CAM in Ohio Title V Permits Andrew Hall, Ohio EPA CAM/GHG Training August 22, 2011.

Slides:



Advertisements
Similar presentations
Cathy Beahm Technical Assistance Specialist NH DES, Air Resources
Advertisements

METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
DRAFT IRON & STEEL FOUNDRY MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART EEEEE.
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
Compliance Dates The final rule was published on January 25, 1995,
Harmonization of Part 60 and Part 75 CEM Requirements Robert Vollaro
Update on Regional Haze November 15, 2012 Michele Notarianni EPA Region 4 1.
Public Review vs “affected state” Review: advantages of TAS for section 505 Reviewing NSR and Title V Permits Natalene Cummings Forest County Potawatomi.
1 Katy R. Forney Energy Sector Technical Authority Air Permits Section EPA Region 4 PSD and Title V Greenhouse Gas Tailoring Rule 14 th Annual Power Generation.
State Implementation of Risk-Based MACT Exemptions Region 4 Permit Managers Meeting Rhonda B. Thompson, P.E., Director Engineering Services Division SC.
Boiler MACT and Other Air Developments 2011 Southern Section AWMA Conference Callaway Gardens, GA Boiler MACT and Other Air Developments 2011 Southern.
April 15, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
What options do states have? What is Georgia planning to do? What are some of the other states doing? What are the possible implications to permit fees?
1 National Association of Clean Air Agencies Spring Membership Meeting 2008 Steve Page, Director Office of Air Quality Planning and Standards (OAQPS) Office.
NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) Permitting.
NCMA Workshop March 19 and 24, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
Title V Site Operating Permits (SOPs)
Air Permitting Overview.
Compliance Update NCMA 2015.
Trademark FAQ. If I am a student or from a department of the University of Texas of the Permian Basin, do I need to ask permission to use a trademark?
Portfolio Manager ® 301. Learning Objectives In this session, you will learn about some advanced features of EPA’s ENERGY STAR Portfolio Manager tool:
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
1 Improving Environmental Protection and Reducing Administrative Burden North Carolina Division of Air Quality Improving Environmental Protection and Reducing.
Delivering sustainable solutions in a more competitive world GHG Mandatory Reporting Rule – Implications for PSD Review for GHG September 2012 Ramesh Narasimhan.
ETD Submission Process Fall 2011 Valerie Emerson ETD Administrator, Gelman Library / (202)
Copyright CovalentWorks Training Guide for Invoices MYB2B Powered by CovalentWorks.
Where to find Information About Facilities. Overview of Title V Permits.
Ole Miss Today An integrated, campus-wide announcement system.
Guidance on Establishing Monitoring to Comply with CAM and Other Title V Requirements A Summary of Technical and Policy Materials Barrett Parker, EPA,
CDC Bylaws Requirements Published March 21, CFR
Mississippi Air Update Mississippi Dept. of Environmental Quality September 12, 2012.
| Philadelphia | Atlanta | Houston | Washington DC Boiler MACT Compliance Plans: Failure to Develop Plans Is Planning to Fail Susie Bowden|
Navajo Nation Operating Permit Program
Summary of Rulemaking in California for the Forensic Alcohol Laboratories Regulation Review Committee Cathy L. Ruebusch, RN, MSN Office of Regulations.
Sourcing Event Guide Updated September 12, 2011 Sourcing Event Guide.
Title V: The Big Picture
SCAQMD Air Quality Permitting for Emerging Technologies Jay Chen, P.E. South Coast Air Quality Management District November 4, 2009 Southern California.
Compliance Assurance and Title V Monitoring A Summary of Rules and Permitting Issues Peter Westlin, EPA, OAQPS.
Best Available Retrofit Technology Rule - Colorado David R. Ouimette Colorado Air Pollution Control Division.
Georgia’s 112(g) Experiences Eric Cornwell Acting Manager Permitting Program.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
REGULATIONS & LEGISLATION BIG TEN ENVIRONMENTAL STEWARDSHIP GROUP STEVE MARUSZEWSKI – PENN STATE Greenhouse Gases.
Introduction to Session II: Incorporating Existing Data into the EDSP Erik R. Janus Director, Human Health Policy CropLife America.
New Source Review Rules Update Jessica Montanez U.S. Environmental Protection Agency Office of Air Quality Planning and Standards Air Quality Policy Division.
Title V, Preliminary Completeness Review. What do I need to do?  I need to find out if the application contains the required information.  Initial Title.
Effective Title V Permits Scott Miller U.S. EPA Region 4 (404)
Title V Review DJ Law US EPA Region 8.
Update on Methane Regulations Affecting Landfills Pat Sullivan Senior Vice President SCS Engineers Nov. 10, 2015.
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
Coordinating Permitting and Enforcement Nebraska’s Experiences David A Graiver Environmental Engineer NDEQ: Air Quality June 15, 2011.
Atrezzo Provider Portal Inpatient Case Creation July 2015 INTEGRATED CARE MANAGEMENT AND QUALITY IMPROVEMENT 1.
1 MDEQ Air Division Air Update August 6, Mississippi Update Ozone PM2.5 Lead Regional Haze CAIR, CAMR Vacatur Boiler MACT Vacatur Area Source.
AWMA – Georgia Chapter Air Permitting Update May 1, 2014 Eric Cornwell Stationary Source Permitting Program.
Title V – Increasing Efficiency Lori Hanson, Title V Operating Permit Section Supervisor.
Title V Site Operating Permits (SOPs) Initial, Revision, and Renewal Applications Vasant Chaphekar, P.E. & Carolyn Maus, P.E. Air Permits Division Texas.
Tailoring Rule - Title V Scenarios July 20, 2010 Katherine N. Blue Principal Consultant, Climate Change Services trinityconsultants.com Troutman Sanders/Trinity.
MyCLSS v.2 Critical Issues and Amend Checklist. Critical Issue After receiving final returns, SGB staff will perform a review according to a list of critical.
1 Update on New Source Review (NSR) Activities and Priorities for Information Transfer and Program Integration Division April 7, 2004.
Welcome to Workforce 3 One U.S. Department of Labor Employment and Training Administration Webinar Date: November 3, 2015 Presented by: Office of Grants.
Topics Graduation and End of Term or Course
C&T Rule Implementation
AWMA Georgia Chapter Regulatory Conference
Boiler Sheltered Initiative
Georgia Public Library Service
Georgia Public Library Service
Kansas Air Quality Seminar March 5, 2008
Air Quality Committee May 13, 2015
Student Organization Activity Fund Training PART ONE: General Guidelines & Submitting a Budget Last Updated: July 19, 2019.
Brandon Marsh, P.E. TCEQ Air Permits Division
Presentation transcript:

CAM in Ohio Title V Permits Andrew Hall, Ohio EPA CAM/GHG Training August 22, 2011

2

3 CAM – Ohio EPA Resources Ohio EPA Answer Place #2269 –Link to the CAM rule 40 CFR Part 64 –Overview of CAM –Latest copy of CAM spreadsheet

4

5

6 Calculating Pre-control Emissions PTE Determination by Emissions Unit (usually) Use best available information Actual emission test data –vs- AP-42 emission factors Always check Fee Emission Reports (FERs) in STARS2 Look at historical data (max. production, emission rates etc…)

7

8

9

10 Calculating Pre-control Emissions Based on 97% DE of the RTO and FER it would appear that CAM is applicable However – note Additional Term and Condition b)(2)c. K005 and K009 are controlled by same RTO CAM not applicable on a per emissions unit basis Explain this in Statement of Basis (SOB) Indiana – detailed CAM applicability in T5 permit

11

12 CAM Plan Application/Forms No set format (yet?) for Ohio Most companies follow U.S. EPA examples on TTN Burden is on facilities to submit CAM Plan satisfying Part 64 requirements South Carolina DHEC has useful form Ohio could use

13

14 Boiler MACT in Title V’s Ohio EPA began processing Title V Renewals –Boiler MACT Vacated 6/8/2007 –Vacated = “as if never existed”…MACT Hammer? –MACT Hammer = 112(j) case-by-case MACT –Ohio policy: optional 112(j) Parts 1, 2 applications –Ohio policy: 112(j) “placeholder” term and condition in Title V Renewals

15 Boiler MACT in Title V’s New Boiler MACT rule 3/21/11 –Rule was “Stayed” (76 FR 28662, 5/18/11) –Stayed rule is not a vacatur: does not trigger 112(j) –New Boiler MACT rule is an Applicable Requirement

16 Boiler MACT in Title V’s New Boiler MACT: Path Forward for Renewals –New Boiler MACT “Stayed” term and condition: “ On May 16, 2011, U.S. EPA decided to Stay the Boiler MACT (40 CFR Part 63, Subpart DDDDD). This delay of effectiveness will remain in place until the proceedings for judicial review are completed or U.S. EPA completes its reconsideration of the rules, whichever is earlier, and the Agency publishes a notice in the Federal Register announcing that the rules are in effect. Upon being effective, this emissions unit will be subject to 40 CFR Part 63, Subpart DDDDD.”

17 Boiler MACT in Title V’s Final Title V Renewal with Boiler MACT “Stayed” term and condition –After FR notice that rule is in effect –Facility can submit MPM request –Ohio EPA will process MPM and include Boiler MACT in permit using Engineering Guide #76, Incorporation by Reference (IBR) approach

18 Boiler MACT and CAM Renewal Title V’s Most Title V Renewals will need CAM Plans for boilers –Exempt from monitoring for MACT rule limits once Boiler MACT is effective –Suggest that permittee submit a CAM Plan patterned after the monitoring requirements of the Boiler MACT –See FAQ: Q&A#1

19 FAQs Most Commonly Asked Questions (Ohio) –See attached, following these slides –A work in progress –U.S. EPA has many more FAQs

20 Questions? CO Permit Contact Andrew Hall: