EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE Information on national inventory systems and QA/QC procedures reported in national inventory reports Workshop.

Slides:



Advertisements
Similar presentations
Qualitäts-System Emissionen 1 UBA II Germany EU Workshop on QC/QA of GHG inventories, Sept EU Workshop on QC/QA of greenhouse gas inventories.
Advertisements

EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE EC GHG inventory system – EC GHG inventory and inventory report rd Joint UNECE Task Force.
The Monitoring Mechanism of greenhouse gas emissions from the European Community Hartmut Behrend European Commission DG ENV.C.2, Brussels.
1 Workshop on inventories of greenhouse gas emissions from aviation and navigation May 2004, Copenhagen EU greenhouse gas emission trends and projections.
1 Introduction, reporting requirements, workshop objectives Workshop on energy balances and energy related greenhouse gas emission inventories (under WG.
EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE Overview of main reporting problem areas in energy balances/ energy related parts of GHG inventories Workshop.
Climate Change Committee WG1 QA/QC terminology and requirements from the IPCC Good Practice Guidance and the Guidelines for National Inventory Systems.
UNFCCC Workshop on National Systems Bonn, April 2005 Jean-Pierre Fontelle Current situation in France concerning the National Emission Inventory System.
Inventory Management Systems Developing a National System for GHG Inventories Lisa Hanle U.S. Environmental Protection Agency October 29, 2004 Panama City,
Good Practices in National Communications of non-Annex I Parties CGE Workshop Cairo, Egypt September 2007.
1 Workshop on Quality Control and Quality Assurance of Greenhouse Gas Inventories and the Establishment of National Inventory Systems 2-3 September 2004.
WORKSHOP ON QUALITY CONTROL AND QUALITY ASSURANCE OF GREENHOUSE GAS INVENTORIES AND THE ESTABLISHMENT OF NATIONAL INVENTORY SYSTEMS Poland QA/QC Procedures.
Workshop on QA/QC of GHG inventories & Establishment of National Inventory Systems – EEA, Copenhagen, September 2004 Jean-Pierre Fontelle French reporting.
National Inventory System in Finland Workshop on QC and QA of GHG Inventories and the Establishment of National Inventory Systems 2-3 September 2004, Copenhagen.
1 Introduction, reporting requirements, workshop objectives Workshop on greenhouse gas and ammonia emission inventories and projections from agriculture.
WMO UNEP INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE NATIONAL GREENHOUSE GAS INVENTORIES PROGRAMME WMO UNEP IPCC Good Practice Guidance Simon Eggleston Technical.
Climate Change Committee WG1 QA/QC procedures and – programme for the EC inventory process André Jol, EEA 2 September 2004.
| Slide | Slide 2 QA/QC and NIS in Austria WG1 WS on QA/QC and National Systems, 2/3 September 2004 Copenhagen Manuela Wieser.
National circumstances and inventories of GHG emissions Mirja Kosonen UNFCCC WS, Dublin.
QC/QA and the establishment of the Portuguese National System Workshop on QC/QA of GHG Inventories and the establishment of National Inventory Systems.
Romania’s Reporting Activities under the UNFCCC and Kyoto Protocol Mr. Vlad Trusca Head of Climate Change Unit, UNFCCC National Focal Point Ministry of.
DEVELOPMENT OF THE NATIONAL INVENTORY SYSTEM IN THE REPUBLIC OF BELARUS Belarus has signed UNFCCC in June, 1992 Ratified in May, 2000.
EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE Workshop on energy balances and energy related GHG emission inventories – recommendations and follow-up.
Finland’s national system for estimating, reporting and archiving greenhouse gas inventory information UNFCCC Workshop on National Systems under Article.
Plans for establishment of national system (NIS) in the Czech Republic Pavel Fott, CHMI UNFCCC workshop, Bonn, 12 April 2005.
National Inventory System in the Slovak republic Janka SZEMESOVA Slovak Hydrometeorological Institute Bratislava April 2005, Wissenschaftszentrum,
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
KRAJOWE CENTRUM INWENTARYZACJI EMISJI NATIONAL EMISSION CENTRE UNFCCC WORKSHOP ON NATIONAL SYSTEMS Bonn, April 2005 National emission inventory system.
Inventory Planning in Norway UNFCCC Workshop on National Systems Audun Rosland 11 – 12 April 2005.
Managing Quality in the Finnish Greenhouse Gas Inventory Leena Raittinen, Statistics Finland Q2008 Conference, Rome 10 July 2008.
Current situation concerning national inventory system in Ukraine 1. Previous national inventories Up to date 3 national inventories were prepared and.
WP3: Peer Learning Activity, 9th/ 10th of April 2008, Vienna With the support of the Lifelong Learning Programme of the European Union 1 Work package 3.
Quality Management in the Finland’s Greenhouse Gas Inventory Leena Raittinen, Statistics Finland UNFCCC Workshop on National Systems April 2005 Bonn,
The Swedish air emission inventory system Karin Kindbom IVL Swedish Environmental Research Institute Russian-Swedish bilateral cooperation project: “Development.
1 Developed by U.S. Environmental Protection Agency (U.S. EPA) January 2014 Setting up a Sustainable National GHG Inventory Management System.
ESTAT/A/1 05/12/ :46 Slide: 1 European Commission - Eurostat Leonidas Akritidis Unit C1: National Accounts Calculating sector allocation of FISIM.
The Swedish air emission inventory system Karin Kindbom IVL Swedish Environmental Research Institute Russian-Swedish bilateral cooperation project: “Development.
National System in Romania - facts and challenges - Mr. Vlad Trusca Ministry of Environment and Water Management - UNFCCC Workshop on National Systems.
Training on occupational classifications. Name of the presentation Introduction ISCO 08 has started to be implemented in the EU countries in several social.
Water.europa.eu Assessment River Basin Management Plans CIS Strategic Coordination Group meeting Brussels, May 2011 Marieke van Nood WFD Team DG.
1 NATIONAL SYSTEMS UNFCCC Workshop on National Systems under Article 5, paragraph 1, of the Kyoto Protocol 11–12 April 2005 Wissenschaftszentrum, Bonn,
Type the subject in footer (View|Header and Footer) 1 28/01/2016 EU CLRTAP Emissions Inventory Compilation 2015 TFEIP Meeting, 11/12 May 2015, Milano ETC/ACM.
ESS Slide 1 Quality assessment of MEHM in SILC Eurostat Unit F5 “Health and Food Safety Statistics” 4 th meeting of the Task Force on Health Expectancies.
CIS-Workshop on „WFD and Hydropower“ June 2007 Berlin, Germany - First Workshop under Phase II ( ) of the EU activity „Water Framework Directive.
EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE Background to reporting and inventory experiences and problems of MS Workshop on emissions of GHG from.
Твининг пројекат Европске Уније Успостављање механизма за спровођење ММR *** Twinning project Establishment of a mechanism for implementation of MMR Пројекат.
Comparative analysis of the National Rural Networks (NRNs) in the EU Member States Martin Law Contact Point of the European Network for Rural Development.
EQAVET Secretariat Survey Draft analysis NRPs meeting Oct 2014 NRPs meeting, Brussels October 2014.
Module V Creating awareness on validation of the acquired competences
Eurojust cases involving crimes against children
National System and QA/QC: The Netherlands
Bulgaria and art.5(1) of the Kyoto Protocol
Setting up an ERIC 11 May 2012 Richard Derksen
National System and QA/QC: The Netherlands
State of legal transposition (1)
Report on WISE Art.8 and GIS issues
Habides update (May 2011).
&file 22/02/2019 National Programmes under the National Emission Ceilings Directive (NECD) André Zuber, European Commission, DG Environment Working group.
Workshop on inventories and projections of GHG from waste
Programme adoptions Cohesion Policy:
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
Item 7.1 – Overview of 2013 UOE data collection
Item 4.1 – Overview of 2014 UOE data collection
Agenda item 1 – Transposition and implementation of WFD
Morbidity statistics Item 10 of the agenda
Update on legal issues Strategic Co-ordination Group 7-8 May 2009
Assessment of Reporting on Competent Authorities
Follow up questionnaire
Quality aspects of EPER
Overview of the implementation of the SEA directive
Presentation transcript:

EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE Information on national inventory systems and QA/QC procedures reported in national inventory reports Workshop on QA/QC of GHG inventories and the establishment of national inventory systems 2-3 September 2004 Bernd Gugele Workshop on QA/QC of GHG inventories and the establishment of national inventory systems 2-3 September 2004 Bernd Gugele

EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE Information availability wNational inventory reports available: –EU-15: 14 MS, not LU –New MS: 8 MS, not CY, MT –2 MS 2003 NIR: PL, PT wScope of information varies: –EU-15: NIS (Ch ): 1 to 10 pagesNIS (Ch ): 1 to 10 pages QA/QC (Ch 1.6): - to 6 pagesQA/QC (Ch 1.6): - to 6 pages –New MS: NIS (Ch ): 0.5 to 4 pagesNIS (Ch ): 0.5 to 4 pages QA/QC (Ch 1.6): - to 0.5 pagesQA/QC (Ch 1.6): - to 0.5 pages –[+ annexes and sector specific information] wNational inventory reports available: –EU-15: 14 MS, not LU –New MS: 8 MS, not CY, MT –2 MS 2003 NIR: PL, PT wScope of information varies: –EU-15: NIS (Ch ): 1 to 10 pagesNIS (Ch ): 1 to 10 pages QA/QC (Ch 1.6): - to 6 pagesQA/QC (Ch 1.6): - to 6 pages –New MS: NIS (Ch ): 0.5 to 4 pagesNIS (Ch ): 0.5 to 4 pages QA/QC (Ch 1.6): - to 0.5 pagesQA/QC (Ch 1.6): - to 0.5 pages –[+ annexes and sector specific information]

EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE Conclusions (1) wDefinitions and wording: –QA/QC procedures, QA/QC process, QA/QC activities –QA/QC system, quality system, quality management system, QA/QC strategy –QA/QC plan, QA/QC programme –Improvement plan, improvement programme –Inventory plan –Verification is sometimes used for QC GPG: comparison with reference calculations is dealt with under QC T2 and verificationGPG: comparison with reference calculations is dealt with under QC T2 and verification wDefinitions and wording: –QA/QC procedures, QA/QC process, QA/QC activities –QA/QC system, quality system, quality management system, QA/QC strategy –QA/QC plan, QA/QC programme –Improvement plan, improvement programme –Inventory plan –Verification is sometimes used for QC GPG: comparison with reference calculations is dealt with under QC T2 and verificationGPG: comparison with reference calculations is dealt with under QC T2 and verification

EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE Conclusions (2) wNational inventory system –No MS has established NIS according to Guidelines –first MS by end of 2004 (FI); some mention end of 2005 in NIR –existing structures need to be adapted; no totally new system established –several MS have assigned the Single National Entity –No legal basis has been established so far (some MS consider); other MS work with contracts, MOUs (UK) –Most MS have established working groups/ committees/ task forces/ expert panels for coordination and/or inventory preparation wNational inventory system –No MS has established NIS according to Guidelines –first MS by end of 2004 (FI); some mention end of 2005 in NIR –existing structures need to be adapted; no totally new system established –several MS have assigned the Single National Entity –No legal basis has been established so far (some MS consider); other MS work with contracts, MOUs (UK) –Most MS have established working groups/ committees/ task forces/ expert panels for coordination and/or inventory preparation

EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE Conclusions (3) wQA/QC –No MS has QA/QC procedures in accordance with GPG in place –All MS carry out QC T1 activities to a certain extent (new MS mention lack of resources) –Seven MS seem to be at an advanced level of developing QA/QC procedures: AT, (DE), (DK), FI, FR, NL, UK –Four MS have quality management systems in place (at least for parts of the process): AT, FR, NL, UK –Some MS organise (sector specific) workshops –Difficulties with QA/QC of outside agencies wQA/QC –No MS has QA/QC procedures in accordance with GPG in place –All MS carry out QC T1 activities to a certain extent (new MS mention lack of resources) –Seven MS seem to be at an advanced level of developing QA/QC procedures: AT, (DE), (DK), FI, FR, NL, UK –Four MS have quality management systems in place (at least for parts of the process): AT, FR, NL, UK –Some MS organise (sector specific) workshops –Difficulties with QA/QC of outside agencies

EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE Conclusions (4) wQA/QC –Experience with expert peer reviews: UK –Public review of GHG inventory: NL –EPER data for verification: IT wQA/QC –Experience with expert peer reviews: UK –Public review of GHG inventory: NL –EPER data for verification: IT

EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE Information for non participants wNational inventory reports 2004: –GR, IT, EE, HU, LV, LT –No NIR available from LU, MT and CY wChapters: – : Institutional arrangements for inventory preparation, GHG inventory emissions inventory preparation process –1.6. QA/QC plan wNational inventory reports 2004: –GR, IT, EE, HU, LV, LT –No NIR available from LU, MT and CY wChapters: – : Institutional arrangements for inventory preparation, GHG inventory emissions inventory preparation process –1.6. QA/QC plan

EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE GreeceGreece wNational inventory system: –Roles have been defined between the ministry, governmental agencies and other entities. –Single national entity designated: National Observatory Athens –Official specification of roles and co-operation still missing. wQA/QC: –No QA/QC plan in place. –A plan is under development and will be implemented for 2005 submission. –Current procedures: reliability checks, archiving of EFs, comparison of CO 2 emission estimates reference and sectoral approach, assessment of observed trends wNational inventory system: –Roles have been defined between the ministry, governmental agencies and other entities. –Single national entity designated: National Observatory Athens –Official specification of roles and co-operation still missing. wQA/QC: –No QA/QC plan in place. –A plan is under development and will be implemented for 2005 submission. –Current procedures: reliability checks, archiving of EFs, comparison of CO 2 emission estimates reference and sectoral approach, assessment of observed trends

EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGEItalyItaly wNational inventory system: –No national system in place. –In near future, a plan for a national system will be drafted. –Difficulties in timeliness, quality, transparency of some basic statistical data and completeness. wQA/QC: –No specific QA/QC system in place. –QC activities: usual QC activities, documentation of methods and data changes resulting in recalculations –QA activities: Sector specific projects/workshops/expert panelsSector specific projects/workshops/expert panels Comparison of international with national activity dataComparison of international with national activity data EPER data used for verificationEPER data used for verification MeditAiraneo ProjectMeditAiraneo Project Local inventoriesLocal inventories wNational inventory system: –No national system in place. –In near future, a plan for a national system will be drafted. –Difficulties in timeliness, quality, transparency of some basic statistical data and completeness. wQA/QC: –No specific QA/QC system in place. –QC activities: usual QC activities, documentation of methods and data changes resulting in recalculations –QA activities: Sector specific projects/workshops/expert panelsSector specific projects/workshops/expert panels Comparison of international with national activity dataComparison of international with national activity data EPER data used for verificationEPER data used for verification MeditAiraneo ProjectMeditAiraneo Project Local inventoriesLocal inventories

EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE EstoniaEstonia wNational inventory system: –Since 1994 interministerial Committee of Climate Change (includes NGOs) responsible for implementing UNFCCC –Ministry of Env. organises the practical work for inventories and offers contracts for inventory preparation –Institute of Ecology at Tallinn Pedagogical University is responsible for the inventories and National Communications wQA/QC: –The quality of emission data for different years and sectors varies. –No QA/QC system in place. wNational inventory system: –Since 1994 interministerial Committee of Climate Change (includes NGOs) responsible for implementing UNFCCC –Ministry of Env. organises the practical work for inventories and offers contracts for inventory preparation –Institute of Ecology at Tallinn Pedagogical University is responsible for the inventories and National Communications wQA/QC: –The quality of emission data for different years and sectors varies. –No QA/QC system in place.

EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE HungaryHungary wNational inventory system: –National Directorate for Environment, Nature and Water responsible for compiling GHG inventories –The inventory is prepared by two full-time persons assisted by 4 or 5 part-time officers (for 1-2 months). wQA/QC: –Certain data are multiple-checked, time series are checked. –Several agencies providing data declared that they have QA systems in place. However actual information on the reliability of data was obtained from a few agencies only. wNational inventory system: –National Directorate for Environment, Nature and Water responsible for compiling GHG inventories –The inventory is prepared by two full-time persons assisted by 4 or 5 part-time officers (for 1-2 months). wQA/QC: –Certain data are multiple-checked, time series are checked. –Several agencies providing data declared that they have QA systems in place. However actual information on the reliability of data was obtained from a few agencies only.

EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE LatviaLatvia wNational inventory system: –No national system in place. –Inventory prepared by Latvian Environment Agency in cooperation with several sectoral institutions. wQA/QC: –QA/QC activities according to GPG are not performed due to lack of resources. –Limited QA/QC activities are performed. wNational inventory system: –No national system in place. –Inventory prepared by Latvian Environment Agency in cooperation with several sectoral institutions. wQA/QC: –QA/QC activities according to GPG are not performed due to lack of resources. –Limited QA/QC activities are performed.

EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE LithuaniaLithuania wNational inventory system: –Inventory is prepared by one person at the Ministry of Environment based on data from other institutions. –Discussions are ongoing if EPA is taking over the compilation of GHG inventories wQA/QC: –A QA/QC system still has to be put into place. wNational inventory system: –Inventory is prepared by one person at the Ministry of Environment based on data from other institutions. –Discussions are ongoing if EPA is taking over the compilation of GHG inventories wQA/QC: –A QA/QC system still has to be put into place.