Project Map IL 47 Caton Farm Rd. to I-80 Prairie Parkway I-80 to I-88 IL 25 Waubonsee Creek IL 71 Orchard Rd. to US 34 IL 71 IL 47 to Orchard Rd. US 34 thru Sandwich to Plano IL 47 Countryside Pkwy. to Cross St. in Sugar Grove US 34 Big Rock Ck. to IL 47 US 34 IL 47 to Orchard Rd. IL 47 IL 71 to Countryside Pkwy. PE I PE II
Project Status PE I Engineering Complete Right of Way Plans Complete PE II Engineering 95% Complete – widening to 5-lanes proposed Construction Unfunded (Potential Capital Improvement Project) IL 47 from IL 71 to Countryside Parkway in Yorkville
Project Status PE I Engineering in FY Plan Advance engineering started on BNSF underpasses, Blackberry Creek bridge, Survey PE II Engineering, Land Acquisition, Construction Unfunded – note Yorkville ROW Permit IL 47 from Countryside Parkway in Yorkville to Cross Street in Sugar Grove
Project Status PE I Engineering included in Prairie Parkway study – 95% complete. Widening to 4-lanes proposed PE II, Land Acquisition, Construction Unfunded IL 47 from Caton Farm Road to I-80
Project Status PE I Engineering complete. Widening to 4-lanes and 5-lanes proposed PE II, Right of Way Plans underway Land Acquisition and Construction is funded in FY Plan IL 71 from Orchard Road to US 34
Project Status PE I Engineering in FY Plan PE II Engineering, Land Acquisition, Construction Unfunded IL 71 from IL 47 to Orchard Road
Project Status Structurally deficient PE I Engineering completed PE II Engineering and land acquisition underway Scheduled for the 2008 construction season. IL 25 Waubonsee Creek bridge in Oswego
Project Status PE I Engineering to be started in FY 2008 PE II Engineering is funded in FY Plan Land Acquisition, Construction Unfunded Many design possibilities – this will be a “full CSS” project. US 34 Thru Sandwich to Chilton Way in Plano
Project Status PE I and II Engineering is funded in the FY Plan A portion will be built with Prairie Parkway, other portions will be built by developers (Kendall Marketplace) or IDOT District 3 is engineering the segment between Cannonball Trail and Center Parkway with its in-house staff No construction funding except for the Prairie Parkway segment from Big Rock Creek to west of Eldamain; however, developers will also build some portions by permit US 34 from Big Rock Creek to IL 47
Project Status PE I Engineering is underway and a public meeting held. Widening to 4-lanes and 5-lanes proposed PE II Engineering is funded in the FY Plan Land Acquisition and Construction are unfunded; however, developer (Wal-Mart) is expected to build a 4-lane segment on the west end. US 34 from IL 47 to Orchard Road
Project Status PE I Engineering is 95% complete PE II engineering from IL 71 to US 30 will soon begin. Land Acquisition (IL 71 to US 30) and Construction (IL 71 to US 34) are funded in the FY Plan Prairie Parkway from I-80 to I-88