Utility’s Perspective Of Future Transmission September 23, 2008.

Slides:



Advertisements
Similar presentations
Westar Energy Transmission Operations: An Update on Regional and Local Transmission Activity June 22, 2010 Presented to Attendees of Westars Transmission.
Advertisements

Evaluating the Benefits of the SPP EHV Buildout Moving forward on policy for funding 765 KV Larry Holloway CAWG Meeting February 25, 2009.
Wind Energy and Transmission South Dakota Legislative Briefing Pierre, South Dakota January 18, 2006 Beth Soholt Director Wind on the Wires.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
John B. Wharton, PE Technical Executive Baltimore, Maryland October 16, 2013 Perspectives on Grid-Integrated Microgrids Maryland Clean Energy Summit.
Citizens League Electrical Energy: Affordability and Competitive Pricing Working Team Electric Transmission.
Electric Transmission and Economic Opportunities Richard W. Caperton Senior Energy Policy Analyst.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
Transmission Transporting Energy by Wire Matthew Stoltz Basin Electric Power Cooperative 1 1.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
Highway-Byway Cost Allocation: What it Offers MISO January 2010 Presented to the Organization of MISO States CARP and the Midwest ISO RECB Task Force Meeting.
20% Wind Vision: a KS Opportunity Larry Flowers National Renewable Energy Laboratory Topeka, KS – September 26, 2007.
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
The Electrical Grid: America’s Funnest Crisis. History of the Power Grid: Overview Historical Perspective Materials Capacity Regulations.
URBAN WATER INSTITUTE California’s Geothermal Resource Capability and Opportunity February 2014.
The Continuing Evolution of U.S. Electricity Markets
U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.
Transmission Incentives P. Kumar Agarwal Acting Director, Division of Reliability & Engineering Services Federal Energy Regulatory Commission U.S. DOE,
Montana Ambassadors Helena, Montana February 25, 2011.
Western NC Wind Capacity ASU Energy Center after all exclusion zones: 3,150 MW in west (8% of NC electricity from 2100 turbines) ASU Energy center identified.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
Charles Hosken, General Manager Imperial Irrigation District
Future Energy Scenarios 2015 Supply Marcus Stewart Demand and Supply Manager.
The Value of Electric Transmission NASUCA Mid-Year Meeting June 25, 2012.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
The Need for Electric Transmission Improvements in Dane County.
W IND E NERGY C HALLENGES. W IND ENERGY HAS MANY BENEFITS Oil independence Locally produced (jobs) No air pollution (or CO2) Uses no water Renewable Lower.
Small Generation Interconnection Standards - IOU Dennis Reed Westar Energy Topeka, KS September 26, 2007.
The Texas Renewable Energy Program National Governors Association Scottsdale, Arizona April 29, 2004.
ISAC Fall School November 30, 2012 Iowa’s Wind Energy Industry & Economic Impact.
September 5,  Mission - To provide Excellent Service to Our Distribution Members by creating opportunities, cultivating cooperation, and navigating.
Kansas Renewable Energy Conference September 26th, 2007.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Using a Dispersed Strategy in Your Region By Mike Michaud Matrix Energy Solutions Edited and Presented By Brian Antonich Windustry.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
Updated 1/28/2011. Cost Allocations and Affordability of Tariffs March 8, 2011 Jay Caspary ·
The Quebec Electric Industry and its Markets – the United States Kelly Harrison Vice President Transmission March 20, 2013.
1 Clean Line Energy National Association of State Utility Consumer Advocates Charleston SC Annual Meeting June 2012.
1 Kansas Wind Energy A Municipal Utility Perspective KANSAS CITY BOARD OF PUBLIC UTILITIES Blake Elliott – Director Electric Supply Planning September.
A Retailer’s Perspective On Canada’s Natural Gas Market Deryk King Chairman and CEO, Direct Energy September 26, 2006.
2007 Kansas Renewable Energy & Energy Efficiency Conference September 26, 2007 Tim Wilson, Planning and Operations Analyst.
Updated 1/28/2011.
Transmission Issues & Renewables Perspectives of a Wind Developer.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Bob Anderson West Wind Wires Siting and Policy Wind Power Plants* 119th Annual Convention Anaheim, CA November 16, 2007 NARUC *transmission, too.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
1 Invenergy. Harnessing the Wind Transmission System Typical Wind Park Electrical Transmission System.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
National Energy Technology Laboratory Driving Innovation ♦ Delivering Results Steve Bossart, Moderator October, 2015 USAEE Pittsburgh North American Conference.
How AEP is Approaching the Information Management Crisis by Leveraging OSIsoft’s Suite of Tools Bill Sigmon Sr. Vice President Fossil and Hydro Generation.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
1.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
R ENEWABLE E NERGY IN T EXAS Jess Totten Public Utility Commission of Texas 1.
Michigan Public Power Agency Wind Energy Supply Agreement
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
Wind Management at MISO
Patrick Smith, Vice President
EE6501 POWER SYSTEM ANALYSIS
Trends in Generation Dispatch
SunZia Project Description
Basin Electric SPP Market Update
MEC Presentation – The Importance of Customer Feedback
Presentation transcript:

Utility’s Perspective Of Future Transmission September 23, 2008

2 Key Operational Facts: F≈ 667,000 customers FMore than 6,100 MW of generation – 2006 reserve margin 12% F11,000 sq mile service territory F33,000 miles of T & D F2,100 employees FKansas retail market remains fully regulated Vertically Integrated Kansas Utility

3 Westar’s Transmission 4300 miles of transmission > 60 kV Member of Southwest Power Pool (SPP) FSPP Transmission Tariff Member FSPP Regional Entity Member for Reliability 2008 Transmission Construction budget - $150 million Two Major 345 kV projects FWichita to Hutchinson to Salina 345 kV line FWichita to Oklahoma 345 kV line 4300 miles of transmission > 60 kV Member of Southwest Power Pool (SPP) FSPP Transmission Tariff Member FSPP Regional Entity Member for Reliability 2008 Transmission Construction budget - $150 million Two Major 345 kV projects FWichita to Hutchinson to Salina 345 kV line FWichita to Oklahoma 345 kV line

4 Current Transmission Projects Wichita to Hutchinson FApproximately 40 miles Hutchinson to Salina FApproximately 60 miles Wichita to Oklahoma FApproximately 50 miles Other significant projects “inside regional footprint” Wichita to Hutchinson FApproximately 40 miles Hutchinson to Salina FApproximately 60 miles Wichita to Oklahoma FApproximately 50 miles Other significant projects “inside regional footprint”

5 Current Transmission Projects Wichita to Hutchinson to Salina 345 kV Project FWichita to Hutchison (Reno) line to be completed by the end of 2008 FReno to Salina (Summit) line to be completed by the end of 2009 Wichita to Oklahoma 345 kV project FProject to be completed by the end of 2010 These Projects eliminate two of the most highly active constraints in the SPP system Wichita to Hutchinson to Salina 345 kV Project FWichita to Hutchison (Reno) line to be completed by the end of 2008 FReno to Salina (Summit) line to be completed by the end of 2009 Wichita to Oklahoma 345 kV project FProject to be completed by the end of 2010 These Projects eliminate two of the most highly active constraints in the SPP system

6 Prairie Wind Transmission Joint venture between Westar and Electric Transmission America (ETA) ETA is owned 50/50 by AEP and Mid American AEP is the only utility in nation that has 765kV in operation AEP has designed, constructed and operated 765kV for almost 40 years Joint venture between Westar and Electric Transmission America (ETA) ETA is owned 50/50 by AEP and Mid American AEP is the only utility in nation that has 765kV in operation AEP has designed, constructed and operated 765kV for almost 40 years

7 Prairie Wind Transmission Prairie Wind was formed to design, construct and operate the first 765kV transmission west of the Mississippi SPP’s consultant Quanta identified the Prairie Wind project as the logical first step in building a 765kV overlay in the SPP Coupled with the Tallgrass Project announced by Oklahoma Gas & Electric and ETA, substantial progress will be made in realizing a transmission “interstate highway” in the SPP Prairie Wind was formed to design, construct and operate the first 765kV transmission west of the Mississippi SPP’s consultant Quanta identified the Prairie Wind project as the logical first step in building a 765kV overlay in the SPP Coupled with the Tallgrass Project announced by Oklahoma Gas & Electric and ETA, substantial progress will be made in realizing a transmission “interstate highway” in the SPP

8 Prairie Wind Transmission Prairie Wind Project

9 Benefits of Prairie Wind Project Enables substantial renewable wind development in western Kansas Provides substantial economic development benefits to Kansas via jobs for construction of line and wind farms and royalty payments to landowners Enables broader opportunities for energy markets in Kansas thereby lowering power supply costs Substantial environmental benefits Lower voltage lines will be unloaded Using 765kV technology results in substantially lower losses on the transmission system and improved reliability Enables substantial renewable wind development in western Kansas Provides substantial economic development benefits to Kansas via jobs for construction of line and wind farms and royalty payments to landowners Enables broader opportunities for energy markets in Kansas thereby lowering power supply costs Substantial environmental benefits Lower voltage lines will be unloaded Using 765kV technology results in substantially lower losses on the transmission system and improved reliability

kV Value Proposition FAdvanced six-conductor bundles for higher capacity, lower line losses and reduced noise FFiber-optic shield wires for better protection and control FWide-area monitoring, control, and remote diagnostics FIndependent-phase operation for improved line performance FLine design and right-of- way usage for least environmental impact FAdvanced six-conductor bundles for higher capacity, lower line losses and reduced noise FFiber-optic shield wires for better protection and control FWide-area monitoring, control, and remote diagnostics FIndependent-phase operation for improved line performance FLine design and right-of- way usage for least environmental impact Advanced Technology Environmental Stewardship More capacity on less land

11