April 15 and May 15, 2003 ERCOT System Disturbances ERCOT TAC Meeting June 4, 2003.

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

Spinning Reserve from Load Consideration of a Trial at Xcel Energys Cabin Creek Station Presentation to CMOPS January 7, 2005 John Kueck ORNL Brendan Kirby.
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Regional Planning Group Project
Goshen Area Bus Reconfiguration
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
1 U.S. Energy Information Administration, Annual Energy Review All energy input US average = 90.3 MWh per person, per year. Corresponds to 10.3 kW.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Recent ERCOT Events Lessons Learned
BRAZOS ELECTRIC COOPERATIVE Dobbin 345 Project David Albers, P.E. Manager – System Planning.
1 Team BUSS Backup Storage Source. 2 Team BUSS Backup Storage Source EHV Substation Second DC Storage Source Sponsor Idaho Power Company Team Members.
Team BUSS Backup Storage Source. Team BUSS Idaho Power Company Backup Storage Source Project Title Extra High Voltage (EHV) Station Second DC Storage.
Unit Transformer Unit transformer are step up transformer which is connected to generating house & step up voltage from 15kV voltage to 132 voltage level.
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
1 Blackout 2003 See:
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Houston Area Dynamic Reactive Project March 11,
BLACKOUT POWER OUTAGE By Masih Madayeni Class 3/6 English Presentation.
March 2003 Operations Summary Bill Blevins Manager Operations Engineering.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
Golden Valley Electric Assoc. Inc © 2012 GVEA. All rights reserved. GVEA BESS Expected and Actual Performance Dan Bishop Golden Valley Electric Assoc Fairbanks,
1 U.S. Energy Information Administration, Annual Energy Review All energy input US average = 90.3 MWh per person, per year. Corresponds to 10.3 kW.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Need for protection Power system must be kept in operation continuously without major breakdowns This can be achieved in two ways: 1.Implement a system.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Summary Rich Bauer, Senior Reliability Engineer Event Analysis Subcommittee – LL Update March 04, 2014.
Utilizing High-set Load Shedding Schemes (UHSLSS) to Replace Responsive Reserve Obligation Juan S. Santos (512)
Page 1 Slides for FR Technical Conference Office of Electric Reliability September 2010.
Lecture 22 Unbalanced Faults and Power System Protection Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Power Plant Construction and QA/QC Section 4.3 – Electrical Interconnections Engineering Technology Division.
CIP Version 4 The Basics. CIP Version 4- Background Centers around expanded criteria for Critical Assets – FERC thought Risk Based Methodologies used.
Lecture 22 Unbalanced Faults and Power System Protection Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
ECE 476 Power System Analysis Lecture 22: System Protection, Transient Stability Prof. Tom Overbye Dept. of Electrical and Computer Engineering University.
Announcements Read Chapters 10 and 11
Cheng-Ting Hsu Presenter: Cheng-Ting Hsu Cogeneration System Design for a High-Tech Science-Based Industrial Park Department of Electrical Engineering.
Operations Report Kent Saathoff System Operations ERCOT.
NERC Lessons Learned Summary LLs Published in September 2015.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
C-12 ELECTRICAL CW3 RIESE 18 APRIL DC SYSTEM -24V, 34 AMP HOUR NICKEL CAD BATTERY A 30V DC STARTER/GENERATORS -AN EXTERNAL DC POWER SYSTEM.
132KV GSS PIPAR CITY JODHPUR
Aug, 2005 THE US BLACKOUT AUGUST 14, Aug, 2005 NORTH AMERICAN GRID INTER-CONNECTS THE INDIAN GRID AT PRESENT IS ALSO SIMILAR WITH THE SOUTHERN REGION.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
Energy Emergency Alert (EEA) UPDATE F EBRUARY 8, 2011.
April 7, 2015 Washington, D.C. Area Low-Voltage Event Operations Training Seminar 2016 Erik Johnson System Operations Training (ERCOT)
Impact of Hurricane Ike on CenterPoint Energy’s Transmission System Paul Rocha Director, Transmission Planning Presented at October 2, 2008 ERCOT TAC Meeting.
Equipment 1.Circuit Breaker. 3.Fuses. 4.Protecti- ve relay.2.Bus bar. TYPES OF SWITCH GEAR EQUIPMENT:-
 The figure below shows a protection system for a transmission line, consisting of a CT, PT, a relay and its associated circuit breaker.
SEMINAR ON ISLANDING BY PAWAN. What is islanding? Normally all Power generators are interconnected to form a network called ‘GRID’. Some times it so happens.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Houston Import Study Update
UFLS Survey Explanation
Announcements Design Project has firm due date of Dec 4
Grid Operations Update
Black Start Overview.
Inverter Disconnects During Transmission Disturbances
Kenneth Silver Los Angeles Department of Water & Power
Compliance Report to ERCOT TAC February 2007
Kenneth Silver Los Angeles Department of Water & Power
Planning Tools Overview
Kenneth Silver Los Angeles Department of Water & Power
Presentation transcript:

April 15 and May 15, 2003 ERCOT System Disturbances ERCOT TAC Meeting June 4, 2003

2 April 15, 2003 Bryan-College Station Voltage Collapse

3 What Happened? At 11:39 CenterPoint Energy took an ERCOT approved planned outage of the Roans Prairie to Kuykendall 345KV line to accommodate highway department work When breakers at Roans Prairie and Kuykendall opened, clearing the line, breakers controlling the following 345 KV lines also opened: –Gibbons Creek – Roans Prairie –Gibbons Creek – O’Brien –Gibbons Creek – Twin Oak (one line) Leaving Gibbons Creek plant connected through only one breaker to Twin Oak and both buses serving the two Gibbons Creek 345/138KV autotransformers deenergized

4 What Happened? (cont.) With both autotransformers deenergized, there was not enough support of the load serving 138KV system in the Bryan-College Station area Voltage collapsed in the area resulting in a blackout of approximately 212 MW of load and 63,000 people Load in the area was completely restored in about 4 hours around 1600.

5 Why it Happened The deenergization of Roans Prairie to Kuykendall 345KV line caused increased flows on Roans Prairie to Gibbons Creek 345 KV line Faulty control equipment at Gibbons Creek sensed this increased flow as a fault and also incorrectly initiated a breaker failure operation that deenergized both Gibbons Creek busses and the two autotransformers serving the Bryan - College Station area

6 One-Line of B-CS Area

7 What’s Been Done About It? Faulty control equipment at Gibbons Creek has been fixed by TMPA ERCOT is working with Garland to prevent telemetry failures that happened during the event from reoccurring The System Protection Working Group of the Reliability and Operations Subcommittee of TAC is investigating to see if additional follow-up is needed

8 May 15, 2003 Under-Frequency Firm Load Shedding

9 What Happened? At about 2:54 a.m. an insulator flashed on the Comanche Peak – Parker 345 KV line, probably due to lightning Primary protective relaying at Comanche Peak did not respond Back-up protective relaying at Comanche Peak also failed to respond Breaker failure relaying at each substation connected to Comanche Peak tripped all 345 KV lines connected to Comanche Peak

10 What Happened? (cont.) With loss of lines out of the plant, both Comanche Peak units were tripped (total 2275 MW) A number of other units in ERCOT (total 1146 MW) tripped a few seconds afterward and another large unit (775 MW) tripped about 43 seconds later ERCOT frequency got down to Hz 471 MW of High-set Underfrequency load providing Responsive Reserve tripped at 59.7 Hz The first stage of underfrequency firm load shedding representing 5% of ERCOT load (~1549 MW) tripped at 59.3 Hz Frequency returned to normal in about 12 minutes All firm load restored by 6:30 am

11 ERCOT Frequency

12 Going Forward Bad News – It happened - It happened at 3:00 am Good News – It happened at 3:00 am - A successful real test of firm underfrequency load shedding Further Action –ERCOT and System Protection Working Group will get details of relay failure and follow up –ERCOT will determine why generation other than Comanche Peak tripped and what might be done to avoid in future