Japan Aerospace Exploration Agency K.Kawate, M. Miyoshi, S. Nakamura and S. Kogure H.Soga and A.Yasuda and University of.

Slides:



Advertisements
Similar presentations
Nick Talbot Research Fellow, Trimble Navigation Australia
Advertisements

2013 Western Australia Surveying Conference
4 th AOR W/S on GNSS Kuala Lumpur, Malaysia Dec. 8-10, 2012 Multi-GNSS Augmentation by L1-SAIF Signal: Preliminary Results Multi-GNSS Augmentation by L1-SAIF.
1 1 COMPASS Satellite Navigation System Development Nov. 26 th -28 th, 2008, Beijing China Satellite Navigation Project Center SIDEREUS 2008.
The leading pioneer in GPS technology The StarFire Global Satellite Based Augmentation System Ron Hatch NavCom Technology, Inc.
FIX_8 (High Accuracy Positioning using EGNOS and Galileo Products) Galileo SME Workshop 5 th & 6 th April 2006.
Tokyo University of Marine Science and Technology T. Takasu, T. Ebinuma and A. Yasuda 2009 International Symposium on GPS/GNSS Effect of Quasi Zenith Satellite.
Leica GPS Spider Setting the Standard for GPS Networks Mark Burbidge MRICS MinstCES GNSS Network Manager – Leica Geosystems.
Activities on GNSS Implementation in Korea APEC GIT/15 Meeting June 13~17, 2011 June 13~17, 2011 Brisbane, Australia The 15th Meeting of the APEC GNSS.
Solar Disturbance of GPS Satellite Orbits Merita Halili Orhan Veliu 06 june 2008.
1 GPS and GNSS Activities in Hong Kong Simon C W KWOK Geodetic Survey Section Lands Department Hong Kong 35th Civil GPS Service Interface Committee Fairfax,
© GMV, 2008 Property of GMV Aerospace and Defence S.A.; all rights reserved USE OF SLR OBSERVATIONS TO IMPROVE GALILEO GIOVE-B ORBIT AND CLOCK DETERMINATION.
Real-Time Orbit And Clock Estimation Using PANDA Software Shi C, Lou YD, Zhao QL, Liu JN GNSS Research Center, Wuhan University, China IGS Analysis Center.
Real-Time Precise Point Positioning Utilising the Japanese Quasi-Zenith Satellite System (QZSS) LEX Corrections Suelynn Choy1, Ken Harima1, Shaocheng Zhang1,
Global Navigation Satellite System 1 G N S S WEB-simulation.
Geodetic Survey Division EARTH SCIENCES SECTOR Slide 1 Real-Time and Near Real-Time GPS Products and Services from Canada Y. Mireault, P. Tétreault, F.
AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, GNSS.
Introduction QZSS (Quasi-Zenith Satellite System) program:
Refinement of maritime users needs, Brussels December 18, 2002 The Galileo support to the Search and Rescue Programme (SAR/Galileo)
DORIS - DAYS Toulouse May 2-3, 2000 DORIS Doppler Orbitography and Radiopositioning Integrated by Satellite  Basic system concept  Main missions  Schedules.
Radio Technical Commission for Maritime Services
Status of Multi-GNSS Monitoring Network Establishment Japan Aerospace Exploration Agency Satoshi Kogure APEC GIT/15 June 14, 2011.
RFWG report ______________________ IGS 39th Governing Board Meeting San Francisco, 3 December
ENC-GNSS 2006 – Manchester, UK Civil GPS Interface Committee International Sub-Committee May 7, 2006 John E. Augustine Acting Director, Office of Navigation.
GLONASS Government Policy, Status and Modernization
CGSIC / International Subcommittee Japan’s Update at Savannah, 2009/SEP/22 Presented by Hiroaki Maeda.
User Requirements for GNSS Interoperability at Global, Regional, National and Local Scales Matt Higgins Co-Chair of Working Group D of the International.
Introduction QZSS (Quasi-Zenith Satellite System) program:
GLONASS Government Policy, Status and Modernization
T. Sakai, S. Fukushima, N. Takeichi, and K. Ito Electronic Navigation Research Institute, Japan T. Sakai, S. Fukushima, N. Takeichi, and K. Ito Electronic.
Class 19 – NAVSTAR GPS, GLONASS and Galileo
VRS Network The Magic Behind the Scene
Ground Support Network operations for the GRAS Radio Occultation Mission R. Zandbergen, the GRAS GSN team (ESOC) and the Metop GRAS team (EUMETSAT) 09/09/2011.
GRUAN GNSS Precipitable Water (GNSS-PW) Task Team: 10 members from 7 countries 1 Seth Gutman John Braun June Wang Galina Dick & Jens Wickert Gunnar Elgered,
TECO-2006 Geneva, Dec. 3-5, Improvements in the Upper-Air Observation Systems in Japan M. Ishihara, M. Chiba, Y. Izumikawa, N. Kinoshita, and N.
IGS Workshop 2008 The Galileo Ground Mission Segment Performances Francisco Amarillo-Fernandez, Massimo Crisci, Alexandre Ballereau John Dow, Martin Hollreiser,
Real-time IGS Network Management and Data Exchange Interfaces Georg Weber, BKG, Germany IGS Analysis Center Workshop, Miami Beach, Florida, 2-6 June 2008.
T. Sakai, H. Yamada, S. Fukushima, and K. Ito Electronic Navigation Research Institute, Japan T. Sakai, H. Yamada, S. Fukushima, and K. Ito Electronic.
ESOC Navigation Support Office EGU Vienna, , 1/18 Ground support network for the Metop GRAS atmospheric sounding mission R.Zandbergen, A.Ballereau,
IGS Analysis Center Workshop, 4 June 2008 Recommendations from “RT/NRT user requirements” 1.E-GVAP recommends IGS to support PPP strategy with high quality.
GSI Japan - 21st of June 1999 GPS-Positioning using Virtual Reference Stations - Theory, Analysis and Applications Herbert Landau Spectra Precision Terrasat.
Data centre support for the IGS-RT PP W. Söhne, H. Habrich, G. Weber Federal Agency for Cartography and Geodesy, Frankfurt am Main, Germany.
ALOS -Advanced Land Observing Satellite Using SLR, The GPS accuracy verification of ALOS JAXA Precise Orbit Determination Team S Nakamura, N Kudo, R Nakamura,
Meeting the Needs of the IGS Real-Time PPP User Community
QZSS (quasi-zenith satellite system) is a Japanese satellite navigation program with a regional service coverage. The orbits for QZS are 24-hour elliptic.
1 GPS Constellation Update International Workshop on the Use of Space Technology for Sustainable Development Rabat, Morocco April 2007 Dr. Fernando.
Presented by: Technical contributions from: THE INTERNATIONAL ASSOCIATION OF GEODESY AND PRECISE POINT POSITIONING.
Introduction QZSS (Quasi-Zenith Satellite System) program:
© ИАЦ КВНО ЦНИИмаш Собственность ИАЦ. All rights reserved GLONASS Status and Progress Sergey Revnivykh CGSIC Meeting , Savannah, GA, US.
1 SVY 207: Lecture 12 Modes of GPS Positioning Aim of this lecture: –To review and compare methods of static positioning, and introduce methods for kinematic.
Информационно-аналитический навигационный центр ЦУП-М ЦНИИмаш GLONASS Status. ILRS support for GLONASS. ILRS Fall 2005 Workshop October 2-7, 2005, Eastbourne.
View on GPS and Galileo ‘From across the Atlantic…’ Ruth E. Neilan International GNSS Service (IGS) Central Bureau Jet Propulsion Laboratory/California.
SHA: the GNSS Analysis Center at SHAO Junping Chen, Bin Wu, Xiaogong Hu Haojun Li, Xiao Pei, Yize Zhang Shanghai Astronomical Observatory (SHAO)
Munich SATNAV, Munich Satellite Navigation Summit February 21-23, 2006 Michael E. Shaw Director, U.S. National Space-Based PNT Coordination Office.
GPS Status and Modernization Munich Satellite Navigation Summit Munich, Germany 3 March 2009 Colonel David Buckman, US Air Force PNT Command Lead Air Force.
On the Way to Full PPP Potential Pierre Héroux Geodetic Survey Division, Natural Resources Canada.
Precision Measurements with the EVERGROW Traffic Observatory Péter Hága István Csabai.
ESOC Navigation Support Office IGS Workshop 2008 Miami IGS Real Time Pilot Project: Analysis Centre Activities Loukis Agrotis 4 June 2008.
Real-Time Working Group
Appliance of IceCORS network 2017 by Dalia Prizginiene
Presentation of Public ESA Multi-GNSS Products
Signal Availability in the Polar Regions
MGEX Working Group Progress on recommendations made at the 2016 IGS workshop in Sydney, Australia Presented to the IGS Governing Board and Associate Members.
CNES Real-time Analysis center Status
The Experiment on DFMC SBAS
The Status of Dual-Frequency Multi-Constellation SBAS Trial by Japan
IGS Infrastructure Status
Status of the Japanese QZSS Program
準天頂衛星L5S信号によるDFMC SBAS実験
Agenda Background and Motivation
Presentation transcript:

Japan Aerospace Exploration Agency K.Kawate, M. Miyoshi, S. Nakamura and S. Kogure H.Soga and A.Yasuda and University of Marine Science and Technology The development result of the ground infrastructure for Real time PPP experiment by using QZSS for Real time PPP experiment by using QZSS

PPP WORKSHOP 2013 Outline Real-time PPP Service via QZSS Development Status of the Ground Infrastructure for Real-Time PPP Service - MGM-net (monitoring network) - MADOCA (Multi-GNSS offline & real-time estimator) Evaluate Result - Estimate accuracy of orbit and clock by MADOCA - PPP accuracy with MADOCA products + Announcement

PPP WORKSHOP 2013 Introduction Background - Progression of “Multi-GNSS” by increase of positioning satellites Prediction of visible satellites in Expansion of GNSS utilization field Not only Positioning, Navigation and Timing, But also Applied researches Real-time PPP service with cm-level accuracy is required! Today’s Topic “Development of Real-time PPP service using Multi-GNSS via QZSS by JAXA” - Multi-GNSS monitoring network “MGM-net” - Precise Multi-GNSS orbit and clock estimator “MADOCA” - MADOCA-LEX signal # of sats

PPP WORKSHOP 2013 Real-time PPP Service via QZSS

QZSS (Quasi-Zenith Satellite System) PPP WORKSHOP 2013 What’s QZSS - Sep. 11, 2010 Launch by H-IIA 18 th - June. 22, 2011 Start of public service (L1C/A, L2C) First Quasi-Zenith Satellite “Michibiki” Role of “Michibiki” 1)”GPS Availability Enhancement” (L1C/A, L2C, L1C, L5 signal) 2) “GPS Performance Enhancement“(L1-SAIF, LEX signal) Form6.2m×3.1m×2.9m (Launch) Panel width: 25.3m WightApp. 4000kg (Launch) PowerApp. 5 kW Orbit Altitude (initial orbit) Apogee: App km Perigee: App km Design Lifeover 10 years Service via QZSS ( 1 / 2 ) - Regional Positioning system which can stay near zenith over Japan for many hours - Service area : all over Asia and Oceania region

PPP WORKSHOP 2013 Service via QZSS Weather Forecast LEO satellite Car/Human Navigation Effective field of real-time PPP service via QZSS Crustal deformation monitoring Tsunami detection Precise Agriculture Service via QZSS ( 2 / 2 ) - Broadcast of orbit and clock correction message using LEX signal LEX signal - Center frequency : MHz - Transfer rate : 2 kbps - Massage : Some messages broadcasted by time sharing (JAXA 、 SPAC 、 NICT 、 GSI)

PPP WORKSHOP 2013 Development status of the Ground Infrastructure for Real-Time PPP Service

MGM-net etc. MADOCA Target accuracy < 10cm (H/V RMS) PPP users Development of ground infrastructure for providing real-time PPP service - Target PPP Accuracy in this system is less than 10 cm(H/V RMS) 8 8 GLONASS Galileo QZSS ・・・ LEX message LEX message PPP users LEX signal Tracking&Control Station RTCM SSR orbit & clock estimator LEX message generator RTCM, Raw, BINEX… NTRIP Caster (provided by BKG) Data interface LEX message Master navigation signal PPP WORKSHOP 2013 GPS MADOCA Development status of the ground infrastructure ( 1 / 7 ) System of Real-time PPP Service

★ JAXA’s (9) ● MGM-net(Hosting) on running (11) ● MGM-net(Hosting) under construction (13) ■ MGM-net(Sharing) (7) ▲ MGM-net(Sharing based on agreement) (40) MGM-net (Multi-GNSS Monitoring network) Aim of MGM-Net - Improvement of Multi-GNSS orbit and clock estimate accuracy - Promotion of Multi-GNSS experiment including QZSS ■ Please visit “MGA” website for detailed → → Call for Application of JAXA’s Rx hosting sites from 2011 Call for Application continuously until arranged 60 sites!! PPP WORKSHOP 2013 Development status of the ground infrastructure ( 2 / 7 )

International Cooperation - Expansion of Multi-GNSS monitoring network - Cross-check of orbit and clock estimate result → Plan to participate into IGS M-GEX project ★ JAXA’s (9) ● MGM-net(Hosting) on running (11) ● MGM-net(Hosting) under construction(13) ■ MGM-net(Sharing) (7) ▲ MGM-net(Sharing based on agreement) (40) ▲ other partner’s (based on agreement) (4) MGM-net ~ International cooperation (Multi-GNSS Monitoring network) PPP WORKSHOP 2013 Development status of the ground infrastructure ( 3 / 7 ) International Cooperation - Expansion of Multi-GNSS monitoring network - Cross-check of orbit and clock estimate result

PPP WORKSHOP 2013 (Multi-GNSS Advanced Demonstration tool for Orbit and Clock Analysis) MADOCA Offline Estimate FunctionReal-time Estimate Function Positioning SystemGPSGLOQZSGalGPSGLOQZSGal Schedule Estimate Accuracy Orbit[cm]3749 Clock[ns] Aim of MADOCA - Estimation of orbit and clock with high accuracy - Multi-GNSS Support (GPS, GLONASS, QZSS and Galileo) Development - NEC, Tokyo University of Marine Science and Technology and JAXA Goal - Estimate accuracy comparable to IGS products for RT positioning with < 10cm accuracy Table. 1 Development Schedule & Target Accuracy Development status of the ground infrastructure ( 4 / 7 )

PPP WORKSHOP 2013 MADOCA (Multi-GNSS Advanced Demonstration tool for Orbit and Clock Analysis) OfflineReal-Time AlgorithmIterated Weighted LSQDual-Cycle-EKF Estimated Parameters Orbit, SRP/Emp-Acc, Clock, Position, ZTD/Grad, Ambiguity, Bias, EOP Numerical Solver NEQ by Cholesky Factorization Numerical Stable EKF Clock Estimation Parameter Elimination in NEQ State as White-Noise or Random-Walk Integer Ambiguity Resolution Network AR (Ge., 2005) Real-Time Network AR Parameter Adjustment - Precise orbit & clock estimation using latest models - Reduction of processing time - High Stablity of numeric calculation Table2 Parameter Adjustment Development status of the ground infrastructure ( 5 / 7 )

PPP WORKSHOP 2013 Format - Definition of MADOCA-LEX format as MT=12 based on RTCM SSR MADOCA-LEX Preamble (8) Reserved (6) Message Length(10) Data Message (Variable) CRC (24) Preamble (8) Reserved (6) Message Length(10) Data Message (Variable) CRC (24) header (49) TOWWNSSR Packet#1 (Variable) SSR Packet#2 (Variable) ReservedReed-Solomon (256) Data Section(1695) LEX message (2000) ・・・・・・ LEX message (cf)RTCM SSR ・・・・・・ RTCM Message #1RTCM Message #2 SSR PacketMessage NumberUpdate Interval GPSQZSSGalGLO Orbit Correction *1240*106330sec Satellite Code Bias *1242*10651day URA *1244*106730sec High rate Clock Correction *1245*10682sec RTCM SSR MT using MADOCA-LEX message (* : draft ) (Multi-GNSS Advanced Demonstration tool for Orbit and Clock Analysis) Development status of the ground infrastructure ( 7 / 7 ) ■ Please visit QZSS websites “QZ-vision” → Please check !

PPP WORKSHOP 2013 Evaluate Result

PPP WORKSHOP 2013 Evaluation of offline estimation 2011/01/01 -12/31 (365 days), wrt IGS Final GPS & GLONASS estimation - Comparable accuracy with IGS ACs GPS GLONASS QZSS orbit estimation - <6 cm accuracy on overlap evaluation QZSS 2011/06/ /11/03 (153 days), 24 H-overlap (cf.) Overlap evaluation Arcs 12H 48H 12H Overlap error R :2.37cm, A :4.47cm, C :3.21cm, 3D :5.99cm R A C +1m -1m Reported Evaluation result ( 1 / 6 )

Evaluation of offline PPP PPP WORKSHOP /01/13 -1/20 (8 days), RTKLIB2.4.1b12, wrt PPP-static using IGS Final Offline PPP around Asia and Oceania area using MADOCA offline products - Offline PPP accuracy of enough less than 10cm !! Average 3.8cm (HRMS) 5.6cm (VRMS) Evaluation result ( 2 / 6 ) Reported

PPP WORKSHOP 2013 Architecture Orbit Error (Radial/Along/Cross) Clock Error R: 1.52 cm/ A: 2.49 cm/ C: 1.81 cm 3D: 3.44 cm STD: ns / RMS:0.184ns Simulated *1 GPS real-time estimation (1/2) - Achievement of orbit accuracy of < 4 cm and clock accuracy of ~ 0.1 ns 2012/2/1 - 2/14 (14 days), 31 GPS satellites wrt IGS Final (* First 24H and unhealthy G14 excluded) Evaluation result ( 3 / 6 ) Evaluation of simulated RT estimation * 1 : Evaluation of real-time estimator using simulated real-time data based on RINEX

Simulated GPS real-time estimation (2/2) - Achievement of PPP accuracy of enough less than 10 cm 18 RMS * E: 1.93 cm N: 1.46 cm U: 3.91 cm RMS * E: 1.80 cm N: 1.42 cm U: 3.25 cm with Simulated MADOCA Clock/Orbit E N U +0.2m -0.2m PPP WORKSHOP /2/2 - 2/14 (13 days), RTKPOST2.4.2, wrt IGS Final POS (* First 1H with IGS FINAL E N U +0.2m -0.2m Evaluation result ( 4 / 6 ) Evaluation of simulated RT PPP

JAXA’s (8) Other partner’s (5) Ground Test of RT estimator (1/2) - Ground Test of real-time estimator via NTRIP caster using MGM-net and IGS/MGEX sites MGM-net (5) PPP WORKSHOP 2013 IGS/MGEX (21) Evaluation result ( 5 / 6 ) Evaluation of RT estimation Sharing (7)

Evaluation of RT PPP E-W N-S U-D Ground Test of RT estimator (2/2) - Achievement of PPP accuracy of < 10 cm using only GPS PPP WORKSHOP 2013 E-W N-S U-D +0.5m -0.5m 10cm RMS E: 2.51 cm N: 2.20 cm U: 7.57 cm RMS E: 6.02 cm N: 3.75 cm U: 9.61 cm 2013/5/20 9:00-21:00 (12h), RTKLIB2.4.2,1Hz, wrt IGS Final POS Evaluation result ( 6/ 6 ) with Real Time IGS with Ground Test MADOCA

PPP WORKSHOP 2013 Announcement

Experiment Schedule Please see “Experiment Schedule” on QZ-vision because LEX signal is on test. Announcement ( 1 / 3 ) PPP WORKSHOP 2013 START of Test Broadcast Test Bradcast - Start of MADOCA-LEX signal broadcast via “QZSS” on a trail !! 1 st April 11 - April 13 2 nd April 26 - May 3 3 rd May 28 - June 1 On Test June 9 - June 15 ■ Please visit QZSS websites “QZ-vision” → Please check here!

START of Test Broadcast Announcement ( 2 / 3 ) E-W N-S U-D +0.5m -0.5m PPP using MADOCA-LEX - Achievement of PPP accuracy of ~ 10 cm using GPS+QZS PPP WORKSHOP cm RMS E: 3.54cm N: 1.99 cm U: cm 2012/5/30 12:00:00-23:59:59(12 hours),RTKLIB2.4.2, 31 GPS+QZS satellites, wrt PPP-static, IGS Final MGM-net IGS/MGEX LEX MADOCA LEX message generator JAXA’s LEX receiver SSR RTCM BINEX RAW LEX sig. SSR orbit&clock estimator with MADOCA-LEX Architecture

8:30 Ottawa 8:30 Tsukuba QZSS START of Test Broadcast Announcement ( 3 / 3 ) Demonstration of PPP using MADOCA-LEX PPP WORKSHOP 2013 MGM-net IGS/MGEX LEX MADOCA LEX message generator JAXA’s LEX receiver SSR RTCM BINEX RAW LEX sig. SSR orbit&clock estimator Architecture Please see PPP using MADOCA-LEX !

PPP WORKSHOP 2013 Summary Development status of ground infrastracture real-time PPP service ‐ MGM-net : Expansion of Multi-GNSS Monitoring Network (84 sites) - MADOCA : Development of Multi-GNSS orbit and clock estimator with high accuracy Achievement of “real-time” PPP service with < 10 cm (H/VRMS) accuracy on ground test Future Plan - Evaluation of long-term stability of real-time estimator - Function addition for higher accuracy (PPP-AR, BeiDou etc.) → We aim to join IGS analysis centers in the future! - Start of regular broadcast of MADOCA-LEX signal We look forward to providing real-time PPP service via QZSS!!

PPP WORKSHOP 2013 Thank you for your attention!!