Proposed State Highway Projects: Kendall County September 20, 2007 Region 2/District 3 Illinois Department of Transportation.

Slides:



Advertisements
Similar presentations
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Advertisements

County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
From I-24 (MP 44) to I-64 (MP 92) is 48 miles ADT 2009 ADT = 30,000 vehicles per 2.2% growth rate 2030 ADT = 48,000 vpd 2009 Average Daily Truck.
PARK WEST DRAIN Park Township, Ottawa County, Michigan Project Information Meeting August 4, 2011 Ottawa County Drain Commissioner.
Great Western Corridor Feasibility Study
January 23, El Dorado County Development Projects 1.Carson Creek (D1) 2. Blackstone/Valley View (D2) 3. El Dorado Hills Business Park (D3) 4. Clarksville.
Titusville to Edgewater Bike Loop PD&E Study
Insert project map NOTICE OF PUBLIC INFORMATION MEETING Florida Department of Transportation Project History The Florida Department of Transportation (FDOT),
Senate Committee on Transportation, Technology and Legislative Affairs House Committee on Public Transportation Thursday, July 18, 2013.
IRTBA “STATE OF THE INDUSTRY” Will County FY 2012.
OLD KINGS ROAD Special Assessment District. Overview History Phased Project Current Status.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Florida Department of Transportation District One Interstate Planning for I-4 and I-75 October 30, 2012.
City of Palm Coast- Flagler County Transportation Impact Fees City Council-Flagler County Commission Workshop.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Longmeadow Parkway Fox River Bridge Corridor
HOOSIER HEARTLAND HIGHWAY Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to.
TRANSPORTATION ALTERNATIVES PROGRAM FY 2016 Project Priorities.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
PWC Quarterly Transportation Report DATA Roundtable June 17, 2015 Rick Canizales – Chief Department of Transportation.
PUBLIC WORKS DEPARTMENT FY Budget Worksession July 22, 2009.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Dallas/Fort Worth Toll Plan Randy Jennings Founder, Stop121Tolls.Com
FEDERAL PROGRAM Charles F. Riddle, P.E. Program and Office Engineer Bureau of Local Roads and Streets
ENGINEERING & CONSTRUCTION DIVISION GERALD N. BRINTON, P.E. COUNTY ENGINEER / DIRECTOR OF ENGINEERING & CONSTRUCTION VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT.
Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
VOLUSIA TRANSPORTATION PLANNING ORGANIZATION (TPO) NOVEMBER 27, 2012 Craig Coffey, County Administrator 1.
FY Budget Worksession Parks & Recreation Division July 13, 2015.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
County of Fairfax, Virginia Transportation Priorities Plan Future Updates 1 Ray Johnson and Tom Biesiadny Fairfax County Department of Transportation Board.
Business Leaders for Transportation By Linda Wheeler TFIC Sept. 7, 2007.
Transportation Projects City Council Workshop May 14, 2013.
Waupaca County Highway 5 Year Plan We build and maintain a quality transportation system for the safety and prosperity of current and future.
TYPE OF WORK FY 2015 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT PE CTH K -- Rural Road.
Row No. Des # Sponsor Route Work Category Work Type Location County Des Length Federal Fund Type Phase Year Total Cost Federal Funds Non-Federal Funds.
Polk Transportation Planning Organization 2035 Mobility Vision Plan Nov./Dec Draft Amendments to the Polk 2035 Mobility Vision Plan (MVP) Steering.
Goforth Road – Status Update September 16, 2014 I.Typical Sections & Pavement Design II.Budget & Preliminary Cost Estimate III.Schedule IV.Extension from.
MED SR 18 Corridor Project MED PID October 13, 2015.
Makeshift Surfaces. Main Street - Re-Profiling Of Travel Surface. Insufficient Funds For Full Overlay.
Metric to English Conversion California Bridge Construction Forum March 8, 2006 Mark Leja, Chief, Division of Design California Department of Transportation.
TYPE OF WORK FY 2014 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT PE CTH II -- Winnebago.
Tonight’s Schedule Introduction Presentation Question and Answer Session Open House Staff at displays to answer questions Complete comment cards and/or.
Proposed TIF-Funded Road Improvements: TIF 7 North Tarrant Parkway Presented by Jay Chapa, Assistant City Manager April 12, 2016.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Chapel Hill Parks and Recreation. “Networks of natural spaces which provide corridors connecting areas such as neighborhoods, parks, and schools.
Introduction U.S. Army Corps of Engineers Metro Parks Mayor’s Office Metro Council District Representatives HDR, Inc.
TxDOT Street Projects Eldorado Parkway Widening FM423 North Widening Oak Grove Pkwy (FM 720) US 380 Widening (from Denton to Collin County line)
Yuma County Report Roger A. Patterson, P.E. County Engineer June 5, 2008.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Preliminary Estimated Cost
The Central Avenue Connector Trail
Infrastructure Investment Needs
Transportation Projects
North Main Street Intersection Improvements at Route 460 Bypass
Pavement Performance Measures In Georgia
PROJ. 566(17) LOR PID MAJOR WIDENING
Monterey County Project Report for Measure X Expenditures
Space Coast TPO State Road (S.R.) 528 Update
Presentation transcript:

Proposed State Highway Projects: Kendall County September 20, 2007 Region 2/District 3 Illinois Department of Transportation

Project Map IL 47 Caton Farm Rd. to I-80 Prairie Parkway I-80 to I-88 IL 25 Waubonsee Creek IL 71 Orchard Rd. to US 34 IL 71 IL 47 to Orchard Rd. US 34 thru Sandwich to Plano IL 47 Countryside Pkwy. to Cross St. in Sugar Grove US 34 Big Rock Ck. to IL 47 US 34 IL 47 to Orchard Rd. IL 47 IL 71 to Countryside Pkwy. PE I PE II

Project Status PE I Engineering Complete Right of Way Plans Complete PE II Engineering 95% Complete – widening to 5-lanes proposed Construction Unfunded (Potential Capital Improvement Project) IL 47 from IL 71 to Countryside Parkway in Yorkville

Project Status PE I Engineering in FY Plan Advance engineering started on BNSF underpasses, Blackberry Creek bridge, Survey PE II Engineering, Land Acquisition, Construction Unfunded – note Yorkville ROW Permit IL 47 from Countryside Parkway in Yorkville to Cross Street in Sugar Grove

Project Status PE I Engineering included in Prairie Parkway study – 95% complete. Widening to 4-lanes proposed PE II, Land Acquisition, Construction Unfunded IL 47 from Caton Farm Road to I-80

Project Status PE I Engineering complete. Widening to 4-lanes and 5-lanes proposed PE II, Right of Way Plans underway Land Acquisition and Construction is funded in FY Plan IL 71 from Orchard Road to US 34

Project Status PE I Engineering in FY Plan PE II Engineering, Land Acquisition, Construction Unfunded IL 71 from IL 47 to Orchard Road

Project Status Structurally deficient PE I Engineering completed PE II Engineering and land acquisition underway Scheduled for the 2008 construction season. IL 25 Waubonsee Creek bridge in Oswego

Project Status PE I Engineering to be started in FY 2008 PE II Engineering is funded in FY Plan Land Acquisition, Construction Unfunded Many design possibilities – this will be a “full CSS” project. US 34 Thru Sandwich to Chilton Way in Plano

Project Status PE I and II Engineering is funded in the FY Plan A portion will be built with Prairie Parkway, other portions will be built by developers (Kendall Marketplace) or IDOT District 3 is engineering the segment between Cannonball Trail and Center Parkway with its in-house staff No construction funding except for the Prairie Parkway segment from Big Rock Creek to west of Eldamain; however, developers will also build some portions by permit US 34 from Big Rock Creek to IL 47

Project Status PE I Engineering is underway and a public meeting held. Widening to 4-lanes and 5-lanes proposed PE II Engineering is funded in the FY Plan Land Acquisition and Construction are unfunded; however, developer (Wal-Mart) is expected to build a 4-lane segment on the west end. US 34 from IL 47 to Orchard Road

Project Status PE I Engineering is 95% complete PE II engineering from IL 71 to US 30 will soon begin. Land Acquisition (IL 71 to US 30) and Construction (IL 71 to US 34) are funded in the FY Plan Prairie Parkway from I-80 to I-88

Questions? George F. Ryan, P.E. - Regional Engineer Rick Powell, P.E. – Studies & Plans Engineer Illinois Department of Transportation 700 E. Norris Drive Ottawa, IL (815)