展躍光電科技股份有限公司 Company Profile

Slides:



Advertisements
Similar presentations
Chapter 2. Customer service The group of utilities or benefits the customer expects from the supplier.
Advertisements

元耀科技股份有限公司 YENYO TECHNOLOGY CO., LTD. Company Profile 08/25/2003 A member of Thinking Electronic Industrial Co., Ltd.
Accelerated Thinking SM 1IDT© IDT CONFIDENTIAL MAXIMIZE THE PERFORMANCE OF YOUR SUPPLIERS THROUGH COLLABORATIVE GOAL–SETTING AND SCORECARDS James Shih.
Function Statement Calibration Reliability test Life test Vibration test Dropping test Quality system audit Incoming inspection Vendor survey Vendor evaluation.
Conquer 1 Conquer Electronics Thin Film Chip Fuse Introduction.
Objectives of Pletronics Quality System Providing well defined quality metrics for each department within Pletronics, bringing problem areas into the open.
JPCI CONTROLS Ultimheat
Understanding Target Audience Behavior 瞭解顧客之行為 將公司標幟插入此投影片 選取〔插入〕功能表 中的〔圖 片〕選項 選取〔從檔案〕指令 選取該圖片檔案 按下〔確定〕按鈕 調整商標的大小 於商標圖示內按一下﹐此時商標 圖示外的白色小方塊即為可調整 大小的圖框。
CH-23 失效原因樹分析 FTA Failure Tree Analysis. 前言 為了提昇系統可靠度,產品在開發階段,利 用類似品管方法之魚骨圖分析手法,找出潛在 缺點,並加以改進,此種分析方法稱之為失效 原因樹分析法 (Failure Tree Analysis)– FTA 。 FTA 是一種系統化的方法,可以有效的找出.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc.,All Rights Reserved. 參 實驗法.
決策與公司治理 本章內容 決策的基本概念 理性決策與受限理性決策 組織的決策 高階管理者的決策與控制-公司治理 Chapter 10
進入實習機構(一): 實習過程中之關係建立
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
NCKU EMBA 習題解答 Chapter /11/ Six – year saving (40,000-25,000)x6 $ 90,000 Cost of new machine (60,000) Undepreciated cost of old machine (30,000)
Chap 1 Introduction to Six Sigma 指導老師:郭倉義 博士 研究學生:張清和 The Six Sigma Revolution.
1  7 月 25 日前將各項支出之發票、收(領)據送會計 室 屬於 98 年 7 月底前之差旅費、人事費及其他各項支出之發 票、收(領)據,請於 7 月 25 日前送會計室(預算組) (各項請款支出之發票或收據日期以 98 年 7 月底前為準)  8 月 5 日前將核准後之憑證單據送會計室 核准後之憑證單據請於.
Department of Air-conditioning and Refrigeration Engineering/ National Taipei University of Technology 模糊控制設計使用 MATLAB 李達生.
Chapter 6 Total Quality Management Chapter Outline Quality imperative.
Drive for better vision Himax Technologies, Inc. 奇景光電股份有限公司 Himax QA Presentation.
 Prentice Hall Chapter 61 績效評估控制系統.  Prentice Hall Chapter 62 學習目標 描述控制程序的步驟 指出行為控制的方法 描述 EOQ 模式的目標 比較資料與資訊.
行政院國家科學委員會工程技術發展處自動化學門 * 試以國立成功大學製造工程研究所 鄭芳田教授 產學合作計畫 : 智慧預測保養系統之設計與實作 成果報告盤點為範例 國科會工程處專題計畫成果典藏 自動化學門成果報告盤點範例.
 Prentice Hall Chapter 81 組織設計.  Prentice Hall Chapter 82 學習目標 了解組織結構的六項特徵 比較機械式與有機式的組織設計 解釋造成結構差異的四項權變性變數 解釋環境的不確定性如何影響組織結構.
第二十一章 研究流程、論文結構        與研究範例 21-1  研究流程 21-2  論文結構 21-3  研究範例.
ISO-9000系列品質保證系統 一、ISO 9000系列架構圖 二、ISO 9000系列簡介 三、ISO9000系列之目的與作用
SINBON ELECTRONICS CO., LTD. 1. Booking Information 2. Billing Information 3. Order Analysis 4. Productivity Status 5. Quality Status 6. Delivery Reliability.
什麼是科技 科技改變了什麼 人 與科技 教育與科技 我能做什麼. 什麼是科技 不是我們身體的一部份, 是科學的, 經由 製造而來的, 是有實用目的。 配合 人類在身體或精神上的行動, 有所 思 考 發生, 或是使用工具, 可能是有形的 或 是概念的。 組織 團體 機構 。 人與人之間的互動 道德層面的觀點,
廣電新聞播報品質電腦化 評估系統之研發 國立政治大學 資訊科學系 指導教授:廖文宏 學生:蘇以暄.
智勝文化事業有限公司製作 行銷管理 ( 再版 ) 林建煌 著 第六章 組織市場與其購買行為. 智勝文化事業有限公司製作 行銷管理 ( 再版 ) 林建煌 著 組織購買者的類型  製造廠商  中間商  服務性組織  政府組織  非營利機構.
概念性產品企劃書 呂學儒 李政翰.
1 © 2011 台灣培生教育出版 (Pearson Education Taiwan). 2 學習目標 1. 當面對可預測的變異性時,同步管理並改善供應鏈 中的供給。 2. 當面對可預測的變異性時,同步管理並改善供應鏈 中的需求。 3. 當面對可預測的變異性時,使用總體規劃將利潤最 大化。
Reporter gene. Figure DNA chip 簡介 DNA chip 的操作原 理是利用 DNA 序列的配 對特性, 讓樣品與晶片上 對應的鹼基 (base) 進行 雜合反應 (hybridization), 藉以檢測樣品中的基因 表現, 晶片上每平方公分.
1 企業競爭中關係模式變革 ── 協同設計的營運衝擊 國立中央大學. 資訊管理系 范錚強 updated 7.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc.,All Rights Reserved. 壹 企業研究導論.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc.,All Rights Reserved. 壹 企業研究導論.
ERP 世新大學 ERP 實驗室 2003/11/4Oracle Inventory1 講師:莫明鳳、葉咏蓁 2003/11/4.
© 2011 台灣培生教育出版(Pearson Education Taiwan)
1 Chemical and Engineering Thermodynamics Chapter 1 Introduction Sandler.
啤酒遊戲- 供應鍊模擬 Dr. CK Farn 2006 Spring. 中央大學。范錚強 2 模擬設定 過度簡化的供應鍊 銷售桶裝啤酒 角色 工廠(倉庫) 配銷商 大盤商 零售商.
Walex Electronic Limited Designer and manufacture of cables.
About Us a. Company Profile b. Organization Chart c. Capacity d. Key Equipment Products Client Base Customers Production Process Vision Shanghai Dailyline.
DATE: 28/11/2012 INSTRUCTOR: HANIF ULLAH Tutorial 7.
Ledtech Electronics Corp. 華 興 集 團 Web Site : Presented by : Export Sales Dept. / Jeremy Date : Jan. 20, 2001 Taipei. Hong.
Front page 2013 PROFILE V2.0. Table of Contents  Company Profile  Product Lines & Production  Marketing & Logistics  Quality System  Certificates.
WELCOME. Part 1: Company Profile Established in Dec Head office in Taipei TWN Dongguan Bonteck Established in Jan people Kunshan Bonteck.
ISA Quality System. ISO9001-VISION2000 DNV (Det Norske Veritas) ISA Quality Manual Continuous improvement Manufacturing & control plans Procedures.
From Research Prototype to Production
Formerly Flextronics Beijing. About PRItronics Purchased October 15, 2004 from Flextronics. Purchased October 15, 2004 from Flextronics m 2 (29,000.
Company Profile Quality Display Solutions BIG CROWN TECHNOLOGY CO.,LTD.
Ch10-Ch ORGANIZATION Definition  Organizing, Organizational Structure / Design Organization Structure (6 Key Elements)  Work specialization 
Company Introduction Address : Address : No. 97-1, 2 Lin, HaiHu Village, LuJhu Township, TaoYuan County 338, Taiwan. TEL : FAX :
Company Profile XIAMEN G&P ELECTRONICS CO., LTD. Jiayi Industrial Park, Huli District Xiamen, Fujian province, China TEL: FAX:
1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov
Established on May 1, 2002 SBtron Korea
1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov
Software Quality assurance SQA – SWE 333
Chapter 24 Stock Handling and Inventory Control Section 24.1 The Stock Handling Process Section 24.2 Inventory Control Section 24.1 The Stock Handling.
Ch. 9 Product Development ( 商品企劃 ) and Design the creation and making of a product.
Established in : September 2006 Total fixed-assets : HKD300,000,00 Plant area : 20,000 square meter Employees : 800 Main products : Linear Adapter, Switch.
FINALIZE model for the design process 王毅欣 吳峻逵 林柏均 莊惠心.
傳 統 印 刷 電 路 板 流 程 介 紹傳 統 印 刷 電 路 板 流 程 介 紹 傳 統 印 刷 電 路 板 流 程 介 紹傳 統 印 刷 電 路 板 流 程 介 紹 Conventional PCB Manufacturing Process 1 SHEARING D/F PHOTO IMAGE.
Greatest Tech Company  그림 or 회사로고 삽입. OVERALL CEO & PRESIDENT NAME ESTABLISHED Feb CAPITAL \5.2 Billion (USD 4.3M) EMPLOYEE 100 (Present) INDUSTRY.
Designer and Manufacturer of electrical components and PCBAs.
Electronic Assembly Quality and Standards
Company Profile About JAVA-TECH : Cable assembly Wire harness
Kenneth Lin Vice President BIOTEQUE CORPORATION 4107
Function Statement QC&A Department VQA/IQC IPQC OQC QE Incoming
Quality as Organization Culture at rh
UNDERSTANDING FOR STANDARD
IHAAB Component Systems AB
Presentation transcript:

展躍光電科技股份有限公司 Company Profile

Taipei Office

China Factory

Company Profile Establishment Date : December 2008 Total Capital : USD 500,000 President : Mr. Peter Ouyang Business Activities : OEM/ODM manufacturing for LED Products Total Employees : 100 in Taiwan/160 in China ISO9001 : Certified on July 2009 ISO 14001 : Certified in China Factory

Company Vision The Perfect Supplier for LED Products. From LEDs Components to PCB Assembly, OP’s goal is to be your reliable, one stop, total solution partner.

Best Quality Best Customer Service Competitive Price Fast Delivery Company Philosophy Best Quality Best Customer Service Competitive Price Fast Delivery

Our Advantages Wide Selection of products Design Flexibility Product Customization LED + Board Production Control Engineering Support

Major Products Line SMD Display Through Hole Display. Custom Display LED resolution. LED Lamp

Display Category Numbering Display – 7 segment a. Epoxy Type b. Air Type – the shape can be tilt, round, square and any shape the customer needs.

Display Category Numbering Display – 7 segment c. Surface Mound Display Type

Display Category 2. English Alphabet Display a. Alphanumeric Display b. Dot Matrix Display c. Icon Display

Display Application Home Appliance – Icon Display (Graphic Display – 7 segment + Icon + Film)

Display Application Consumer Electronic Device– Icon Display (Graphic Display – 7 segment + Icon + Film)

Display Application Instrument – 7 segment Display

Display Application Moving Sign– Dot Matrix

Display Application Sign-Alphanumeric Display

Display Application SMD Display – Surface Mount Display

LED Application LED Lam

Process Flow Chart For Display ( 1 ) Material 物料 Process 流程 Process Control 製程管制 Pin PCB Insert Pin 插Pin Press Pin 壓Pin Clean PCB 清洗PCB Silver Epoxy Dice Mount Sampling Inspection one time / half hr. ( Major for Dice location )固晶 Dice IPQC L/A 品管抽檢 CR:0.25%,MA:0.4%,MI:1.0% Silver Epoxy Curing Sampling Inspection two times / shift ( Major for Curing condition )銀膠烘烤 Gold Wire Wire Bonding Sampling Inspection one time /hr. ( Major for wire Loop & connection status )打線 RWK Vacuum Pumping (To expel epoxy’s air bubble) Epoxy Prepare Reflector Prepare IPQC L/A 品管抽檢 CR:0.25%,MA:0.4%,MI:1.0% REJ I/L Test 100% inspection 前測 in - Line ( Electrical test ) Tape Prepare IPQC L/A 品管抽檢 CR:0.25%,MA:0.4%,MI:1.0% Encapsulate 灌膠

Process Flow Chart For Display ( 2 ) Material物料 Process製程 Process Control製程管制 Post Curing 膠烘烤 RWK Hot Test 100% Test 熱測 100% Visual Inspection. 外觀檢驗 Attach Film 貼膜 Final Test 100% Test 後測 ( Part No. Date code……..) 蓋印 Marking 100% Inspection REJ Packing Tray FQC L/A AQL: MIL-STD-105E品管抽檢 CR:0.065%,MI:0.4%,MI:1.0 Electrical test /Visual Inspection Quality Control Lot Acceptance inspection Packing 包裝 AQL: Acceptance Quality Level that is one of Quality control Sampling methods from Military standard. Stock 倉庫 OQC L/A品管抽檢 check total packing box 1/3 check customer name/part no./quantity/ customer requests Shipping 出貨

QA Organization Chart Reliability F/A Calibration QA/CS QA Manager DCC IQC/IPQC/OQC DQA/DCC

RELIABILITY TESTING FLOW Reliability Test Sampling Production Process Per QS/PFC Long - Term Test Short - Term Test Test Result Judgment OK Continue Shipment & Production Abnormal Notice & Failure Analysis ● Stop Shipment ● Notify Customer Call Back ● Take Corrective Actions Verification & Standardization NG NEW PRODUCTS PROCESS CHANGE CUSTOMER REQUIREMENT PROCESS/PRODUCTS IMPROVEMENT

Reliability Test for LED Displays CLASSIFICATION TEST ITEM TEST CONDITION S/S Ac/Re CRITERIA Reference Standard ENDURANCE OPERATION LIFE Ta: Under Room Temperature 13PCS 1.VF arise ≧10% TEST IF= 12~25mA Per segment 0/1 2.IV decline ≧30% CNS13089 TEST TIME:1000hrs(-24hrs,+72hrs) 3.A failure is an LED that is open or shorted CNS13090 HIGH TEMPERATURE Ta:65℃±5℃ HIGH HUMIDITY RH:90~95% CNS5071 STORAGE TEST TIME:240HRS±2hrs Ta:85℃±5℃ CNS7747 LOW TEMPERATURE Ta:-35℃±5℃ CNS6118 ENVIRONMENTAL THERMAL SHOCK 85℃±5℃~-35℃±5℃ 30min 30min 30CYCLES CNS5069 TEMPERATURE CYCLING 85℃~25℃~-35℃~25℃ 30min ~5min~ 30min~5min CNS5070 SOLDER RESISTANCE T,sol: 260℃±5℃ DWELL TIME : 10±1sec CNS5067 Frequency: I time       SOLDERABILITY T,sol: 230℃±5℃ DWELL TIME : 5±1sec Frequency :I time CNS5068 Remarks:

Reliability Test Equipment Operation Life Test

High Temperature Storage Reliability Test Equipment High Temperature Storage

Low Temperature Storage Reliability Test Equipment Low Temperature Storage

Reliability Test Equipment Temperature Cycling

Supplier take corrective action Flow Chart of IQC Operation Supplier take corrective action Meet QVL / QPL Incoming Return to Vender INSP MRB Screen Return to Supplier Waive Warehouse QC Audit NG NO PASS REJ SCAR YES

Customer Quality Complaint Disposition Procedure CCR CCAR RTN GOODS ? RMAR Reply RML CLOSE UP No REJ Process Reps. Sales QA Sales / QA Sales / QA / PC Yes Acc

What’s 8D ? “D” discipline 紀律 It’s a TOPS ( Team Oriented Problem Solving ). * 利用團隊解決問題 1D. Organize a team. 1. 成立工作團隊. 2D. Problem Description 2. 敘述問題. 3D. Containment Action(s). 3. 採取緊急應變對策. 4D. Root Cause(s). 4. 定義並驗證根本原因. 5D. Corrective Action(s). 5. 採取改正行動. 6D. Verification of Corrective Action Effectiveness. 6. 確認改正行動有效性. 7D. Actions Taken to Prevent Reoccurrence. 7. 採取預防再發行動. 8D. Congratulate Your Team. 8.肯定團隊的貢獻.

STRATEGIES FOR CUSTOMER SATISFACTION IN QUALITY  QUALITY ― Operation to be a coordinator for improvement action. ― Implement “ 8D “ process for CCAR. ― Upgrade failure analysis capability.  RESPONSE TIME ― Preliminary analysis report issues within 48 hrs ( When customer request ). ― Formal analysis report issues within 5 days ( 3 days for key customer ).

Production Line in Taipei

Production Line in Taipei Dice Mount

Production Line in Taipei Wire Bonding

Production Line in Taipei Encap Resolution

Production Line in Taipei Test

Production Line in Taipei Packing Station

Production Line in China Engineer & QC

Production Line in China Dice Mount

Production Line in China Wire Bonding

Production Line in China Encap Revolution

Production Line in China Manual Station