Session 21: The options to expand and abandon

Slides:



Advertisements
Similar presentations
Aswath Damodaran1 Session 19: The essence of real options Aswath Damodaran.
Advertisements

SESSION 20: THE ESSENCE OF REAL OPTIONS Aswath Damodaran 1.
THE FINAL REVIEW: THE REST OF THE MATERIAL
Compound Interest Suppose you invest $100 in an account that will pay 10% interest per year. How much will be in the account after three years? – Year.
CHAPTER 14 Real Options.
Lecture 8 - Capital Budgeting: Estimating Cash Flows and Analyzing Risk.
CORPORATE FINANCIAL THEORY Lecture 3. Interest Rate Cash Flow Interest Rate and Cash Flow - REALITY Is not guaranteed Has many different sources.
Stocks and Their Valuation Chapter 10  Features of Common Stock  Determining Common Stock Values  Preferred Stock 10-1.
WEMBA 2000Real Options26 Introducing Real Options What are Real Options? Expansion Options: Starsoft Inc. is considering expanding its internet software.
Real Options The Right to do Something Real. Introduction The classical DCF valuation method involves a comparison between the cost of an investment project.
Project Interactions, Side Costs, and Side Benefits 05/05/08 Ch. 6.
Chapter 4 Real Options and Project Analysis
CHAPTER 13 Other Topics in Capital Budgeting Evaluating projects with unequal lives Identifying embedded options Valuing real options in projects.
Options in Projects/Investments/Acquisitions F One limitation of traditional investment analysis (NPV) is that it is static and does not adequately capture.
Real Options and Other Topics in Capital Budgeting
CAPITAL BUDGETING AND CAPITAL BUDGETING TECHNIQUES FOR ENTERPRISE Chapter 5.
Aswath Damodaran1 The Value of Cash and Cross Holdings.
Key Concepts and Skills
Aswath Damodaran1 The Value of Intangibles Aswath Damodaran.
Stocks & Stock Market Primary Market - Place where the sale of new stock first occurs. Initial Public Offering (IPO) - First offering of stock to the general.
Aswath Damodaran1 Option Pricing Theory and Real Option Applications Aswath Damodaran.
5.1 Option pricing: pre-analytics Lecture Notation c : European call option price p :European put option price S 0 :Stock price today X :Strike.

Prof. Ian Giddy New York University Valuation of New Ventures.
Aswath Damodaran1 Session 20: The Option to Delay Valuing patents and natural resource reserves.
OPTION PRICING: BASICS Aswath Damodaran 1. 2 The ingredients that make an “option” Aswath Damodaran 2  An option provides the holder with the right to.
SESSION 23: VALUING EQUITY IN DISTRESSED FIRMS AS AN OPTION Aswath Damodaran 1.
1 Supplementary Notes Present Value Net Present Value NPV Rule Opportunity Cost of Capital.
Accounting Principles, Ninth Edition
1 Practical Problems in Capital Budgeting Lecture 3 Fall 2010 Advanced Corporate Finance FINA 7330 Ronald F. Singer.
14-0 Week 12 Lecture 12 Ross, Westerfield and Jordan 7e Chapter 14 Options and Corporate Finance.
MINICASE.
1 THE INTERNAL RATE OF RETURN (IRR) is the discount rate that forces the NPV of the project to zero.
J. K. Dietrich - GSBA 548 – MBA.PM Spring 2007 Investment Strategy April 11, 2007 (LA) or April 5, 2007 (OCC)
F305 Intermediate Corporate Finance Indiana University Class 5.
Real Option Valuation Marking to Market Prof. Luiz Brandão 2009.
12-1 Capital Budgeting and Financial Planning LECTURE 22 Course Instructor: M. Jibran Sheikh.
Prof. Martin Lettau 1 Option Pricing Theory and Real Option Applications Prof. Martin Lettau.
© Prentice Hall, Corporate Financial Management 3e Emery Finnerty Stowe Derivatives Applications.
Index, Currency and Futures Options Finance (Derivative Securities) 312 Tuesday, 24 October 2006 Readings: Chapters 13 & 14.
David KilgourLecture 91 Foundations of Finance Lecture 6 Option Pricing Read: Brealey and Myers Chapter 20 Practice Questions 2, 3 and 14 on page612 Workshop.
Contemporary Engineering Economics
1 Real Options Ch 13 Fin The traditional NPV rule is a passive approach because … The traditional NPV approach assumes  mangers do not have influence.
8-1 Stocks and Their Valuation. 8-2 Cash Flows for Stockholders If you buy a share of stock, you can receive cash in two ways The company pays dividends.
Young Li, Barclay James, Ravi Madhavan, & Joseph Mahoney 2007 Advances in Strategic Management REAL OPTIONS: TAKING STOCK AND LOOKING AHEAD.
1 CHAPTER 12 Real Options Real options Decision trees Application of financial options to real options.
Aswath Damodaran1 Real Options I: Tests. Aswath Damodaran2 A viable investment today? A small start up company has come up with a new cell phone technology.
Venture Capital and the Finance of Innovation [Course number] Professor [Name ] [School Name] Chapter 22 Binomial Trees.
Session 13: dilution and liquidity
Session 23: The Option to delay
Aswath Damodaran Updated: January 2017
Session 23: The Option to delay
Introducing Real Options
Aswath Damodaran Updated: January 2017
Session 24: The Option to expand & abandon
Mergers & Acquisitions: Acquiring an Option
Session 22: The Essence of real options
Session 22: The Essence of real options
Aswath Damodaran Updated: January 2017
Aswath Damodaran Updated: September 2016
Session 11: From ASSET to equity value
Session 24: The Option to expand & abandon
Session 13: dilution and liquidity
Valuation Tools webcast: Valuing a patent
Session 26: Valuing declining & distressed companies
Session 26: Valuing declining & distressed companies
Loose Ends II.
Aswath Damodaran Updated: January 2019
Presentation transcript:

Session 21: The options to expand and abandon

The Option to Expand/Take Other Projects Taking a project today may allow a firm to consider and take other valuable projects in the future. Thus, even though a project may have a negative NPV, it may be a project worth taking if the option it provides the firm (to take other projects in the future) provides a more-than-compensating value. These are the options that firms often call “strategic options” and use as a rationale for taking on “negative NPV” or even “negative return” projects. A project may be the first in a sequence.

The Option to Expand PV of Cash Flows from Expansion Additional Investment Here, the initial project gives you the option to invest an additional amount in the future which you will do only if the present value of the additional cash flows you will get by expanding are greater than the investment needed. For this to work, you have to do the first project to be eligible for the option to expand. to Expand Present Value of Expected Cash Flows on Expansion Expansion becomes Firm will not expand in attractive in this section this section

An Example of an Expansion Option Ambev is considering introducing a soft drink to the U.S. market. The drink will initially be introduced only in the metropolitan areas of the U.S. and the cost of this “limited introduction” is $ 500 million. A financial analysis of the cash flows from this investment suggests that the present value of the cash flows from this investment to Ambev will be only $ 400 million. Thus, by itself, the new investment has a negative NPV of $ 100 million. If the initial introduction works out well, Ambev could go ahead with a full-scale introduction to the entire market with an additional investment of $ 1 billion any time over the next 5 years. While the current expectation is that the cash flows from having this investment is only $ 750 million, there is considerable uncertainty about both the potential for the drink, leading to significant variance in this estimate. This is a negative net present value project, but it gives Disney the option to expand later. Implicitly, we are also saying that if Disney does not make the initial project investment (with a NPV of - $ 20 million), it cannot expand later into the rest of Latin America.

Valuing the Expansion Option Value of the Underlying Asset (S) = PV of Cash Flows from Expansion to entire U.S. market, if done now =$ 750 Million Strike Price (K) = Cost of Expansion into entire U.S market = $ 1000 Million We estimate the standard deviation in the estimate of the project value by using the annualized standard deviation in firm value of publicly traded firms in the beverage markets, which is approximately 34.25%. Standard Deviation in Underlying Asset’s Value = 34.25% Time to expiration = Period for which expansion option applies = 5 years Call Value= $ 234 Million This values the option, using the Black Scholes model. The value from the model itself is affected not only by the assumptions made about volatility and value, but also by the asssumptions underlying the model. The value itself is not the key output from the model. It is the fact that strategic options, such as this one, can be valued, and that they can make a significant difference to your decision.

Considering the Project with Expansion Option NPV of Limited Introduction = $ 400 Million - $ 500 Million = - $ 100 Million Value of Option to Expand to full market= $ 234 Million NPV of Project with option to expand = - $ 100 million + $ 234 million = $ 134 million Invest in the project A bad project, with options considered, becomes a good one.

Opportunities are not Options…

The Option to Abandon A firm may sometimes have the option to abandon a project, if the cash flows do not measure up to expectations. If abandoning the project allows the firm to save itself from further losses, this option can make a project more valuable. PV of Cash Flows from Project You would like to abandon a project, once you know that it will create only negative cash flows for you. This is not always possible, because of contracts you might have entered into with employees or customers. Cost of Abandonment Present Value of Expected Cash Flows on Project

Valuing the Option to Abandon Airbus is considering a joint venture with Lear Aircraft to produce a small commercial airplane (capable of carrying 40-50 passengers on short haul flights) Airbus will have to invest $ 500 million for a 50% share of the venture Its share of the present value of expected cash flows is 480 million. Lear Aircraft, which is eager to enter into the deal, offers to buy Airbus’s 50% share of the investment anytime over the next five years for $ 400 million, if Airbus decides to get out of the venture. A simulation of the cash flows on this time share investment yields a variance in the present value of the cash flows from being in the partnership is 0.16. The project has a life of 30 years. We are assuming that the developer will be in a position to honor his or her commitment to buy back Disney’s share for $ 150 million.

Project with Option to Abandon Value of the Underlying Asset (S) = PV of Cash Flows from Project = $ 480 million Strike Price (K) = Salvage Value from Abandonment = $ 400 million Variance in Underlying Asset’s Value = 0.16 Time to expiration = Life of the Project =5 years Dividend Yield = 1/Life of the Project = 1/30 = 0.033 (We are assuming that the project’s present value will drop by roughly 1/n each year into the project) Assume that the five-year riskless rate is 6%. The value of the put option can be estimated as follows: These are the inputs to the model. The likelihood of abandonment will increase over time, as the value of the project decreases.

Should Airbus enter into the joint venture? Value of Put =Ke-rt (1-N(d2))- Se-yt (1-N(d1)) =400 (exp(-0.06)(5) (1-0.4624) - 480 exp(-0.033)(5) (1-0.7882) = $ 73.23 million The value of this abandonment option has to be added on to the net present value of the project of -$ 20 million, yielding a total net present value with the abandonment option of $ 53.23 million. If you can negotiate this option into your investment projects, you increase their value. To the degree that you have to pay for this option, you would be willing to pay up to $ 7.86 million.

Implications for Investment Analysis/ Valuation Having a option to abandon a project can make otherwise unacceptable projects acceptable. Other things remaining equal, you would attach more value to companies with More cost flexibility, that is, making more of the costs of the projects into variable costs as opposed to fixed costs. Fewer long-term contracts/obligations with employees and customers, since these add to the cost of abandoning a project. These actions will undoubtedly cost the firm some value, but this has to be weighed off against the increase in the value of the abandonment option.