 Very light activity nationally currently, however potential increasing in southern tier  Three airtankers on duty (1 – Sops, 2 – SW)  No other national.

Slides:



Advertisements
Similar presentations
Aviation Update Aaron Schoolcraft PNW/AK Regional Aviation Officer
Advertisements

Incident Replacement Reference Material: – IIBMH – Interagency Incident Business Management Handbook (Chapter 30) –
Update prepared for Deans’ Council June 14, 2012.
Standard Operating Procedures – Case Management
Forest Service Aviation Program Overview Last (5 th) Year of commercial Airtanker Contract in 2012 EIS study and use of fire chemicals – guidance in place.
PREPARING FOR AN AUDIT Presented by Chris Ray Partner - KPMG LLP Presented by Chris Ray Partner - KPMG LLP.
Aviation Update 2015 Aaron Schoolcraft AK/PNW Assistant Fire Director, Aviation Office: Cell: Kurt Kleiner BLM OR/WA State Aviation.
NICC Overview National Interagency Coordination Center NIFC Boise, ID.
Cooperative Agreements “Suppression”
Slide 2-1 Aircraft Unit 2. Slide 2-2 Unit 2 Objectives 1.Describe the interaction of the EDSD as it relates to the aircraft function. 2.Identify the difference.
Division Chief, Aviation John Gould Deputy Division Chief, Aviation Brad Gibbs Flight Operations Manager Rusty Warbis Air Tactical Pilots ATGS Program.
Hurricane Resources Mobilized Hurricane Resources Mobilized: Between July and December, the following resources were mobilized for Dennis, Ophelia,
This document is contained within the Fire Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest,
NATIONAL INTERAGENCY FIRE CENTER NIICD 2012 Northern Rockies Dispatcher Workshop March, 2012 Jose M. Lopez.
1 S ERVICE · A CCOUNTABILITY · V ALUE · E FFICIENCY.
State Assessment Accommodations The Role of School Assessment Coordinator Documentation & Decisions Office of Planning & Assessment Boulder Valley School.
National Contracting Updates. CURRENT STAFF Susan Prentiss – Branch Chief Melinda Draper – Contracting Officer Frank Gomez – Contracting Officer Mark.
Radio Communication Problems in 2005 Related to Narrow Banding, and Resulting NMAC Strategy Martin Maricle AK-Division of Forestry Originally presented.
Slide 7-1 Unit 7 Slide 7-1. Slide 7-2 Unit 7 Objectives 1.Mobilize, reassign, and demobilize equipment in a safe and cost effective manner. 2.Determine.
Ground Support Unit. Serco Update Serco contractors do not leave R-5 Serco work hours- Minimum 14 Hrs Maximum 16 Hrs Parts ordering done by D.G.R. Ordered.
CHAPTER LEADERSHIP TRACK APSE Team Support-How Best to Utilize as a Chapter Leader.
PAST PERFORMANCE Conference Theresa Kinney. 2 2 Agenda  Past Performance Categories  Past Performance Matrix  Rating Measurements  Website  Feedback.
NIROPS Overview for Dispatchers Tom Mellin – National IR Program Manager and SW GACC IR Liaison.
National Logistics Workshop March 1,  Added Language Appropriate uses to meet all hazard situations Added all hazard positions to position matrix.
Two Heads are Better Than One Patrick Callahan, Snyder & Associates Handouts and presentation are available online at
LESSONS LEARNED 2005 NATIONAL INCIDENT COMMANDER/AREA COMMANDER AFTER ACTION REVIEWS.
Southwest Coordination Center Update. Kenan Jaycox – Center Manager Vacant – Asst Center Manager – Job to fly early in 2011 Will take over IMT Coordination.
NIROPS Update: The NIFC National Infrared Program strives to provide the best possible imagery for the widest applications The aircraft platforms.
AIRTANKER BASE MANAGER (ATBM).
1 The Geographic Information System Standard Operating Procedures on Incident Project (GSTOP) Sue McLellan Florida Division of Forestry.
Agricultural Careers Forest Ranger By: Dr. Frank Flanders and Trisha Rae Stephens Georgia Agricultural Education Curriculum Office Georgia Department of.
Slide 4-1 Unit 4 Slide 4-1. Slide 4-2 Unit 4 Objectives 1.Mobilize, reassign and demobilize overhead resources in a safe and cost effective manner. 2.Describe.
Unit 2 - Infrared Interpreter Position Overview. Introduction: Unit Objectives By the end of this unit, the students will be able to: Explain what is.
Lead from the front Texas Nodal 1 ERCOT Nodal Program Facilities Draft Request January 22, 2007.
Intro: On a day to day basis when new incidents arise, we generally have the capability to handle them with resources within our unit. We trust when.
USFS Aviation Program 5 th Year of Legacy (P2V) Airtanker Contract EIS study and use of fire chemicals Larger AT strategy to OMB -> Congress Evaluation.
Nurture My Child Tutorial Steps to Creating & Using a Business Account This tutorial has been created for businesses. It gives you a step-by-step procedure.
ROSS Version /15/ ROSSA-EP UNIT 5 RESOURCE MANAGEMENT.
 Updated the NMAC organization chart to reflect membership changes; USFS representative is Steve Gage and NMAC Group Coordinator is Susie Stingley-Russell.
Incident Based Automation Project Update Logistics Meeting March 16, 2005.
1B-01-P310-EP. Objective Explain the roles, mobilization, and utilization of Fire Prevention Education Teams 1B-02-P310-EP.
PUEBLO INTERAGENCY DISPATCH CENTER (PIDC) 2008 ANNUAL REPORT.
HMIS and PSH: Receiving Referrals from the One List Ending Veteran Homelessness Initiative.
2014 FALT Aviation Update Stevenson, WA November 2014 Dave Glose USFS AK/PNW Helicopter Program Manager Office: Cell:
HOT-LOADING SAFETY TRAINING FOR THE NEPTUNE BAE 146.
Finance Webinar May 12, National Incident Business Update  2014 AD Pay Plan – 1% pay rate increases; added position classifications for 11 positions;
© Thomson/South-Western ECONOMIC EDUCATION FOR CONSUMERS Slide 1 Chapter 4 LESSON 4.5 Prepare for the Future GOALS  Explain why it is important to perform.
FS R-6/BLM-OR/WA Buying Teams Buying Teams/Ad-Hoc Buying Teams Some Agency Differences Purchases of Medications AD Travel Fire Retardant orders (for aerial.
To Join Webinar: Dial-In: /
2012 Texas Assessment Conference Test Administration Team Student Assessment Division Texas Education Agency Test Administration and Security Update.
BOD1 HQ Update 8/19/11. Website Audiences Collegiate Members Professional Members Collegiate Non-Members Professional Non-Members Academic Community (Higher.
Pueblo Interagency Dispatch Center Pueblo Interagency Dispatch Center 2015 Annual Report.
National Infrared Operations Tom Mellin National Infrared Program Manager February 10, 2016 Intermediate GISS.
Accommodations State Assessment Accommodations
NWSA Conference February, 2012.
Partnerships Northern Rockies
MBA LIHTC Committee Update
NATIONAL INTERAGENCY LOGISTICS WORKSHOP Forest Service Update 2008
ANNUAL AUDIT RISK ASSESSMENT & WORK PLAN
Accommodations State Assessment Accommodations
Project Expense Flow Chart
2018 SOUTHWEST/SOUTHEAST REGION LEADERSHIP CONFERENCE
2018 SOUTHWEST/SOUTHEAST REGION LEADERSHIP CONFERENCE
ETools Update Tim Dempsey Systems Chief, Office of Acquisition Management (QV) June 9, 2014.
Transportation and Vehicle Rentals
Employee Spotlight Each week the Customer Care Center receives multiple requests for support and help. Many times customers send their appreciation to.
How to Do Business with Lansing Community College
VPPPA Region 1 OSHA Region 1 VPP.
Philip Linse, CenturyLink
Presentation transcript:

 Very light activity nationally currently, however potential increasing in southern tier  Three airtankers on duty (1 – Sops, 2 – SW)  No other national resources committed currently  NICC has been processing miscellaneous overhead requests in support of SA Rx projects

Chapter 20  Changed gallons on airtanker typing to reflect contract language  Updated language for what the FS will provide if MAFFs is activated by a governor  Added updated extension form to reflex no GACC requirements for overhead extensions.

Chapter 30  Updated the names on the NMAC chart to reflect current membership

Chapter 60  Changed number of smokejumpers nationally to reflect current numbers by base  Added additional Buying team to SA  Removed crew chart from guide. Chart is located in Red Book and Blue Book (reduce duplication)  Added language to reflect IMT availability when CG is not available.

 Current contract can be extended thru June (eight airtankers)  Two VLATs on CWN contract (both DC-10)  Option of ordering AK State & Canadian ATs

 Legacy contract will solicit for up to eight T2 ATs  Next Gen contract (T1, 3000 gallons, 300 knots) will solicit for up to seven ATs  Examples of Next Gen: MD-87, BAE-146, RJ85, C-130

 69 SEATs on On-Call (CWN) contract  Exclusive Use contracts: BLM 11(2 in MLS), BIA 4 (1 in 7S0), ID (1ea. in COE and GIC) & CO states.  Two CL-215s on 180 day Exclusive Use Contract beginning mid-May, shared between EA, AK, NW and SOps.

 ASM/LPs:  BLM: 4 ASMs plus an extra aircraft  FS: 14 about ½ of which are ASM  2 ea. IR aircraft  Large Tran: FS contract w/ Sierra Pacific; NICC can charter as needed for large tran to augment

 30 – Type 1 EXC (FS large fire support)  33 – Type 2 EXC Standard Category (FS)  9 – Type 2 EXC Standard Category (BLM)  1 – Type 2 EXC Standard (NPS)  198 CWN  87 Type 1  57 Type 2 Standard Category  54 Type 2 Restricted Category

 Caterer and Shower contracts, requirements and ordering procedures remain the same as  30 Caterer locations between 18 vendors  35 shower locations between 24 vendors (8 of which also have small units, which vary in size from 4 to 11 stalls)

 Southern Area has added one national Buying Team (Taylor)  Northern Rockies has dropped one Buying Team (Schilz)

 Outreach has circulated for FS Assistant position  Fire Weather Assistant Program Manager position is being reclassified as FS position and expected to be advertised in the next few months  Intelligence Officer position (FS) is being reclassified to maintain intel career ladder  Interviewed last week for 1039 positions (4+, all BLM)

Questions or Comments? Thank You!