging Diamond Interchange IS 44 and MO 13 - Springfield, MO Joseph C Rickman, PE, ACTAR District Traffic Engineer MoDOT – Springfield.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Penacook Village: A Pictorial History Matthew R. Walsh Dir. of Redevelopment, Downtown Services & Special Projects City of Concord February 8,
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013
PROJECT OVERVIEW. 2 Green Line Extension Project 3 College Ave Ball Sq Lowell St Gilman Sq Lechmere Union Sq Washington St.
CITY OF RAINIER RAILROAD CROSSINGS 1. Team Members Matthew DeGeorge Robert Acevedo Josh Crain Jim Harvey Heather Wenstrand 2.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Saving the King Street Bicycle Boulevard
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
1. Neighborhood Safety Program 2. ICS traffic and security 3
Stanford Avenue/El Camino Real Intersection Improvements Project
Pine cove pit time lapse drone photos
Issaquah-Fall City Road
HHS Freshman Academy Update
City of Wilmington Bike Plan Update
State Aid Standards Development
Gunnerson Street Safety Project
McDonald’s calendar 2007.
Protected Bicycle Lanes Finally Pedal Their Way to KC…
McDonald’s calendar 2007.
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
I Street Bridge Replacement Project
2015 January February March April May June July August September
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

May 7 th, 2014

Purpose and Scope of Project Project History Project Elements Next Steps

Develop a “City Center” Corridor (2004) Slow Traffic, but still move it Improve Pedestrian and Bicycle Safety Revitalize and Create a City Center for Post Falls

Limits: I-90 to Bridge Traffic Signal at 4 th (Complete) Median Islands Pedestrian & Bicycle Improvements Landscaping Pocket Parks Street & Pedestrian Illumination Centennial Trail Crossing Lane Reduction & Parallel Parking

Year/DateMilestone 2004City Center Corridor Plan March 2012 – June 2012Concept Design Phase November 2012URA Board Approves Concept December 2012City Council Approves Concept January 2013Public Meeting February 2013Lane Reduction & Parallel Parking Feb 2013 – Feb 2014Preliminary/Final Design Phase May 2014Bid Phase July – September 2014Construction Phase

Concept Design Roadway & Hardscape Landscape, Irrigation & Street Furniture Pocket Parks & Entry Monument Street and Pedestrian Illumination

Terry Werner - Public Services Director Linda Wilhelm – Post Falls City Council Ryan Davis - Planning and Zoning Tim Short - Urban Renewal - former board member Hilary Anderson - City Planning Debbie Frank - City Parks Bill Melvin - City Engineering Dave Fair - City Park & Recreation Deb Morphus - The Condos Melissa Maldovino - Leopard Latte Ken Lynn - Post Falls Family Dental Sharon Sorenson - Body by Scotty Len Crosby - Chamber of Commerce Bob Templin - Templins Jim Lehr - Liberty Bankers Life - Landings Property

Traffic Calming Islands Pedestrian & Bicycle Facilities Lane Configuration & Parallel Parking Centennial Trail Crossing

Existing Configuration 5 Lanes between I-90 & 2 nd Avenue 3 Lanes between 2 nd Ave and 1 st Ave Future Configuration 5 Lanes between I-90 & RR Avenue 4 Lanes between RR Avenue & 3 rd Avenue 3 Lanes between 3 rd Avenue & 1 st Avenue Difference Reduce one northbound lane between 2 nd & RR Avenue (parallel parking) Reduce one southbound lane between 2 nd & 3 rd Avenue

Railroad Coordination - Ongoing Bid Advertisement & Opening – May/June 2014 Construction – Summer 2014