RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee 14.10.2011.

Slides:



Advertisements
Similar presentations
Sharing of ISTS Charges & Losses Regulation
Advertisements

1 FREQUENCY CONTROL -- Bhanu Bhushan -- (April, 2011)
ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Queries raised by Director (Tariff) on ARR and Tariff Application of NESCO for FY on
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Wind Power Forecasting Indian Wind Turbine Manufacturer's Association.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Renewable Energy Hedges 101 SNHU Office of Sustainability and Eco Power Hedge, LLC © EPH, LLC 2007 E co Power Hedge.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
Understanding Financial Management
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
Module on Computation of PoC Transmission Charges
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Billing, Collection and Disbursement Procedures
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Copyright© JSE Limited ROLLING OF SETTLEMENT AND FAILED TRADE PROCEDURES Brett Kotze Clearing & Settlement Division 05 August 2008.
REVISION OF SCHEDULES/REQUISITIONS A)OUTAGE OF GENERATING UNIT B) REVISED DECLARATION OF AVAILABILITY BY CGS C) OUTAGE OF A TRANSMISSION ELEMENT D)UNFORESEEN.
1 Regional Energy Accounting, Disputes Mechanism and Resolutions -Rakesh Goyal & Asit Singh. -Executive Engineer, -SRPC, Bangalore.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
CERC (Power System Development Fund) Regulations 2010.
Comments on CERC’s Staff Paper: Developing a Common Platform for Electricity Trading S. A. Khaparde, A. R. Abhyankar and V. Sarkar Indian Institute of.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
Commercial Points for 93 rd OCC meeting. Change in Bank a/c New Account for Deviation Settlement opened in Axis Bank Name of the A/C : Power System Operation.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
Sharing of Inter-State Transmission Losses 11/29/
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI& Reactive charges Tamilnadu to pay 100Crs. as UI charges and 2Crs. as Reactive.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI & Reactive charges Tamilnadu still to pay 74Crs. as UI charges during
1 SCOPE OF THE PRESENTATION Grid operation - overview Availability Based Tariff Benefits to Region & it’s constituents Intra_state ABT – it’s necessity.
Regulatory Framework in Indian Power Sector Module C5 V K Agrawal ED, NLDC POSOCO.
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Renewable Regulatory Fund (RRF):- Implementation Mechanism
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
UI POOL FINANCIAL SETTLEMENT & PAYMENT SECURITY OPTIONS.
Philippine Feed-In Tariff System Implementation 1.
Availability Based Tariff (ABT) in Northern Region.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
Issues related to UI pool. Payment to pool account by KPTCL and Pondy Till June 2010 payment to UI pool by KPTCL and Pondy was through cheque/DD. Pondy.
Extract from Annexure-1 on ‘Complementary Commercial Mechanisms of Indian Electricity Grid Code ’12(a) Weekly bills shall be issued to the constituents.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
Commercial Issues for 73 nd OCC TN opened LC for Rs.5Crs for UI payment delays during TN to enhance the LC amount to 32.84Crs as per their liability.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
AVAILABILITY BASED TARIFF. - Tariff structures - Two part tariff - Concept of ABT - ABT structure - Expectations from OEMs/Utilities Session outline.
Point of connection Mechanism
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
F8: Audit and Assurance. 2 Designed to give you knowledge and application of: Section A: Audit Framework and Regulation Section B: Internal audit Section.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
SEMINAR ON GST LAW VALUATION
Operationalizing One Nation One Grid
Open Access.
Open Access.
Margin Financing System (MFS)
Scheduling of Collective Transactions Through Power Exchange
Congestion regulations
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Presentation transcript:

RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee

Responsibility of Energy Accounting As per “Procedure for Implementation of the Mechanism of Renewable Regulatory Fund” para 8.1 – All accounts related to accounting of energy from wind farm and solar generation, shall be prepared by RPC on a weekly basis, based on inputs from the concerned RLDC.

INPUT TO RPCs Intra-State entities : Details of Contracts along with contracted price to the concerned RPC and RLDC through the respective SLDC. Regional entities : Details of Contracts along with contracted price through the respective RLDC to the concerned RPC. Processed data (data of scheduled generation and actual generation of wind farm/solar generator and the deviations of generation) on a weekly basis from RLDC

Energy Accounting of Wind Generator No UI would be payable/receivable by Generator, if actual generation within +/- 30% of the schedule UI charges for within this variation, would be settled through RRF by the host state For generation between 130% to 150% and below 70% of Schedule, UI will be settled between state and generator. State to get settle through RRF. Generation above 150% of schedule, the charge payable to the wind energy generator would be the UI charge applicable corresponding to HZ (Presently 155 Paise/KWh)

Energy Accounting of Wind Generator (Intra-State) The transactions would be between the wind generator and the host State at the contracted rate for actual generation. The implication due to deviations of actual generation within +/- 30% of the scheduled generation would be settled through the RRF. The implication due to deviations outside +/- 30% would be settled directly between the host State and the Wind Farm

Energy Accounting Wind Generator (Intra State) : Case 1 GS =100 MW, AG=120 MW StateGenerator 120 MW x CR StateRRF 20MW x (UI-CR) 20MW x (CR-UI) StateRRF (UI Rate – UI Cap Rate) To the extent of UD subjected to it, if any

Energy Accounting Wind Generator (Intra State) : Case 2 GS =100 MW, AG=80 MW StateGenerator 80 MW x CR StateRRF 20MW x (UI-CR) 20MW x (CR-UI) StateRRF Additional UI, To the extent of OD subjected to it, if any

Energy Accounting Wind Generator (Intra State) : Case 3 GS =100 MW, AG=140 MW StateGenerator 140 MW x CR StateRRF 30MW x (UI-CR) 30MW x (CR-UI) StateRRF (UI Rate – UI Cap Rate) To the extent of UD subjected to it, if any StateGenerator 10MW x (UI-CR) 10MW x (CR-UI)

Energy Accounting Wind Generator (Intra State) : Case 4 GS =100 MW, AG=60 MW StateGenerator 60 MW x CR StateRRF 30MW x (UI-CR) 30MW x (CR-UI) StateRRF Additional UI, To the extent of OD subjected to it, if any StateGenerator 10MW x (UI-CR) 10MW x (CR-UI)

Energy Accounting Wind Generator (Intra State) : Case 5 GS =100 MW, AG=160 MW StateGenerator 150 MW x CR StateRRF 30MW x (UI-CR) 30MW x (CR-UI) StateRRF (UI Rate – UI Cap Rate) To the extent of UD subjected to it, if any StateGenerator 20MW x (UI-CR) 20MW x (CR-UI) StateGenerator 10MW x (UI rate at 50 Hz)

Energy Accounting of Wind Generator (Inter-State) The transactions would be between the wind generator and the purchasing State at the contracted rate for actual generation upto 150% of the scheduled generation. The difference of actual generation from the schedule for the purchasing State would be settled at the UI rate of the Region of the purchasing State through the RRF. The implication due to deviations of actual generation within +/- 30% of the scheduled generation would be settled with the host State through the RRF. The deviations outside +/- 30% would be settled directly between the host State and the Wind Farm.

Energy Accounting Wind Generator (Inter State) : Case 1 GS =100 MW, AG=120 MW Purchasing StateGenerator 120 MW x CR Purchasing StateRRF 20MW x Region UI rate Host StateRRF (UI Rate – UI Cap Rate) To the extent of UD subjected to it, if any Host StateRRF 20MW x Region UI rate

Energy Accounting Wind Generator (Inter State) : Case 2 GS =100 MW, AG=80 MW Purchasing StateGenerator 80 MW x CR Purchasing StateRRF Host StateRRF Additional UI, To the extent of OD subjected to it, if any Host StateRRF 20MW x Region UI rate

Energy Accounting Wind Generator (Inter State) : Case 3 GS =100 MW, AG=140 MW Purchasing StateGenerator 140 MW x CR Purchasing StateRRF 40MW x Region UI rate Host StateRRF (UI Rate – UI Cap Rate) To the extent of UD subjected to it, if any Host StateRRF 30MW x Region UI rate GeneratorRRF 10MW x (CR-UI) 10MW x (UI-CR) Host StateRRF 10MW x Region UI rate

Energy Accounting Wind Generator (Inter State) : Case 4 GS =100 MW, AG=60 MW Purchasing StateGenerator 60 MW x CR Purchasing StateRRF Host StateRRF Additional UI, To the extent of OD subjected to it, if any Host StateRRF 40MW x Region UI rate GeneratorRRF 10MW x (UI-CR) 10MW x (CR-UI)

Energy Accounting Wind Generator (Inter State) : Case 5 GS =100 MW, AG=160 MW Purchasing StateGenerator 150 MW x CR Purchasing StateRRF 50MW x Region UI rate Host StateRRF (UI Rate – UI Cap Rate) To the extent of UD subjected to it, if any Host StateRRF 30MW x Region UI rate Host StateRRF 20MW x Region UI rate GeneratorRRF 20MW x (CR-UI) 20MW x (UI-CR) Host StateGenerator 10MW x (UI rate at 50 Hz)

Energy Accounting of Solar Generator No UI would be payable/receivable by Generator In the case of intra-State sale of solar energy, the host State would pay the solar generator at the contracted rate for actual generation. In the case of inter-State sale of solar energy, the purchasing State would pay the solar generator at the contracted rate for actual generation. The implication of UI charges due to the deviation for purchasing State and host State would be settled through the RRF.

Energy Accounting Solar Generator (Intra State) : Case 1 GS =100 MW, AG=120 MW StateGenerator 120 MW x CR StateRRF (UI Rate – UI Cap Rate) To the extent of UD subjected to it, if any

Energy Accounting Solar Generator (Intra State) : Case 2 GS =100 MW, AG=80 MW StateGenerator 80 MW x CR StateRRF Additional UI, To the extent of OD subjected to it, if any

Energy Accounting Solar Generator (Inter State) : Case 1 GS =100 MW, AG=120 MW Purchasing StateGenerator 120 MW x CR Purchasing StateRRF 20MW x Region UI rate Host StateRRF (UI Rate – UI Cap Rate) To the extent of UD subjected to it, if any Host StateRRF 20MW x Region UI rate

Energy Accounting Solar Generator (Inter State) : Case 2 GS =100 MW, AG=80 MW Purchasing StateGenerator 80 MW x CR Purchasing StateRRF Host StateRRF Additional UI, To the extent of OD subjected to it, if any Host StateRRF 20MW x Region UI rate

Statement Of Energy Account The statement of energy account shall consist of : – Energy charges at contract rate to be payable by states to the generators. – Charges payable/receivable by states to/from RRF – Charges payable/receivable by generators to/from states, on account of difference between lower limit of schedule after which wind farm is responsible and actual generation

Statement Of Energy Account Charges payable/receivable by states to/from RRF consist of : – UI charge settlement of wind generators within +/-30% of schedule – Charges receivable by host state from RRF on account of the difference between the UI rate and the cap UI rate for under- drawal beyond the percentage prescribed in the UI Regulations, to the extent of under-drawal subjected to it, if any, on account of net over-generation by solar and wind farms in the State as a whole. – Charges receivable by host state from RRF for total or part difference between the total schedule and total actual generation of solar and wind generation collectively in the state as a additional UI rate, to the extent subjected to it, if any, on account of net solar and wind farm under-generation for the State as a whole.

Schedule of Payments Constituent have to pay the indicated amounts within 10 (ten) days of the issue of the accounts by the Secretariat of the respective RPCs If payments delayed by 2 days, defaulting constituent shall have to pay simple 0.04% for each day of delay All payments to the wind farm or solar generation/ purchasing State/host State entitled to receive any amount from the Renewable Regulatory Fund shall be made within 2 working days of receipt of the payments into the “Renewable Regulatory Fund”. The net leftover amounts in the RRF, whether positive or negative, which is to be shared among all the States/UTs of the country/DVC in the ratio of their peak demands met, on a monthly basis,

THANKS

Settlement of Accounts Sale of power to two or more States, the deviation of actual generation from the schedule : proportion to the shares of the States in the generation of the Wind Farms/Solar Generators. The host State will receive compensation from the RRF for total or part difference between the total scheduled generation and total actual generation of solar and wind generation collectively in the State as a additional UI rate, to the extent subjected to it, if any, on account of net solar and wind farm under-generation below the frequency specified in the CERC (Unscheduled Interchange and related matters) Regulations, for the State as a whole.

Settlement of Accounts The Host State would also receive from the RRF, the difference between the UI rate and the cap UI rate for under-drawal beyond the percentage/MW prescribed in the UI Regulations, to the extent of under-drawal subjected to it, if any, on account of net over-generation by solar and wind farms in the State as a whole.