1 ATS Evaluation Programs The Federal Aviation Administration Presented By: Rick Baker.

Slides:



Advertisements
Similar presentations
Job Hazard Analysis I. Speaker’s Notes:
Advertisements

MONITORING OF SUBGRANTEES
Normal Operations Data: Air Traffic Facility Evaluations and NOSS
1 Air Traffic Quality Assurance Program The Federal Aviation Administration Presented By: Gary D. Romero.
1 ATS Incidents Reporting and Investigation Teams The Federal Aviation Administration Presented By: Rick Baker.
1 ATS Evaluation Programs The Federal Aviation Administration Presented By: Gary Romero.
Quality Management Branch Cady Clark, MSN, RN Branch Manager Claudia Himes-Crayton, BSN, RN Patricia Palm, MS, RNC Nurse Consultants.
Software Quality Assurance Plan
Presented to: By: Date: Federal Aviation Administration Safety Management System (SMS) at Airports : Principles APEC TPT-WG AEG-SAF Jim White, Deputy Director.
Critical Infrastructure Protection and Continuity of Operations A Look at Asset Protection in the Airport Environment May 1, 2013.
EPA Regions 9 & 10 and The Federal Network for Sustainability 2005
1 ATS Incidents Reporting and Investigation Teams The Federal Aviation Administration Presented By: Rick Baker.
More CMM Part Two : Details.
Internal EMS Auditing at Naval Installations. 2 Title/Group/Section,etc. Navy EMS Overview  All “appropriate facilities” must implement an EMS that conforms.
National Association of Student Financial Aid Administrators © NASFAA 2011 The following is prepared for presentation at the WASFAA Conference April 17.
PROCESS AND PRODUCT QUALITY ASSURANCE
1 USAID/Peru Risk Assessment In-Briefing February 19, 1999 PRIME Principal Resource for Information Management Enterprise-wide USAID PRIME.
President Vice President Accounts Asst. VP Savings Asst. VP Checking Asst. VP Mktg Vice President Commercial Accounts Asst. VP Loans Asst. VP Services.
AUDITS AND INSPECTIONS
FPSC Safety, LLC ISO AUDIT.
Runway Safety Teams (RSTs) Description and Processes Session 5 Presentation 1.
Special Ed. Administrator’s Academy, September 24, 2013 Monitoring and Program Effectiveness.
SAFETY AUDIT. 2.1 Definition of audit. Critical systematic inspection of an organization‘s activities in order to minimize losses due to accidents.
Safety Management Strategies for Extended Care Facilities.
RST processes Session 6 Presentation 3. A framework for RST processes Establishing an RST Membership Terms of reference Work programme (schedule, agenda,
Preparing for an oepa audit
PRIME Principal Resource for Information Management Enterprise-wide USAID PRIME 1 USAID/Peru Risk Assessment In-Briefing February 19, 1999 PRIME Principal.
Performance Auditing at PPS: Guidelines and Success Factors Richard C. Tracy District Performance Auditor April 16, 2007.
1 Effective Safety & Health Assessments: Audits and Inspections Disclaimer: These safety materials, resources and PowerPoint ® presentations are not intended.
The Implementation of Aviation Safety Management System in Taipei FIR Ms Chia-CHi Liu Chinese Taipei.
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
E nvironmental P erformance R eview - A udit. 2 DELPHI CONFIDENCIAL/CONFIDENTIAL Agenda u Introductions and Plant Safety Orientation u Organization Chart.
Slide 1 D2.TCS.CL5.04. Subject Elements This unit comprises five Elements: 1.Define the need for tourism product research 2.Develop the research to be.
Improving Quality and Reducing Risks Positive and Powerful Quality Assessment.
U.S. General Services Administration Office of Governmentwide Policy OFFICE OF TRAVEL, TRANSPORTATION, AND ASSET MANAGEMENT (MT), CENTER FOR POLICY EVALUATION.
Michelle Groy Johnson Quality Improvement Officer Research Integrity Office Tough Love: Understanding the Purpose and Processes of Quality Assurance.
University of Idaho Successful External Program Review Archie George, Director Institutional Research and Assessment Jane Baillargeon, Assistant Director.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
1 DRAFT Monitoring/Evaluation Overview September 20, 2010 Title III Director’s Fall Meeting.
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Job Hazard Analysis.
1 Implementing a Business Management System compliant to ISO 9001:2000.
Developing an In-House Air Quality Audit Program March 22, 2006 Judy B. Yorke Yorke Engineering, LLC x25
Facilities Information Management System (FIMS) Data Validation Inbrief program Facilities site name date.
1 NCLB Title Program Monitoring NCLB Title Program Monitoring Regional Training SPRING 2006.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
Presented to: By: Date: Federal Aviation Administration How to Survive a Property Audit using the 5 “W” Approach NPMA NES Mrs. Beth Leykamm and Mr. Frankie.
Acquisition and Assistance Management Review Entrance Briefing Name of office reviewed Date of Review.
Governor’s Office for Technology Service Level Management Overview Office of Policy & Customer Relations September 21, 2001 Governor’s Office for Technology.
U.S. General Services Administration Office of Governmentwide Policy Center for Policy Compliance and Evaluation.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
INTERNAL AUDITS A Management Tool
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Responsibility through Decentralisation
Audit of <insert title and audit #>
SAFETY OBSERVATIONS Record observations of safe or at-risk behaviors or conditions using customized data-entry forms and track feedback Standardize risk.
Audit of <insert title and audit #>
Grants Management 101 Part A
RST processes Session 5 Presentation 2.
The Federal Aviation Administration Presented By: Rick Baker
Air Traffic Quality Assurance Program
The Federal Aviation Administration Presented By: Rick Baker
The Federal Aviation Administration Presented By: Gary Romero
The Federal Aviation Administration Presented By: Rick Baker
ICAO SAFETY INITIATIVES Certification of Aerodromes
Special Ed. Administrator’s Academy, September 24, 2013
Aerodrome Certification Workshop
Presentation transcript:

1 ATS Evaluation Programs The Federal Aviation Administration Presented By: Rick Baker

2 ATS Evaluation Programs n What is the purpose of an evaluation? n How is an evaluation conducted? n Evaluation Findings? n What does an ATS Unit do with an evaluation?

3 What is the purpose of an evaluation? n Maintain the highest level of service n Standardization

4 How is an evaluation conducted? n Before the evaluation… n During the evaluation… n After the evaluation…

5 How is an evaluation conducted? n Before the evaluation… –Notification –Evaluation Packages

6 How is an evaluation conducted? n During the evaluation… –Inbriefing –Evaluating »Checklist »Ratings »Is it a problem? –Daily Briefing –Draft Report –Outbriefing

7 How is an evaluation conducted? n Evaluating –Operational monitoring »Evaluators plug-in with controllers »Typical monitor times range from hours, depending on facility size »Adherence to procedures »Safe and efficient operating practices »Observe operational oversight »Discuss observations at evaluation team meeting to determine trends

8 How is an evaluation conducted? n Evaluating –Procedures Review »Are procedures in compliance with regulations? »Do procedures promote safe and efficient movement of aircraft? »Are procedures current? »Are the procedures being used? »Do controllers understand procedures?

9 How is an evaluation conducted? n Evaluating –Personnel Interviews »Can highlight problem areas in a facility »Can be validated through research »Can be an indicator of employees’ commitment to the ATS mission –Customer Feedback »Contact air carrier, military and general aviation users »Contact nearby ATS facilities »Solicit feedback on quality of service

10 How is an evaluation conducted? n After the evaluation… –Outbriefing »Brief on evaluation findings »Discuss recommendations for correction »Discuss target dates for corrective action »Present ATS Unit Manager with critiquecritique –Final Report »Formal presentation of evaluation findings »Report Format n Sample Report Sample Report »Due 30 days after outbriefing

11 Evaluation Findings n Satisfactory n Unsatisfactory n Not Applicable n Not Observed n Not Rated n Tracking Control Numbers

12 Evaluation Findings n Tracking Control Numbers 00-A-XXXX-01U-FE “00” last two digits of year of evaluation “A” type of ATS unit A = En-route (ACC) T = Approach (APP) and Aerodrome Control Tower F = FIC, AFIS, etc. “XXXX” ATS unit identification “01U” item tracking control number and rating U = Unsatisfactory “FE” type of evaluation conducted FE = Full unit ATS evaluation DA = Desk audit FU = Follow-up evaluation SP = Special evaluation

13 What does an ATS Unit do with an evaluation? n Listen n Respond –Required for all unsatisfactory ratings »Action Plan »First Response »Second Response –Problem correction mandated within a predefined time limit

14