EU Tariff Code Update 23 rd June 2014. 2 EU Tariff Code Update – early feedback  Informal ACER feedback:  Draft code not on line with FG and insufficient.

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

Update on EU Tariff Framework Guideline Richard Miller UNC Transmission Workgroup 03/10/2013.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Planning for allocation rules and the auction platform NRAs propose to follow a two-steps approach:. 2013: » Based on the wish-list and within the scope.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
GRI NW European Energy Work Plan 2011 – 2014 Programme Office RCC meeting, 15 September 2011.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
2. EU Tariff Code – Emerging Issues. EU Tariff Code – ACER Feedback No.ACER Request/Issue 1Redefine Transmission Services Definition -Harmonised definition.
The big picture in the EU Managing conflicting objectives in tariff design Tom Maes, Vice-Chair CEER Gas Working Group Understanding the impact of regulatory.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Development of the TAR NC: Refinement Workshop Jan Ingwersen ENTSOG Introduction and Meeting Objectives TAR NC Refinement WS – 24 September 2014.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
© ONTRAS Development and innovative strategies for transmission system operators Ralph Bahke Managing Director, ONTRAS.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
GRI NW Investment - Update on project Common effort on making regional investment happen 21 September 2010.
Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
The next steps for regional co-operation GRI NW Stakeholder Group 25 November 2011.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Conclusions workshop Dublin.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
European Developments Transmission Workgroup 1 st December 2011.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
European Market Model Implementation CIM Users Group Spring Meeting Praha, Czech Republic.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
European Developments Transmission Workgroup 3 rd May 2012.
Transmission Pricing Webinar 12 October Agenda for Webinar Introductions Purpose Potential Areas of Change – Overview –Revenue Proposal –Business.
Alternative Approach to Enduring Exit Flat Capacity & Revenue Recovery Gas TCMF 14 th December 2006.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28/29 September 2010 Draft framework guideline on balancing in natural gas transmission.
NRA’s vision on GRI NW work plan 2011 Stakeholder Group meeting Brussels, 26 November 2010 Peter Plug Chairman of GRI NW.
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Public Consultation : main conclusions (1/2)
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
EU Tariffs Code Update Based on Refined Draft as of 30th October
EU Implementation Programme
Background and Process
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
The Incremental Proposal
Information related to auction premium
EU Codes: Implementation Issues
ERGEG comment to KEMA study on Art. 3 and 7
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
EU CAM Network Code and CMP Guideline Proposal Update
Presentation transcript:

EU Tariff Code Update 23 rd June 2014

2 EU Tariff Code Update – early feedback  Informal ACER feedback:  Draft code not on line with FG and insufficient harmonisation  Not coherent and “trying to please everyone”  Fixed price: don’t like indexation but use of premium could have merit  “open for discussion” on one-off reset of capacity (Commission thinks stakeholders have good arguments so want to hear counter arguments from TSOs)  Informal Prime Movers feedback  Draft code too open with no harmonisation and little progress  For Cost Allocation Methodologies it would be better to have general principles rather than writing methodologies into law  Confusion over which revenues subject to code and which are not

3 EU Tariff Code Update  Draft Tariff Code open for consultation  Stakeholder workshop 25 June ENTSOG shall focus on:  Scope and interaction with CAM  Mitigating measures (including discussion of one-off capacity reset)  Capacity Allocation Approach (including how capacity/ commodity split could work for revenue recovery)  Multipliers  Interruptible (including justification for use of ex-post discount and pricing of non-physical back-haul the same as physical)  Use of fixed prices at IPs

4 Mitigating measures  Spread increase or decrease in tariffs over a couple of years so that there is a glide path for tariff changes  Use the auction premium, if any, to mitigate against tariff increases  While ENTSOG is not in favour of the one off capacity reset option, it is open to discussing other mitigating measures that would not undermine contractual commitments

5 One off capacity reset option  ENTSOG concerns include:  Could lead to severe instability in the market and impact on tariff stability in the future  Could cause cross-subsidisation between different users and a non- cost reflective redistribution of costs  Penalises network users needing gas, the remaining gas users will pay for the choices of other gas users  Discourages new entrants from coming into the market  Impact on investments. Those that triggered investment in the past and made commitments to underpin that investment may return the capacity and then that investment would have to be paid for by those that rebook capacity or keep their existing capacity bookings.

6 Transmission services definition  ACER want:  clarity of what is in scope and what is out.  cap on amount of allowed revenue not included in definition of “transmission services”  detailed list of what is not part of “transmission services”  Prime movers want to know:  how revenue recovery works for services that are not part of “transmission services”  how does “complementary revenue recovery charge” work  how one regulatory account works with other rules

Total Allowed Revenue Transmission Services Revenue Revenue from other regulated activities (exclusions from Trans services definition) CAP Part of Transmission Services Revenue COM Part of Transmission Services Revenue CRRC CAP Part of Transmission Services Revenue Reference Prices €90m€80m€60m €40m €10m €20m €2/u Cap/Com split = 75%:25% €1/u Cost Allocation Approach – with Capacity, Commodity and Complementary ReRe Charge Assumptions Booked capacity: 20 units Throughput: 20 units

Multipliers 8 Concern from TSOs over multipliers Definition of congestion (link to CMP) Safeguard to allow multipliers greater than 1.5 if certain criteria met

9 Some suggested fixed price mechanisms could be: (1)fixed price + indexation (2)fixed price + a risk premium (3)fixed price + a variable charge (4)fixed price + a combination of indexation, and a premium or variable charge. Fixed Price Mechanisms

10 Payable Price = Fixed Price + A Combination Fixed price + indexation + a risk premium + an auction premium, if any Fixed price + a risk premium + a variable charge + an auction premium, if any Fixed price + indexation + a variable charge+ an auction premium, if any