Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

Slides:



Advertisements
Similar presentations
Tales from the Lab: Experiences and Methodology Demand Technology User Group December 5, 2005 Ellen Friedman SRM Associates, Ltd.
Advertisements

1 IT Infrastructure program contract modifications Debbie Secor Customer Service and Project Management Office Director Communications.
HDI San Diego Chapter May 2012 Desktop Support Metrics: A Case Study Mike Russell V.P. Communications, SDHDI.
ServiceDesk Plus MSP Product Overview. Why ServiceDesk Plus - MSP? Capability of Managing Multiple Client’s in one Help Desk Stop Juggling with multiple.
Page 2 Agenda Page 3 History –Blue Print, 2000 –GIS Process 1.2, 2001 (training only) –GIS Process 2.0, (ITIL based - not implemented) –Supply/Demand.
SERVICE LEVEL AGREEMENTS The Technical Contract Within the Master Agreement.
IT Industry Briefing Pricing Customs IT Market Testing Jo Hein, National Manager IT Market Testing, Australian Customs Service.
The future of Desktops Transform Your Desktop with Virtualization.
2 Breakout Session # 1411 Robert F. Watts, Senior Consultant, ESI International Date: April 16 Time: 2:40 – 3:40 PM Buying Results Through Service Level.
Management of IT Environment (5) LS 2012/ Martin Sarnovský Department of Cybernetics and AI, FEI TU Košice ITIL:Service Design IT Services Management.
QAD On Demand Operational Delivery Kory D. Johnson QAD Explore 2012.
NOT FOR PUBLIC DISTRIBUTION State of Minnesota Technology Summary February 24, 2011.
Enterprise Architecture The Arkansas Approach. Key Areas What is enterprise architecture? Why is it important? How you can participate Current status.
Date: 03/05/2007 Vendor Management and Metrics. 2 A.T. Kearney X/mm.yyyy/00000 AT Kearney’s IT/Telecom Vendor Facts IT/Telecom service, software and equipment.
High-Level Assessment Month Year
Enterprise Service Desk (ESD)
Defining Services for Your IT Service Catalog
Barracuda Networks Confidential1 Barracuda Backup Service Integrated Local & Offsite Data Backup.
Terry Jackson Paul Rydeen August 16, 2010
TechNet Build’06 “The Secure Well Managed Infrastructure Tour”
Federal Data Center Consolidation Initiative Karen Petraska August 17, 2011.
May 20, 2011 | Friday | 10-11AM | 1414 Mass Ave, 5 th Fl. IT Services Transition Client Services Working Group Meeting.
User Services. Services Desktop Support Technical Support Help Desk User Services Customer Relationship Management.
Enterprise Asset Management
1 expect the best Finance Officers Briefing July 14, 2006 VITA – Northrop Grumman Transition/Transformation.
1. Agenda Service Utilization Service Level Metrics Service Performance Review Incident Review Current / Future Service Plan Service Improvement Plan.
IT Update Faculty Senate September 1, 2004 University of Houston Information Technology.
Collin County’s Doing More with Less How Collin County’s ITIL Framework has worked to do more with less.
GETS Transformation Kick Off April 21, GTA-3233 Consolidated Service Desk opinGTA Your Opinion Counts.
1 Faculty Council IT Committee C-13 February 4, /4/2010.
Source One Network Solutions with Corporate Headquarters based in Fitchburg, Wisconsin specializes in providing multi- location clients, with nationwide.
New Facilities & Disaster Recovery Solutions 0 February 20, 2007 Agency IT Resources Communications Exchange Meeting Facilities and Disaster Recovery Solutions.
Leveraging Oracle Data for Web- Based Reporting Northern California Oracle Users Group May 2001.
Reporting to Management Using Microsoft Project and EPM Derek Loar, Pcubed.
IT Update Sally Waselik June 2005 IOC meeting. IT Vision - “We Deliver Quality Solutions For Our Customers” 2 Today l Level of Service Concepts l IT Enterprise.
SOLUTIONS FOR THE EFFICIENT ENTERPRISE Sameer Garde Country GM,India.
System Center 2012 Certification and Training May 2012.
1 ©2009 Desktone, Inc. All rights reserved. Desktops in the Cloud: It’s not Virtual Desktop Infrastructure (VDI) Danny Allan, Chief Solution Architect.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Site Networking Anna Jordan April 28, 2009.
2010: Agency and GTA Transition Alignment “Establishing the new interoperability model” August 25, 2008.
Service Transition & Planning Service Validation & Testing
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
Measuring Managed Services 0 IT Infrastructure Partnership Team December 9, 2008.
Title: Service Management at ChoicePoint Session #: 33 Speakers: Krissi Rouquie & Frederieke Winkler Prins Companies: ChoicePoint & Service Management.
Georgia Technology Authority GTA-3233 Consolidated Service Desk opinGTA Your Opinion Counts GETS Transformation Kick Off OrderNow: What’s New?
Georgia Technology Authority GTA-3233 Consolidated Service Desk opinGTA Your Opinion Counts RFS – Request for Service Overview 04/21/2010.
IT Support Centralization Lowers Costs and Improves Service IM-LLNL-PRES AJWoolverton.
IT Services Transition Weekly Client Services Working Session March 11th, 2011 | Friday | 10:00am – 11:00am.
Georgia Technology Authority GTA-3233 Consolidated Service Desk opinGTA Your Opinion Counts GETS Transformation Kick Off Consolidated Service.
Seattle Community Colleges District IT Advisory Committee Information Technology Services Customer Service Survey Results Fall, 2009 Information Technology.
Cloud Computing Use Case Draft v2.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
State of Georgia Release Management Training
IT Services Model Business Requirements IT Strategies Goals
Governor’s Office for Technology Service Level Management Overview Office of Policy & Customer Relations September 21, 2001 Governor’s Office for Technology.
MANAGED LAN SERVICES How will you benefit? Managed LAN service  Full LAN service (hardware, operation, other services)  Per-port pricing  International.
Introduction to ITIL and ITIS. CONFIDENTIAL Agenda ITIL Introduction  What is ITIL?  ITIL History  ITIL Phases  ITIL Certification Introduction to.
State of Georgia End User Computing Laura Brodtmann Dell EUC Transition & Transformation Manager December 10, 2008.
© 2009 IBM Corporation IBM Cloud Computing Tivoli Service Automation Manager V7.2 The Core of the Service Management System for Cloud Computing.
Information Technology Division Customer Service Support Center.
1 Evolution and Revolution: Windows 7 and Desktop Virtualization Changing the Desktop Support Landscape Denise Harrison, CIO and Vice President.
Georgia Technology Authority 1 Discovery for End User Computing Department of Human Resources January 12, 2009.
1 State of Georgia (GTA) Desktop Inventory Workshop March 16, 2009 © 2009 IBM Corporation IBM.
ITIL and Remedy ITSM Implementation Overview
Welcome.  Henrietta TurnerManager, License Administration Colorado Parks & Wildlife (CPW) IPAWS Project Sponsor  Ken ThomSenior IT Project Manager Governor’s.
The Help Desk is Dead; Long Live the Service Desk A presentation and discussion of the ongoing Service Management approach to assisting students, faculty.
Georgia’s Technology Transformation Digital Summit November 21, 2008.
Ken Shoquist VP, CIO Information Technology Board Meeting October 2003
FY09 Tactical Plan Status Report for Site Networking
Presentation transcript:

Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009

2 GAIT Initiative Milestones Apr MayJunJul AugSepOctNovDecJanFebMarAprMayJun What to expect 7/1  8/31: July Asset refresh planning continues, pilots begin Server and Storage Consolidation Design Draft Disaster Recovery Plans Point of Service Surveys (Results) Initial MNS Management Reports available Continued DDM Deployment August Change Management Training Initial MNS SLA Performance Reports available Online Service Request Deployment via Maximo Server and Storage Consolidation Planning True-up Activity Server Tools Schedule Development and Pilot Service Catalog Improvements 4/1: IBM Commencement EUC Service Catalog implemented GETS Portal activated Personnel transitioned Initiated BAU Unless Strategy Solution Request Process introduced Baseline Customer Satisfaction Survey Invoices available online 5/1 – AT&T Commencement Service Desk - Regional Operation Center Support Network Mgmt moved to Raleigh Voice/Data Service Catalog implemented Begin Stand-up of Steady State Processes Process/Tool Maturation and Continuous Improvement Chargeback Implementation Begin Server & Storage Consolidation Strategic Technology Plan Agreement to Information Security Control Document DOR Print Shop Move MNS Asset Inventory Complete Initial MNS SLA Performance Reports Available 6/1 – Consolidated Service Desk “go live” Point of Service Surveys (Service Desk) Service Catalog “go live” (ordering) EUC Services Transformation Asset Inventory Continued GETS Print Shop Move

3 Agenda Introduction to Service Levels ▪What are they? ▪Why are they important? SLA Reporting and Contract Documents SLAs for Key Areas ▪Service Desk ▪End User Computing Consolidated Service Desk Update ▪Metrics Local and Network Printing Strategy Appendix ▪SLA Terminology

4 What are the three types of Service Levels?  Critical Measurements Essential to the welfare of State of Georgia Financial Service Level Credits are due for Service Level Default Represented by an Expected and a Minimum Level  Key Measurements Services are meaningful to State of Georgia business Financial Service Level Credits NOT DUE for failure to attain May be candidates for Critical Service Levels Same format (Expected / Minimum) as Critical Service Level  Critical Deliverables (One time) Usually one-time deliverables such as: service management manuals, disaster recovery plans and technology plans

5 Communication Management Performance Management Knowledge Management Data Management (Oversight) SLA & metrics handling considerations The broader picture Sharing information with the world SLA reporting communication strategy & framework Report content, design, creation, approval, delivery, distribution sequence Socializing SLAs in our environment SDO meetings Online Webinars / training Agency Head mtgs Agency Advisory Council meetings Managing behaviors SLA methodology - Flexibility of SLAs - Adding SLAs - Continuous improvement Credits & earnback SP variable compensation Managing the data Oversight Data validation Tracking Data access Data query Three metrics types Operational No minimum or expected values Leading – daily/weekly/monthly Some required by contract Key SLAs Minimum and expected values No financial penalties Critical SLAs Minimum and expected values Financial penalties Our focus today

6 Service Level Management and Reporting Details  Defined measurements and tools for Service Levels  Publish Service Level reports in the ESP Web Portal  Financial credits for non-performance or poor performance  Contract calls for continuous improvement annually  Improved visibility for all services throughout the enterprise with standardized reporting tools

7 Service Level Agreements Service Desk End User Computing

8 8 Service Desk SLAs Service Desk Services DesignationSLA Time MeasurementExpectedMinimum *First Call Problem Resolution***Resolved during first phone call80%75% *Percentage of Problems Resolved***48 hour Resolution90%85% *Call Abandoned Not ApplicableNo more than 6%No more than 8% **Speed to Answer60 seconds90%85% *Critical Measurement **Key Measurement ***Calls measured are those which are considered resolvable at the Service Desk

9 9 End User Computing SLAs End User Computing Services DesignationSLA Time MeasurementExpectedMinimum Break/Fix Break/Fix Time to RespondWithin 30 minutes during business hours90%85% Tier 1 VIP4 hour Resolution90%85% Tier 2 VIP8 hour Resolution90%85% Tier 3/Campus (350 assets within a 15 mile radius*)Next Business Day Resolution90%85% Tier 4/Remote (all other locations*) 3 Business Day Resolution90%85% Service Request IMACs5 Business Day Completion**95%90% Based upon RFP data, subject to change after the completion of the wall-to-wall inventory and True Up **Excludes new equipment orders that may take 2 – 3 weeks

10 Consolidated Service Desk Status Update

11 Speed to Answer Comparison After Improvement % of calls answered in less than 60 seconds (daily) Process much more stable after improvement

12 Metric Attainment Strategy

13 ParameterResult Mean Upper Process Limit Lower Process Limit 74.21% % 41.07% ParameterResult Mean Upper Process Limit Lower Process Limit 93.66% % 84.29% Speed to Answer (90% Answered in < 60 seconds) Pre-Process Change Volumes Attained 90% or greater 1/15 days Unstable process Significant Moving Range variance from Mean Post Process Change Volumes 90% or greater attainment on 9/10 days Stable process Note proximity of data points from Mean (less variance)

14 Abandoned Call Rate (Daily) After Improvement Process stable after improvement, target achieved. Abandon Rate Comparison

15 ParameterResult Mean Upper Process Limit Lower Process Limit 7.77% 17.43% -1.90% ParameterResult Mean Upper Process Limit Lower Process Limit 2.30% 7.25% -2.64% Abandon Rate (6%) Post Process Change Volumes Scheduling based on agency skilling volumes, arrival patterns, and trending analysis Stable process Less Moving Range variance, points closer to Mean Pre-Process Change Volumes No historical trending data available Unstable process Significant Moving Range variance from Mean

16 First Call Resolution Calculated based on Service Requests opened and closed at IBM Service Desk while user is on the phone Approximately 24,080 Service Requests opened at the IBM Service Desk (9,041 Service Requests closed at the IBM Service Desk) Password resets approximately 50% of Service Requests closed at the IBM Service Desk Other FCR categories: GETS Portal, GSMRT, Order Now, Legacy How To / Inquiry (Shines, SSL, etc.) Right to Left Strategy will drive increase in FCR Voice Trust automation will drive biometric password automation NOTE: Data is approximation and not an official month end report ParameterResult Mean Upper Process Limit Lower Process Limit Expected SLA Minimum SLA 73.67% 91.06% 56.27% 80% 75% First Call Resolution (June 1, 2009 to July 6, 2009)

17 17 First Call Resolution Examples Request TypeResolution CandidatesResolver Group Referrals Password Resets Sharepoint, VPN-SSL Firepass, Windows XP, TSO, RACF (GOES), Shines, GroupWise, GETS, Maximo, Success, e-billing, GCIC, PeopleSoft, voic , OS Support Usage issues with Windows XP, 2000, Vista, Novell Mainframe, Unix, Application/Platform Support Web Applications (ga.gov, teamgeorgia, PW reset, CDC SSL Certificate verification, Intranet connectivity/browser interface) Telephony (Media Player MP3) Connectivity (desktop verification, my network places, Device Manager, etc.) Triage (GETS, Maximo, OrderNow) Web (extra net) Telephony Break Fix. Connectivity (ISR, Switch, router resets)

18 GTA Service Desk Volumes GTA Service Desk show consistent saw tooth pattern Volumes decrease as days in the week progress Mondays are busiest days of the week Fridays are least busy day of the week Quarter/month end activities drove week 1 go live volumes 4 th of July volumes (week 5) fell below Mean ParameterResult Mean Upper Process Limit Lower Process Limit 1, calls 1, calls calls GTA Service Desk Volumes (June 1, 2009 to July 10, 2009)

19 Local Printer Strategy

20 Local Printer Support The Enterprise strategy is to reduce local printers and increase network printers for cost efficiency as well as environmental focus VIPs or those with business need will keep local printers; others will be mapped to a network printer Local printer failures will not be repaired/replaced if there is an available network printer nearby Network printers are being installed throughout the Enterprise as part of the PC Refresh

21 Appendix

22 Service Level Terminology Service Level Agreement (SLA) – An agreement that specifies “how well” we want the service provider to perform services Critical Measurement – Those service levels that are measured and have financial liability to the service provider if they are not performed ($$ at risk) Key Measurements – Those service levels that are measured and do NOT have financial liability to the service provider if they are not performed ($$ not at risk) Critical Deliverable – A one-time service level that must be met

23 Expected Service Level – The average of past performance that the Service Provider must consistently meet Minimum Service Level – The minimum service level that the Service Provider must always remain above Service Level Terminology