BOB BROZ UNIVERSITY OF MISSOURI EXTENSION (573) 882-0085 ISE #78 WATER MANAGEMENT STRATEGIES FOR DROUGHT MITIGATION AND SUSTAINABLE AGRICULTURAL PRODUCTION.

Slides:



Advertisements
Similar presentations
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Advertisements

Geothermal Alliance of Illinois Getting it Right the First Time.
Land Use Program Septic System Overview Scott Weldon
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 4: Design and Plan Review— Conventional Systems Part.
As presented by: Rodger Schuldt TCEQ Installer II License # OS19898 TCEQ Maintenance Provider License # MP00545 TCEQ Site Evaluator License # OS20270.
Potential Pathways for Coliform Contamination. Fixing Positive Coliform Results.
Trinity Glen Rose Groundwater Conservation District Monty McGuffin, Santos Tovar and Jim O’Connor Resource Compliance and Protection Department March 10,
The Proper Location and Construction of a Residential Water Well.
What Do You Know About Michigan’s Hidden Resource? All photos by Joan Schumaker Chadde, Western Upper Peninsula Center for Science, Mathematics and Environmental.
Chemigation. Chemigation Chemigation is the process of applying pesticides and fertilizer through irrigation waterChemigation is the process of applying.
Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.
Managing Water Shortage for Livestock Operations Shawn Shouse ISU Extension Ag Engineer.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
Condensation Piping and Installation Drain Pans
Sustained Compliance for Public Water Systems, Chapter 2, Workshop Department of Environmental Conservation Drinking Water Program Anchorage, September.
How to Build a Groundwater Model Activity Source Created by the USA Groundwater Foundation; modified from the Science Olympiad event, Awesome Aquifers.
Welcome Domestic Well Owners Workshop Sponsored by The Nevada Water Resources Association Spring 2011.
Groundwater Math Math for Water Technology MTH 082 Lecture 2 Well Drawdown, Well yield, Specific Capacity, Well Disinfection Course Reader Week 2 Chapter.
Groundwater. Goal To understand why groundwater is important, where it comes from, and some complications with its use.
Protecting Water Quality: Wells and Septic Systems Developed by: Susan Donaldson University of Nevada Cooperative Extension UNCE, Reno, NV.
Installing & Maintaining Irrigation Systems Ms. Gripshover Landscaping Unit 15.
Basic Hydraulics Irrigation.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Updated: 2/12/2012.
What Do You Know About Michigan’s Hidden Resource?
Waupun Utilities Water Treatment Facility. Treatment Processes Source Water Pretreatment System Reverse Osmosis System Post Treatment System Distribution.
ETF – O IL AND G AS T RACT, M AY 5, 2015 GROUNDWATER AUTHORITY AND REQUIREMENTS.
Griner Drilling Service
Dewatering Equipment.
WESTERN CARY WATER STORAGE TANK Town of Cary Preliminary Engineering Report Progress Meeting June 8, 2015.
Overlap of multiple irrigations. 3-D Uniformity Simulation.
Water Quality Issues with Wells
Well Systems. Well System Capacity Well system capacity needs to be large enough to supply daily water need in 10 to 12 hours. Some designers assume 5.
Technology in Architecture Lecture 8 Overview Water Resources Water Supply Systems Planning Issues Lecture 8 Overview Water Resources Water Supply Systems.
Residential Construction Unit 5 Energy Efficiencies and Mechanicals Mr. Todzia.
Using the Ground Water Flow Model as an Educational Tool Bob Broz Water Quality Specialist University Outreach and Extension.
10 Frequently Asked Questions about Center Pivots Gulf Coast Irrigation Conference Sinton, November 18, 2008 Guy Fipps Professor and Extension Agricultural.
ELK MEADOWS HOA Water Master Plan (Supply, Treatment, Distribution, and Storage) May 2005.
Groundwater and Surface Water in a Watershed
Alive Project Sanitation System Non traditional sanitation system (low cost) which is implemented by Alive project in the villages is one of the useful.
Preparing Foundations for Cylinders & ASME Tanks
Water Well Design August 6, 2015 AL/MS AWWA Ralph Hayes, P.E., BCEE Engineering Director MSDH, Bureau of Public Water Supply.
June 11, 2011 Littlerock Fire Station 7 pm. Power failures in past years Recent power failure of 2012 resulted in the required chlorination of our water.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.
Backflow Prevention for Fire Sprinkler Systems State of Illinois Plumbing Code.
Tracking Groundwater Contamination
Drip Irrigation Systems By: Philip Hanrahan and Matt Garrity.
ICORR Technologies, Inc.
Geothermal. Defining “Geothermal” Energy Dictionary definition – Relating to the internal heat of the earth The Earth acts as a giant solar collector,
Pressure and Flow Analysis Through EPANET Open source software package for hydraulic simulation of water distribution networks Used to determine impact.
Location and construction of water wells
IRRIGATION SYSTEMS. OBJECTIVES 1. Describe irrigation & its purpose 2. Explain preparation for irrigation systems 3. Calculate GPM 4. Identify & explain.
Home Water Supply Basic Facts a Homeowner Needs to Know
WELLHEAD PROTECTION AND LAND USE “It’s Cheaper to Prevent Contamination”
An introduction to Private Water Systems
 171 Public wells sampled in 2014  Bacteria and Nitrate samples taken  38 wells inspected (Surveyed)  1 nitrite sample taken.
Irrigation Management Practices Cropping A*Syst Katie L. Droscha 01/14/ /15/2013.
What Do You Know About Michigan’s Hidden Resource?
Septic System Overview
Technology in Architecture
CASING.
Water Use & Irrigation Management
Private Septic Systems
Vertical Pressure Filters
Factsheet: Proper Permanent Well Abandonment for Virginia Coastal Plain Wells VDH DEQ What is.
Private Septic Systems
Well Repair Installation of Well Liners
Human Activity and Ground Water
Presentation transcript:

BOB BROZ UNIVERSITY OF MISSOURI EXTENSION (573) ISE #78 WATER MANAGEMENT STRATEGIES FOR DROUGHT MITIGATION AND SUSTAINABLE AGRICULTURAL PRODUCTION Private Water Wells Cost in Missouri

Wellhead Protection Missouri had new well installation regulations go into affect March 1995 This gave standards for well location and well construction. Many older wells were grandfathered in All new wells must meet the new standards Approximately 6,000 new wells drilled every year.  Serves approximately 890,000 citizens  86% of private wells are drilled.

It is important to understand the geology of the state to have an idea of how much groundwater is available. The availability of good quality water does dictate number of businesses, individuals, etc. that can locate in an area.

Emergency Water Source Development Program Over 1800 wells installed for either livestock or irrigation. Average cost on livestock water supply $4,800  Average depth was 410 feet Average cost on irrigation water supply $12,700  Average depth was 105 feet

Average Cost for Livestock Well Pressure tank $ Submersible pump $1, Jetpump $ Water well casing $9.23/ft Water well drilling $6.44/ft Water well lining $5.84/ft Water well misc. $ Well house $652.10

Options for Livestock Wells Solar panel and pump 100 $2, Solar panel and pump 300$3, Solar panel and pump >300$3, NW Large diameter wells $95.00/ft Solar water storage tank gal $ Solar water storage tank gal $ Solar water storage tank gal $930.00

Average cost for Irrigation Well Pressure tank $ Submersible pump $1, Water well casing $9.23/ft Water well drilling $6.44/ft Water well lining $5.84/ft Water well misc. $ Well house $ Irrigation well drilling $65.00/ft Turbine pump $5, Power unit $12, Irrigation submersible pump $4,000.00

Approximate cost Hourly rate for Boom Truck $150/hr. Drilling of hole $6.50/ft 6” casing installed $11.00/ft Grout Seal required (15 bags)$50.00 /bag Pump, electrical, pressure tank, controls $3,710  Varies with depth of well Upgrade to 20 gpm 3.0 hp pump$2,280

Components of pump package Pump package  1.5 hp pump (10 gpm)  80 PVC drop pipe with couplings  10/3 submersible electrical cable  Pressure tank  50 ft pipe to hydrant  Electrical control package  Environmental well seal and pitless adapter subtotal $3711

600 ft Drilled Well with no complication Drilling $3,900 PVC casing $1,100 Drive shoe and grout seal$750 Certification and Chlorination$ hp Submersible pump package $3,700 Labor $1,250 Tax $400 Total$11,200

Complications can add to the cost 4” PVC $6/ft (shale/caving in) 10” surface $25/ft (sand and gravel/caving in) 6” steel $16/ft (unstable geological conditions) $150 each 2” waterline $4/ft Extra time on Boom Truck or digging equipment $150/hr.

Well construction basics: Well casing – 6 inches diameter Casing joints – water tight joints Vertical extension – well casing shall extend at least one foot about the finished surface grade (2 feet above maximum known floodwater elevation if in a flood plain) Depth of casing – to such depth as may be necessary to exclude contaminants Grouting – ensure that the annular space is sealed and that the casing does not leak.

Review state regulations on proper wellhead design and installation Should be 1 foot above the surface casing depth will depend on soils and location

Well Construction basics: Connections (above grade) – shall be 1 foot above finished grade and constructed to exclude dirt and other foreign matter from entering the well. Every well shall be maintained by the owner in a condition where it will conserve and protect the groundwater resources and where it will not be a source or channel of contamination or pollution to the water supply of the well or any aquifer.

Well Construction Basics: Construction requirements are based on well yield, use of well, and the region in which your well is located. And vary throughout the state according to the geology of the region. Always use a permitted driller when drilling or repairing a well.

Wellhead Protection Irrigation wells  200 feet from sewer lines, septic tanks, lateral fields, feed lots, barnyards, fuel storage, fertilizer and pesticide storage.  200 feet from well producing potable water  15 feet or more from overhead electrical distribution line  Fuel, fertilizer and pesticide tanks up to 1,000 gallons are allowed at well while irrigating and chemigating but must be removed from well site when not in use

Wellhead protection

New or Reconditioned? Depending on condition of an older well it may be cost effective to recondition it instead of drilling a new well. Check for depth, casing condition, wellhead protection, gpm flow, location. If old well can’t be properly reconditioned it should be properly plugged.

We still use the old well as a back up.

Plugging Abandoned Wells Any well in a state of disrepair, obtaining groundwater is impractical and which has not been in use for 2 years or more Permanent Abandonment of Wells  Rules found at 10 CSR –  “Eliminating an Unnecessary Risk: Abandoned Wells and Cisterns” can down load from web -

Questions and contacts Bob Broz Monitoring well website: ymonitor.htm ymonitor.htm Interactive map to groundwater observation well information and real time data. Well Information Management Systems