Attribution of Haze Phase 2 and Technical Support System Project Update AoH Meeting – San Francisco, CA September 14/15, 2005 Joe Adlhoch - Air Resource.

Slides:



Advertisements
Similar presentations
Attribution of Haze Workgroup & Technical Support System Report Fire Emissions Joint Forum Meeting July
Advertisements

TSS Architecture Definition Context. TSS Scoping Study Context Detailed Requirements Specification (products, functionality) High Level Architecture Description.
Technical Support System Review / / RPO Monitoring/Data Analysis Workgroup Conference.
TSS Project Update WRAP Technical Analysis Forum San Francisco, CA October 11, 2007.
Weight of Evidence Checklist Review AoH Work Group Call June 7, 2006 Joe Adlhoch - Air Resource Specialists, Inc.
Technical Support System Review Board Meeting March 8, 2007.
Improving an Air Quality Decision Support System through the Integration of Satellite Data with Ground-based, Modeled, and Emissions Data NASA ROSES 2007:
WRAP Technical Support System Project Update AoH Call October 19, 2005.
WRAP Decision and Data Support Systems Tom Moore | Western Governors’ Association Shawn McClure | Cooperative Institute for Research in the Atmosphere.
Attribution of Haze Report Status Fire Emissions Joint Forum Meeting December 8, 2004 Tom Moore Marc Pitchford.
AoH Report Update Joint DEJF & AoH Meeting, Las Vegas November , 2004 Air Resource Specialists, Inc.
Fire Emissions Joint Forum –Section 308 Strategies for Fire Coordinating efforts of states changing or developing smoke management strategies for regional.
2004 Workplan WRAP Regional Modeling Center Prepared by: Gail Tonnesen, University of California Riverside Ralph Morris, ENVIRON Corporation Zac Adelman,
PM2.5 Model Performance Evaluation- Purpose and Goals PM Model Evaluation Workshop February 10, 2004 Chapel Hill, NC Brian Timin EPA/OAQPS.
Attribution of Haze Phase 2 and Technical Support System Project Update Dust Emissions Joint Forums – Tempe, AZ November 16, 2005.
United States Department of Agriculture Food Safety and Inspection Service 1 National Advisory Committee on Meat and Poultry Inspection August 8-9, 2007.
TSS Project Update WRAP Technical Analysis Forum San Francisco, CA October 11, 2007.
An Update on the Colorado Regional Haze SIP Process and Outcomes Presented at: WRAP – Implementation Work Group San Francisco, CA March 2005.
WRAP Committee and Forum Updates WRAP Board Meeting Salt Lake City, UT October 15, 2003.
Causes of Haze Update Prepared by Marc Pitchford for the 5/24/05 AoH conference call.
Next Steps in Regional Haze Planning in the Western U.S. Prepared by the WESTAR Planning Committee for the Fall Business Meeting, Tempe, AZ October 31,
AoH Phase I Report Outline AoH Meeting, Salt Lake City September 21-22, 2004 Air Resource Specialists, Inc.
Response to WRAP Air Managers Committee Memo “Request for Cost Estimates” April 6, 2009 WESTAR Council.
TSS Project Update and Demo of Selected Tools WRAP IWG Meeting Santa Fe, NM December 7, 2006.
Regional Haze SIP Development Overview AQCC Presentation July 2005.
An Integrated Systems Solution to Air Quality Data and Decision Support on the Web GEO Architecture Implementation Pilot – Phase 2 (AIP-2) Kickoff Workshop.
Causes of Haze Assessment (COHA) Update. Current and near-future Major Tasks Visibility trends analysis Assess meteorological representativeness of 2002.
Draft, 2 June NATURAL HAZE LEVELS SENSITIVITY ASSESSMENT 1. Project Overview Ivar Tombach Regional Haze Data Analysis Workshop 8 June 2005.
1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Santa Fe December 2006 Update on Regional Haze 308 SIP Template.
AoH Phase 2 and TSS Project Update WRAP Technical Analysis Forum Las Vegas, NV February 6, 2007.
Technical Projects Update WRAP Board Meeting Salt Lake City, UT November 10, 2004.
AoH Conference Call August 10, 2004 Air Resource Specialists, Inc.
TSS Database Inventory. CIRA has… Received and imported the 2002 and 2018 modeling data Decided to initially store only IMPROVE site-specific data Decided.
1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Portland August 2006 Suggested Changes to IWG Section 308 SIP Template.
Weight of Evidence Discussion AoH Meeting – Tempe, AZ November 16/17, 2005.
Implementation Workgroup Meeting December 6, 2006 Attribution of Haze Workgroup’s Monitoring Metrics Document Status: 1)2018 Visibility Projections – Alternative.
TSS Project Update WRAP Technical Analysis Forum Boise, ID May 22, 2007.
Attribution of Haze Report Update and Web Site Tutorial Implementation Work Group Meeting March 8, 2005 Joe Adlhoch Air Resource Specialists, Inc.
Ambient Monitoring & Reporting Forum Plans for 2005 Prepared by Marc Pitchford for the WRAP Planning Team Meeting (3/9 – 3/10/05)
Attribution of Haze Project Inter-RPO Modeling Discussion Group May 25-26, 2004 Denver, CO.
WRAP Activities Overview §308 Technical Work Outline June 3, 2003.
Technical Support System Review Board Meeting March 8, 2007.
AoH Work Group Weight of Evidence Framework WRAP Meeting – Tucson, AZ January 10/11, 2006 Joe Adlhoch - Air Resource Specialists, Inc.
Sample TSS Pages AoH Meeting – Tempe, AZ November 16/17, 2005.
308 Outline (a) Purpose (b) When are 1st plans due (c) Options for regional planning (d) Core requirements (e) BART requirements (f) Comprehensive periodic.
Sulfate Discussion WRAP Meeting – Tucson, AZ January 10/11, 2006 Joe Adlhoch - Air Resource Specialists, Inc.
Attribution of Haze Phase 2 and Technical Support System Project Update Combined Session – Emissions and Fire Emissions Joint Forums – Missoula, MT September.
Attribution of Haze Project Update Fire Emissions Joint Forum Meeting September 8-9, 2004 Worley, ID.
Key Findings from May & July 2008 WRAP Technical Workshops September 30, 2008 Steve Arnold, Colorado DPHE & Bob Kotchenruther, EPA R10 (Co-Chairs, WRAP.
Weight of Evidence Approach: Soil and Coarse Mass Case Studies WRAP Workshop on Fire, Carbon, and Dust May 24, 2006 Joe Adlhoch - Air Resource Specialists,
Nitrate Discussion WRAP Meeting – Tucson, AZ January 10/11, 2006 Joe Adlhoch - Air Resource Specialists, Inc.
TSS Scoping Study Results AoH Meeting – Tempe, AZ November 16/17, 2005.
Shawn McClure, Rodger Ames and Doug Fox - CIRA
Phase I Attribution of Haze Overview (Geographic Attribution for the Implementation of the Regional Haze Rule) or (an experiment in weight-of evidence)
AoH Phase 2 Update AoH Meeting – San Diego, CA January 25, 2006
Tom Moore (WESTAR and WRAP) and Pat Brewer (NPS ARD)
Adjusting the Regional Haze Glide path using Monitoring and Modeling Data Trends Natural Conditions International Anthropogenic Contributions.
WRAP Regional Haze Grant Status, Technical Project Priorities, & Proposed Technical Analysis Forum Tom Moore WRAP Technical Coordinator Attribution.
Western Regional Haze Planning and
TSS Project Update Attribution of Haze Workgroup/
AoH Conference Call August 24, 2004
Air Resource Specialists, Inc. July 23, 2004
AoH Conference Call September 7, 2004
Regional Haze SIP Status Report
Summary of RH-LTS Requirements (d)(3)
TSS Data Documentation (2)
Fire Emissions Joint Forum February 9, 2005
AoH Conference Call August 24, 2004
Joe Adlhoch - Air Resource Specialists, Inc.
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Presentation transcript:

Attribution of Haze Phase 2 and Technical Support System Project Update AoH Meeting – San Francisco, CA September 14/15, 2005 Joe Adlhoch - Air Resource Specialists, Inc.

Overview AoH Phase 2/TSS work plan AoH Phase 2/TSS work plan Review of data summary products and suggested modifications for Phase 2 Review of data summary products and suggested modifications for Phase 2 IWG input from August meeting IWG input from August meeting TSS scoping study TSS scoping study Weight of evidence approach Weight of evidence approach Critical milestones Critical milestones

Goals of the AoH Phase 2 Analysis Refine Phase 1 techniques for use in Phase 2. Refine Phase 1 techniques for use in Phase 2. Reduce uncertainty and address the remaining uncertainty in modeled data and attribution results. Reduce uncertainty and address the remaining uncertainty in modeled data and attribution results. Analyze the differences between modeled results for 2002 and the projected 2018 base case and various other control strategy scenarios. Analyze the differences between modeled results for 2002 and the projected 2018 base case and various other control strategy scenarios. Develop additional analytical approaches (e.g., receptor modeling, trends analysis, determination of the representativeness of baseline data set). Develop additional analytical approaches (e.g., receptor modeling, trends analysis, determination of the representativeness of baseline data set).

Goals of the AoH Phase 2 TSS Project Provide a single web-based location for access and display of technical data, display of analytical results, and the reference location for related documentation to support the regional haze implementation plans. Provide a single web-based location for access and display of technical data, display of analytical results, and the reference location for related documentation to support the regional haze implementation plans. Provide specific analysis tools to synthesize technical and contextual data and GIS layers, conduct analyses, and store results for subregional/local/Class I area- specific regional haze planning. Provide specific analysis tools to synthesize technical and contextual data and GIS layers, conduct analyses, and store results for subregional/local/Class I area- specific regional haze planning. Provide the analysis and display tools for Phase 2 analyses, and the technical support documentation for WRAP region SIPs and TIPs for regional haze. Provide the analysis and display tools for Phase 2 analyses, and the technical support documentation for WRAP region SIPs and TIPs for regional haze.

Team Members and Responsibilities

Work Plan Tasks – Analysis Project Task 1: Solicit and define user requirements from the appropriate WRAP work groups. Task 1: Solicit and define user requirements from the appropriate WRAP work groups. Task 2: Prepare suite of data products based on final 2002 emissions, modeling, and attribution results. Task 2: Prepare suite of data products based on final 2002 emissions, modeling, and attribution results. Task 3: Define the weight of evidence (WOE) approach to be applied to AoH Phase 2 data. Task 3: Define the weight of evidence (WOE) approach to be applied to AoH Phase 2 data. Task 4: Interpret 2018 results and implications for showing progress under the Regional Haze Rule. Task 4: Interpret 2018 results and implications for showing progress under the Regional Haze Rule. Task 5: Prepare draft and final AoH Phase 2 analysis report. Task 5: Prepare draft and final AoH Phase 2 analysis report. (Task 11: Travel to provide progress reports and solicit project feedback at WRAP meetings.) (Task 11: Travel to provide progress reports and solicit project feedback at WRAP meetings.)

Work Plan Tasks – TSS Project Task 6: Perform TSS requirements analysis and scoping study. Task 6: Perform TSS requirements analysis and scoping study. Task 7a: Acquire and prepare the relevant databases. Task 7a: Acquire and prepare the relevant databases. Task 7b: Summarize and evaluate WRAP Dust inventory. Task 7b: Summarize and evaluate WRAP Dust inventory. Task 8: Develop data review interfaces based on user requirements. Task 8: Develop data review interfaces based on user requirements. Task 9: Develop data exchange protocols and guidelines. Task 9: Develop data exchange protocols and guidelines. Task 10: Develop method to capture on-line user feedback. Task 10: Develop method to capture on-line user feedback. Task 11: Travel to provide progress reports and solicit project feedback at WRAP meetings. Task 11: Travel to provide progress reports and solicit project feedback at WRAP meetings.

Project Timing by Task

TSS Data Summary Products Emissions, monitoring, modeling, and attribution results will be housed in on-line databases Emissions, monitoring, modeling, and attribution results will be housed in on-line databases User requests will combine data with contextual information and/or GIS layers (if appropriate) User requests will combine data with contextual information and/or GIS layers (if appropriate) ARS and AoH work group will develop a Weight of Evidence (WOE) approach for integrating results ARS and AoH work group will develop a Weight of Evidence (WOE) approach for integrating results Scoping study (Task 6) will determine the level of sophistication achievable for data products during project Scoping study (Task 6) will determine the level of sophistication achievable for data products during project All data used for 2007 SIPS/TIPS will be version controlled to keep it separate from new data and information added to the TSS over time All data used for 2007 SIPS/TIPS will be version controlled to keep it separate from new data and information added to the TSS over time

Draft TSS Home Page

Emissions Data Use EDMS as data source Use EDMS as data source Summary of emissions data will be available by source type, point, county, and grid cell Summary of emissions data will be available by source type, point, county, and grid cell Provide summaries of projected changes in emissions from 2002 to 2018 Provide summaries of projected changes in emissions from 2002 to 2018 Include GIS information Include GIS information

Monitoring/Modeling Data Display visibility based on monitoring or modeling results Display visibility based on monitoring or modeling results Include RHR and other monitoring data sets Include RHR and other monitoring data sets Tie in baseline and glide path results Tie in baseline and glide path results Include GIS information Include GIS information

Attribution Data Attribution results will include: PSAT, TRA, PMF Attribution results will include: PSAT, TRA, PMF Integrate results with EIs Integrate results with EIs Provide more results with map products than in Phase 1 Provide more results with map products than in Phase 1 Review attribution groupings Review attribution groupings

Supporting Data Assess what supporting data is needed for SIP/TIP preparation and WOE Assess what supporting data is needed for SIP/TIP preparation and WOE Regional assessments included in Phase 1? Regional assessments included in Phase 1? Back trajectory summaries? Back trajectory summaries? Integrate with GIS data? Integrate with GIS data? Links to data web sites Links to data web sites

New Data Summary Products Presentation of control strategies – may be descriptive text with bar charts showing anticipated reductions Presentation of control strategies – may be descriptive text with bar charts showing anticipated reductions Projected 2018 emissions, visibility, modeling, and attribution results – will be able display just like 2002 results; will also include display of changes Projected 2018 emissions, visibility, modeling, and attribution results – will be able display just like 2002 results; will also include display of changes Historical trend and future glide slope analyses – may include multiple data sets (RHR, “raw”) and extinction equations (current and proposed) – both VIEWS and COHA projects working on versions of these products Historical trend and future glide slope analyses – may include multiple data sets (RHR, “raw”) and extinction equations (current and proposed) – both VIEWS and COHA projects working on versions of these products Weight of evidence approach Weight of evidence approach Ability for users to add data/GIS layers/analyses to TSS Ability for users to add data/GIS layers/analyses to TSS

IWG SIP Outline Revised SIP outline developed at August meeting Revised SIP outline developed at August meeting Items in red are directly supportable by TSS and are required products of TSS Items in red are directly supportable by TSS and are required products of TSS Each of these items exists from Phase 1 or is planned for the TSS Each of these items exists from Phase 1 or is planned for the TSS

IWG Flow Chart for Uniform Rate of Progress

TSS Scoping Study Outline Identify, understand, and refine the user/system requirements Identify, understand, and refine the user/system requirements Match products types with user needs (e.g., SIP outline) Match products types with user needs (e.g., SIP outline) Identify a set of case studies that illustrate the system’s use Identify a set of case studies that illustrate the system’s use Explore the architectural options Explore the architectural options Select and evaluate a candidate architecture (feasibility, available expertise) Select and evaluate a candidate architecture (feasibility, available expertise) Revisit system requirements – changes needed? Revisit system requirements – changes needed? Finalize selection: create set of documents and diagrams that describe system architecture, team member roles Finalize selection: create set of documents and diagrams that describe system architecture, team member roles Generate a detailed project plan Generate a detailed project plan What is feasible with available time/funds? What is feasible with available time/funds? What cannot be done at this time? What cannot be done at this time? Minimum requirement: MUST support SIP preparation Minimum requirement: MUST support SIP preparation

TSS Scoping Study Schedule Scoping study (task 6) must be completed before most of the remaining TSS tasks (7-10) can be started Scoping study (task 6) must be completed before most of the remaining TSS tasks (7-10) can be started Expected completion: November 2005 Expected completion: November 2005 AoH work group will receive a detailed update at November meeting AoH work group will receive a detailed update at November meeting

Weight of Evidence Approach Recipe for assessment of reasonable progress: Recipe for assessment of reasonable progress: Comparison between baseline and 2018 base case Comparison between baseline and 2018 base case Review alternate methods of calculating baseline (exclude fire, etc.?) Review alternate methods of calculating baseline (exclude fire, etc.?) Review of alternate 2018 control scenarios Review of alternate 2018 control scenarios Justification of why a site does or does not show reasonable progress Justification of why a site does or does not show reasonable progress Checklist containing each products type: Checklist containing each products type: Succinct description of what information product displays Succinct description of what information product displays Relative uncertainty of each product Relative uncertainty of each product Relative importance or weight of each product Relative importance or weight of each product Assessment of how well various analyses “agree”: Assessment of how well various analyses “agree”: Do all attribution methods tend toward similar results? Do all attribution methods tend toward similar results? Do EIs combined with back trajectory analyses support attribution results? Do EIs combined with back trajectory analyses support attribution results? Do changes in EIs support reasonable rate of progress demonstration? Do changes in EIs support reasonable rate of progress demonstration? Prepare tutorial for users – several case studies which require somewhat different approaches Prepare tutorial for users – several case studies which require somewhat different approaches

Weight of Evidence Approach (Recap of Ralph’s slide) Glide paths and modeled RPG test (EPA) Glide paths and modeled RPG test (EPA) Eliminate days dominated by “natural” events in modeled RPG test (e.g., fires, dust) Eliminate days dominated by “natural” events in modeled RPG test (e.g., fires, dust) 2018 projections for species dominated by anthropogenic emissions (e.g., SO4, NO3) 2018 projections for species dominated by anthropogenic emissions (e.g., SO4, NO3) 2018 projections for modeled worst visibility days, worst sulfate days, etc projections for modeled worst visibility days, worst sulfate days, etc. Other??? Other???

Review of AoH Project Schedule Phase 2 Report