Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep 2012 1 Level-1 Trigger in 2012 Manfred Jeitler HEPHY Vienna -90 kHz rate  - 3% deadtime.

Slides:



Advertisements
Similar presentations
Level-1 Trigger CMS Week, Brussels 14 Sep C.-E. Wulz Deputy Trigger Project Manager Institute of High Energy Physics, Vienna Prepared with slides/material.
Advertisements

1 The ATLAS Missing E T trigger Pierre-Hugues Beauchemin University of Oxford On behalf of the ATLAS Collaboration Pierre-Hugues Beauchemin University.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, UPO Meeting, July 6, 2012 Trigger Performance and Strategy Working Group Trigger Performance.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
The CMS Level-1 Trigger: System and Operation Christian Hartl (CERN) on behalf of CMS SPG-ÖPG, Lausanne, 15 June 2011.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
The ATLAS trigger Ricardo Gonçalo Royal Holloway University of London.
Patrick Robbe, LAL Orsay, for the LHCb Collaboration, 16 December 2014
Samuel Silverstein Stockholm University L1Calo upgrade discussion Overview Issues  Latency  Rates  Schedule Proposed upgrade strategy R&D.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The CMS Level-1 Trigger System Dave Newbold, University of Bristol On behalf of the CMS collaboration.
Manfred Jeitler, HEPHY Vienna CMS Level-1 Trigger MGU, 11 July The Level-1 Trigger of the CMS Experiment at LHC Design, challenges and performance.
Manfred Jeitler, HEPHY Vienna Trigger Systems at LHC Experiments Instr-2008, Novosibirsk, 4 March Trigger Systems at LHC Experiments Manfred Jeitler.
Copyright © 2000 OPNET Technologies, Inc. Title – 1 Distributed Trigger System for the LHC experiments Krzysztof Korcyl ATLAS experiment laboratory H.
Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menu Working Group CERN, 9 November 2000 Global Trigger Overview.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
ATLAS Forward Detector Trigger ATLAS is presently planning to install forward detectors (Roman Pot system) in the LHC tunnel with prime goal to measure.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
11 Sep 2009Paul Dauncey1 TPAC test beam analysis tasks Paul Dauncey.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1 Triggering on Diffraction with the CMS Level-1 Trigger Monika Grothe, U Wisconsin HERA-LHC workshop March 2004 Need highest achievable LHC Lumi, L LHC.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
CMS Week Sept '07Leonard Apanasevich (UIC) Pedrame Bargassa (Rice) 1 Physics Priorities for Trigger Development Leonard Apanasevich (UIC) Pedrame Bargessa.
Diffractive Higgs studies with CMS and TOTEM: Status, plans and possibilities for Torino Monika Grothe TO-CMS meeting October
LHCb VELO Upgrade Strip Chip Option: Data Processing Algorithms Giulio Forcolin, Abdul Afandi, Chris Parkes, Tomasz Szumlak* * AGH-Krakow Part I: LCMS.
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
ATLAS-ALFA as a beam instrument Sune Jakobsen (BE-BI-PM and PH-ADO) on behave of the ATLAS-ALFA community LS1 LBOC meeting
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment is one of the four major experiments operating at the Large Hadron Collider.
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
Vienna Group Discussion Meeting on Luminosity CERN, 9 May 2006 Presented by Claudia-Elisabeth Wulz Luminosity.
1 Arnold Pompoš, SUSY03, Tucson, Arizona, June 5-10, 2003.
L1 Global Muon Trigger Simulation Status URL of this presentation:
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
Living Long At the LHC G. WATTS (UW/SEATTLE/MARSEILLE) WG3: EXOTIC HIGGS FERMILAB MAY 21, 2015.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment [1] is one of the four major experiments operating at the Large Hadron Collider.
BEACH 04J. Piedra1 SiSA Tracking Silicon stand alone (SiSA) tracking optimization SiSA validation Matthew Herndon University of Wisconsin Joint Physics.
1 J. Varela, CMS Trigger, RT09, Beijing, May 2009 J. Varela IST/LIP Lisbon CMS Trigger Project Manager 16 th IEEE NPSS Real Time Conference May 10-15,
ATLAS UK physics meeting, 10/01/08 1 Triggers for B physics Julie Kirk RAL Overview of B trigger strategy Algorithms – current status and plans Menus Efficiencies.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
Sundry LHC Machine Development starts 19 June –Original plan to have 90m comm. next week was torpedoed by private discussions between spokesperson and.
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
uGT 2016 operations and outlook for 2017
L1Calo upgrade discussion
TTC signals: Global Trigger and Global Muon Trigger
Optical data transmission for
CMS Trigger Coordinator
CMS Preshower: Startup procedures: Reconstruction & calibration
ATLAS L1Calo Phase2 Upgrade
Status of Full Simulation for Muon Trigger at SLHC
CMS SLHC Calorimeter Trigger Upgrade,
CMS Feedback on the High pileup (PU) Fill
LHC Collisions.
Example of DAQ Trigger issues for the SoLID experiment
Trigger  Detectors at 420m can be included in the HLT
Commissioning of the ALICE-PHOS trigger
Global Trigger and Global Muon Trigger
The LHCb Front-end Electronics System Status and Future Development
Global Trigger and Global Muon Trigger Latency
Presentation transcript:

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep Level-1 Trigger in 2012 Manfred Jeitler HEPHY Vienna -90 kHz rate  - 3% deadtime  CMS run LHC Fill 2998

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep challenges and performance in 2012 n LHC very successfully increased luminosity n n up to almost 8e33 –PeakLumi = ×10 30 cm -2 sec -1 –PeakPileup = –in run (fill 2998) n cope with this without losing good data!

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep plot by Darin Acosta challenges and performance in 2012

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep challenges and performance in 2012 more and more trigger algos must be disabled  ! (mapopripped) plot by Darin Acosta

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep muon rate strongly suppressed......while keeping the efficiency n mainly by better pt assignment in CSC Track Finder n also by more sophisticated merging scheme in GMT –Global Muon Trigger n rate down by 50% –over full range –30% for |η|<2.1 shown in plot

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep calorimeter jet seed threshold n jet an especially HT rates are strongly pileup dependent –HT is ET summed over identified jets above (low) energy threshold »10 GeV –overall illumination of calorimeter creates fake jets n cure: introduce threshold for jet “seed” –currently 5 GeV n must be done in GCT –Global Calorimeter Trigger, upstream of GT (Global Trigger) –outside of “Level-1 trigger menu” n very effective in reducing rates

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep calorimeter jet seed threshold

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep L1 trigger close to its present limit but not at the end of its tether! n with LHC’s impressive progress we have had to also improve the trigger –by just raising thresholds we would be losing physics already n substantial improvements achieved this year n some more still be possible n but to profit from the LHC upgrade CMS also must upgrade the L1 trigger

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep L1 upgrade stage zero: optical links between GCT and GT n fast galvanic serial links between GCT and GT had been a worry –no spares available, no data check possible n new electronic modules with optical links installed before 2012 run –“Optical PSB” (or “oGTI”) –learning experience for mostly optical connections in upgrade project n CRC check recently implemented n must be careful when touching a running system –due to misconfiguration calo monitoring data were not correctly read for some time –now fixed, everything working fine –don’t forget certain “features” such as GCT input masking!

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep Sorry for keeping you waiting... n... but we know (now) that you enjoy your L1 trigger just as much if it’s served 12 BX later! n... and it will taste better if cooked a bit longer!

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep Why just-in-time delivery of L1A? n the upgraded trigger will be better than the present system n but not faster : –carry out more complex operations –collect and use more information for decision making –use of serial optical links allows using more information (higher bandwidth) and is less error prone (fewer cables that can break) but requires time for SERialization / DESerialization (SerDes)

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep latency + 12 BX test n finding the maximum admissible latency is not trivial because: n Tracker and Preshower might become gradually inefficient at too high latency n can only be checked realistically with data n +12 BX on top of present (production) latency is theoretical maximum –at higher latency inefficiency must occur at some level n the test in June showed that +12 BX is safe! –took a full fill with this latency, data are OK –rolled back for production afterwards –we will certainly use this budget for the L1 Trigger upgrade

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep L1 and BPTX n present CMS configuration relies on BPTX beam monitor being fully available all the time –have to tell collision bunches from gaps between: –for suppressing HF prefiring (see below) –for calculating the trigger dead time –for special checks (e.g., beamgas events in unpaired bunches) n this dependence is dangerous –as shown by a few (rare) hickups n other option: just use filling scheme published by LHC –also this is not always failsafe –ATLAS relied on it and lost some data

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep BPTX : coping with the dependence n ideal: take LHC record and cross-check with BPTX before stable beams –cannot change after ramp –implementation in progress n in the meantime: have created special configuration key for running without BPTX –not ideal for data but reduced dependence n early warning system in case of BPTX problems –DQM plots developed to warn about problems already during LHC ramp n what about long-term maintenance of BRM / BPTX ? –small group –importance tends to be understimated by funding agencies

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep HF Prefiring n prefiring of HF from particles hitting the photomultipliers directly –instead of creating scintillation light in the detector, as a well- behaved particle should n suppress now by vetoing bunch crossings before a collision crossing –this is why we need BPTX most badly! –“PreBPTX veto” –impossible in 25-ns running –for upcoming 25-ns test: will probably not use jet triggers n HF will replace all photomultipliers during LS1 –hope that this will fix the problem –if not: remove HF from single-object triggers

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep forward physics: collaboration with TOTEM n CMS and TOTEM are two separate experiments with separate DAQ –might change over LS1 n but their triggers cooperate –CMS receives several bits from TOTEM over LVDS signals –some “Technical Trigger” bits, some used in Algorithms –TOTEM receives from CMS the L1A and some BGOs »via an unused “APVE output” –including BC0 (“bunch crossing zero”) and OC0 (“orbit counter reset”) –  can merge CMS and TOTEM data off line n several successful low-lumi runs taken jointly n CMS will use TOTEM’s “T2” for minimum-bias trigger in upcoming p-Pb test run

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep where is TOTEM? Roman Pots 9.5 < η < m, 220 m

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep CMS Talking To TOTEM

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep BCM1F for beam-gas veto? n last year’s beam gas problems prompted studies to reduce effect at Level-1 by using the “BCM1F” detector –fight beamgas-induced high trigger rate by veto signal –such events may be worse than normal events because of high Pixel occupancy –Previously Known as PKAMs –other idea: use HF asymmetry n beam gas much less of a problem in 2012 –  hard to study the veto performance –but also less important! n no conclusion yet if this approach will (have to) be used

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep give me more... backup slides

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep BC0 BX=a BX=a+m+n BX=a+m physics triggers

Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep BC0 BX=3490 BX=3490+m+n BX=3490+m TEST same BX as before calibration trigger