Defined plateau region Knee 95% WP=knee+150V RPC operation and Hardware Performance  Annual HV module recalibration – all CAEN A3512N HV module offsets.

Slides:



Advertisements
Similar presentations
Level-1 Trigger CMS Week, Brussels 14 Sep C.-E. Wulz Deputy Trigger Project Manager Institute of High Energy Physics, Vienna Prepared with slides/material.
Advertisements

Giuseppe Roselli (CMS-RPC) Università degli Studi di Bari – INFN RPC Efficiency with Track Reconstruction Giuseppe Roselli.

Karol Buńkowski Warsaw University The RPC based muon trigger of the CMS Experiment XI Workshop on Resistive Plate Chambers and Related Detectors, 5-10.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
CMS Physics Meeting, Dec. 6, Analysis Note on the Validation of the ORCA Simulation of the Endcap Muon CSC Front-end Electronics S. Durkin -- Ohio.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
IJAZ AHMEDNational Centre for Physics1. IJAZ AHMEDNational Centre for Physics2 OUTLINES oLHC parametres oRPCs oOverview of muon trigger system oIdea of.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
A data-driven performance evaluation method for CMS RPC trigger system & Study of Muon trigger efficiencies with official Tag & Probe package for ICHEP.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
RPC Readiness for Data-taking RPC Collaboration 1.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Level 3 Muon Software Paul Balm Muon Vertical Review May 22, 2000.
Run Coordination Report 4th RPC General Meeting (CMS week) Luigi BENUSSI, Hassan SHAHZAD, Nicolas ZAGANIDIS.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
1 Status Report RPC Diagnostic with DT Segment Extrapolation Camilo Carrillo CERN Departamento de Física UNIVERSIDAD DE LOS ANDES Bogotá, Colombia.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
The DHCAL Data Analysis José Repond CALICE Meeting, Prague, September 10 – 12, 2007.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
NEC Varna sep 12-18, 2005 A. Marinov Andrey Marinov On behalf of the CMS Forward RPC Collaboration Y. Ban, J. Cai, H. Liu, S. Qian, Q. Wang, Y. Ye, J.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
A. Meneguzzo Padova University & INFN Validation and Performance of the CMS Barrel Muon Drift Chambers with Cosmic Rays A. Meneguzzo Padova University.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
Simulation of the CMS Endcap Alignment Scheme Using COCOA.
+ GE2/1 Case Considerations Alexei Safonov. + CMS Muon Upgrades CMS Technical Proposal in its part related to muon systems lists following: MEX/1 electronics.
1 Analysis of Small RPC DHCAL Prototype Data (noise and cosmic ray) LCWA09, Albuquerque, New Mexico Friday, October 02, 2009 Qingmin Zhang HEP Division,
L0 trigger update Bruno Angelucci INFN & University of Pisa.
Effects of Endcap Staging/Descoping D.Acosta University of Florida.
BESIII offline software group Status of BESIII Event Reconstruction System.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
1 J. Varela, CMS Trigger, RT09, Beijing, May 2009 J. Varela IST/LIP Lisbon CMS Trigger Project Manager 16 th IEEE NPSS Real Time Conference May 10-15,
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
(University of Sofia “St. Kliment Ohridski”)
CMS muon detectors and muon system performance
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
Barrel RPC Conditions Database
Summary: Workshop on CMS Beam Conditions, Radiation Monitoring and Luminosity Systems Oliver Stein, May 2013, CERN.
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
The IFR Online Detector Control at the BaBar experiment at SLAC
Han Jifeng BESIII MUON GROUP IHEP, CAS
RPC Detector Control System
Performance of a Multigap RPC prototype for the LHCb Muon System
Project Presentations August 5th, 2004
RPC Detector Control System
The IFR Online Detector Control at the BaBar experiment at SLAC
RPC Detector Control System
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Pierluigi Paolucci & Giovanni Polese
Low Level HLT Reconstruction Software for the CMS SST
RPC Detector Control System
Pre-installation Tests of the LHCb Muon Chambers
Resistive Plate Chambers performance with Cosmic Rays
The CMS muon system performance
Contents First section: pion and proton misidentification probabilities as Loose or Tight Muons. Measurements using Jet-triggered data (from run).
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC approved plots.
Presentation transcript:

Defined plateau region Knee 95% WP=knee+150V RPC operation and Hardware Performance  Annual HV module recalibration – all CAEN A3512N HV module offsets recalibrated  No current drift in the Endcap RPC after the lowering of the UXC environmental Temperature  The average RPC chamber current per wheel or disk is lower than 3 µA for high luminosity beams.  Number of RPC operated in Single Gap mode is unchanged in 2011: 6 in the Barrel and 20 in the Endcap  Number of active electronic channels is very stable ~ 98.5%  A dedicated HV scan was performed to identify the working point (WP) of each RPC roll and each HV channel  Additional Pressure correction is foreseen to be implemented next TS in order to compensate the P-variations  Stable and Reliable performance of RPC detector during the CMS operation - No RPC DEAD time during recent CMS operation, only 2 RPC problems have caused a downtime to CMS data taking! HV scan fit ε(HV) = ε max /(1 + e Slope (HV-HV50%) )

RPC Trigger Performance  In 2011 the RPC Trigger Efficiency has improved due to:  New 3/6 RPC PAC trigger algorithm: in the barrel at least 3 out of 6 available layers are required to be fired in order a muon candidate to be generated. 4 layers were required in  efficiency in the barrel increased  Improved geometrical acceptance: The optical links were rearranged to obtain better geometrical coverage in the gap region between RB0 and RB+/- 1  additional increase of the efficiency in the |  | ~0.3  The Entire Online Software was migrated from XDAQ to Trigger Supervisor  Front-end Electronics Threshold Configuration from database  HSCP trigger enabled: The PAC is now able to trigger “slow” particles, which reach the muon system in the next BX. It looks for the coincidence of hits in two consecutive BX, the candidate BX is determined by the BPTX trigger veto. Offline muon p T > 8GeV/c Offline muon p T > 8GeV/c Offline muon p T > 7GeV/c Offline muon p T > 7GeV/c L1 RPC Trigger Efficiency including detector geometrical acceptance and hit efficiency vs L1 CSC or DT trigger

RPC Detector Performance SF6 problem + HV scan Very Stable Performance after RUN All RPC chambers working at a fixed applied HV: HV endcap = 9550 Volts All RPC chambers working at a fixed applied HV: HV barrel = 9350 Volts Data taken during the HV scan are analysed and used to define the HV settings per individual HV channel. SF6 problem + HV scan 20 April May April 2011