Managing Environmental Issues with Hospital Expansion Projects Tank, Generator, and Boiler Installations from an Environmental Permitting Perspective Chris.

Slides:



Advertisements
Similar presentations
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
Advertisements

CALIFORNIA ENVIRONMENTAL REPORTING SYSTEM TRAINING FOR BUSINESSES Contra Costa County Hazardous Materials Programs.
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
Environmental Compliance Hot Topics Hardwood Plywood Veneer Association May 25, 2010.
Boiler GACT Update Georgia AWMA Conference
Air Permitting and Compliance Smithfield Foods Environmental Conference Chicago, IL July 2013.
Spill Prevention Control & Countermeasures Compliance and Planning.
RICE MACT and Oil Analysis
Our Vision – Healthier Kansans living in safe and sustainable environments.
ANNUAL SPILL PREVENTION CONTROL AND COUNTERMEASURE TRAINING (SPCC) Presented by: Prepared for: Stephen F. Austin State University February 2, 2012.
CONFIDENTIAL DRAFT Modernization of Approvals Project Update July, 2010.
Air Toxics Rule Changes (pursuant to Session Law ) North Carolina Division of Air Quality July 2013 Environmental Management Commission.
Regulatory Drivers for Reducing Solvent Emissions Barbara Johnson, PE Kansas State University Kansas Small Business Environmental Assistance Program March.
New Emission Rules for IC Engines Presented by Scott Wallace Devon Gas Services, L.P.
New Federal Regulations for Internal Combustion Engines Doug Parce.
Kimberton, PA | Columbus, GA | Strategic Air Planning: Where Do We Grow From Here? Colin McCall |
1 MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) PROGRAM Baseline Compliance Assessment 1 MassDEP 8/2/2011.
ACCA Legislative Conference Underground Storage Tank Compliance
Blue Skies Delaware; Clean Air for Life Small Boiler Permits State of Delaware DNREC - Air Quality Management William K. Harris.
SPILL PREVENTION CONTROL AND COUNTERMEASURE (SPCC) Title 40 CFR 112.
Virtual Environmental, Health & Safety Manager Compliance Management System T. Cozzie Consulting, Inc. telephone
Compliance Update NCMA 2015.
Solano County Department of Environmental Management Environmental Health Services Division Hazardous Materials.
Oil Spill Prevention, Control, and Countermeasure (SPCC) Program.
Air Quality Regulations and Academic Institutions Steve Hall Environmental Engineer II NC DENR – Division of Air Quality Raleigh Regional Office.
© Copyright, Yorke Engineering, LLC 2008 SCAQMD Rule Compliance Steps and Strategies Judy Yorke and Bipul K. Saraf Yorke Engineering, LLC
75TH CIVIL ENGINEER GROUP BE AMERICA’S BEST Hill Air Force Base Environmental Compliance 17 DEC 09 Environmental Compliance 75 CEG/CEVC
Frank Steitz Air Quality Permitting Program 10/12/2012
Mustang Watchdog April 22, 2014
1 Improving Environmental Protection and Reducing Administrative Burden North Carolina Division of Air Quality Improving Environmental Protection and Reducing.
MassDEP Underground Storage Tank Program Program Requirements for Third Party Inspectors Winter 2015 Workshops.
Environmental Quality Service Council Mint Distilling Operations August 30, 2011 Thomas W. Easterly, P.E., DEE, QEP Commissioner, Indiana Department of.
Our Vision – Healthy Kansans living in safe and sustainable environments.
Air Toxics Rule Changes (pursuant to Session Law ) North Carolina Division of Air Quality Air Toxics Rule Changes Stakeholder Meeting March 20,
Air Quality 101 Kansas Air Quality Program overview.
10/1/ Air Quality Permitting Air Quality Committee William D. Willets, P.E. Engineering Supervisor DAQ Permitting Section May 7, 2014.
ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy.
CANDACE CARRAWAY OFFICE OF AIR QUALITY PLANNING AND STANDARDS US EPA JUNE 2013 General Permits and Permits by Rule 1.
Blue Skies Delaware; Clean Air for Life DNREC Air Quality Management Air Permitting Seminar Natural Minor Permitting.
Kimberton, PA | Kennesaw, GA | Strategic Air Planning: Is the Time for a PAL Here? Mark Wenclawiak, CCM|
Presented to Georgia Airports Association Conference October 21, 2009 EPA Spill Prevention Control and Countermeasures – Update Also – What’s Coming with.
NC Toxic Air Pollutant Reports (pursuant to Session Law ) North Carolina Division of Air Quality Air Quality Committee Meeting January 9, 2013.
1 SPCC REGULATIONS Updating EPA’s Spill, Prevention, Control, and Countermeasure Regulations August 6, 2008 Air & Waste Management Association Andrew Covington,
U.S. Environmental Protection Agency Office of Emergency Management Regulation and Policy Development Division Proposed Amendments to the Spill Prevention,
2008 SPCC Rule Amendments 2008 SPCC Rule Amendments Donald P Smith US Environmental Protection Agency Region VI May, 2009 Current Status.
RECLAIM Seminar October 26, 2005 Judy B. Yorke, P.E., C.P.P. Yorke Engineering, LLC x25
MassDEP Underground Storage Tank Program Program Requirements for Owners and Operators Winter 2015 Workshops 1.
Wingra Engineering, S.C.1 Evaluation of Gas Turbine Air Quality Impacts from a Community Perspective Steven Klafka, PE Wingra Engineering, S.C Electric.
Prepared for Middle Georgia State University – Macon Campus Prepared by Geotechnical and Environmental Consultants, Inc.
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
General Operating Permit (GOP) for Combined Heat & Power (CHP) Engines & Turbines.
BY: Winston G. Smith Environmental Engineer UST/PCB & OPA Enforcement & Compliance Section EPA Region 4.
Joe Stapinski Senior UST Inspector (317)
Overview of 3 rd Party Inspection Program for USTs.
Legislative Overview  This quick module outlines in more detail the background of the legal requirements.
All About Waste Dallas, TX ♦ May 18, 2016 Carrie Yonley, P.E.
Things Aren’t Always What They Seem A Stormwater Pollution Prevention / Good Housekeeping Case Study in Western New York.
Automatic Gauging Tank System: A Next Generation Tool for UST PROF. HÉCTOR CRUZADO ENGINEERING MANAGEMENT PROJECT MEM 6200-SP-15 JOSÉ J. ROSA ROSARIO STUDENT.
Complying with Periodic Emissions Monitoring Requirements
Preparing for Permit Review
NEW General Permit-005A Emergency Generators
Simple but Complicated Air Quality Permitting for Generators
Solano County Department of Environmental Management Environmental Health Services Division Hazardous Materials.
Spill Prevention, Control and Countermeasures (SPCC)
Air Permitting General Permit Updates
Boiler Sheltered Initiative
Kansas Air Quality Seminar March 5, 2008
Air Quality Permitting
Air Quality Committee May 13, 2015
Navajo Nation Minor Source Regulations
Presentation transcript:

Managing Environmental Issues with Hospital Expansion Projects Tank, Generator, and Boiler Installations from an Environmental Permitting Perspective Chris C. Maye, P.E. Manager, Environmental Services

Case Study – CUP Expansion Plan Generator Installation:4 months –2 1,500-kW Generators (Diesel) –1 2,000-kW Generator (Diesel) Boiler Installation:5 months –4 Dual Fuel, ~29 MMBTU/Hr (700 bhp) each Fuel Oil Tanks Installation:4 months –1 30,000-gallon Diesel Tank (EGENS) –1 20,000-gallon #2 Fuel Oil Tank (Boilers)

Generators Typical diesel-fired, 300-2,000 kW Equipment: Engine and Tank Applicable Regulatory Considerations: – Air Permitting – Tank Permitting – Spill Prevention

Generators - Air Requirements Federal Requirements (MACT/NSPS) –Need Manufacturer Specifications (EPA Certified Engine, Emission Rates, Horsepower rating, fuel source, etc.) –Emission standards and hour limitations depend on use of unit (emergency, peak shaving, demand response, etc.) State Requirements –Air Emission Limitations Only applies to engines rated at greater than 1,000 horsepower and located in Bucks, Chester, Delaware, Montgomery or Philadelphia County –Tank Requirements

Generators – PA Air Permitting Permit Exemption/Request for Determination: Allows installation without a permit –Time to Decision: ~10-14 days –Applicable if site wide actual NOx emissions below exemption thresholds General Permit (GP-9) –Time to Approval: ~30 days –Stack Testing required for engines of certain size Plan Approval –Time to Issuance:~3-6 months –No real limitations; Emission standards apply, other requirements negotiable

Tanks Tank Permitting: Depending on size (>1,100 gallons), “belly” tanks or standalone may require tank registration under DEP’s Storage Tank Program. –Registration –Site-Specific Installation Permit (larger tanks) Spill Planning –Site likely needs to update existing Oil Spill Prevention, Control, and Countermeasure (SPCC) Plan –If Site has >21,000 gallons of registered storage, Spill Prevention and Response (SPR) Plan Required prior to submission of application.

Generators and Tanks – Case Study In order to meet the construction deadline: –RFD filed for new generators (approved in 15 days) –SSIP for 30,000-gallon Diesel Tank Application:4 weeks to prepare Approval:3 months from submittal –SPCC/SPR (includes existing and boiler tank installation) updated as well.

Boiler Installations Typical Unit: dual-fuel (natural gas with (fuel oil backup) MMBTU/Hr Equipment: Burner and Tank Applicable Regulatory Considerations –Air Permitting –Tank Permitting –Spill Prevention

Boiler Regulations Federal –New Source Performance Standards –National Emissions Standards for Hazardous Air Pollutants –Oil Spill Prevention State –Emission Limitations –Tank Requirements

Boiler Air Issues Need Manufacturer Data (Emission Rates, etc.) Air Permitting (PA): 2 options –General Permit (GP-1) Time to Issuance:~30 days Potential to Emit must below major source thresholds –Plan Approval Time to Issuance:~3-6 months No real limitations; can be used only for the operation of a boiler on fuel oil.

Boilers – Case Study To meet construction timeline, Air Permitting performed included: –Obtain Coverage under General Permit (GP-1) for natural gas only: Approval allowed construction to begin 3 weeks after submittal –Simultaneously file Plan Approval for firing #2 fuel oil: Approval received 5 months after filing After units installed, need to: –Stack Test (GP-1 Condition) –Consolidate into an Operating Permit –Prepare regulatory notifications under applicable rules No Tank Permitting Required SPCC Plan required updating

Boiler Tank Issues Tank Permitting: –For aboveground tanks: Not applicable for #2 Fuel Oil ASTs based on exemption for on-site consumptive use of non- motor fuel in tanks <30,000 gallons. –For underground tanks: Not applicable for #2 Fuel Oil USTs based on exemption for on-site consumptive use of “heating oil.”

Case Study - Results ON-TIME: Each authorization was obtained on-time, causing no construction delays for environmental issues RIGHT EQUIPMENT: Proper instrumentation for fuel consumption communicated and verified early in design. RIGHT SETTING: Tank construction and fuel unloading area design reviewed and confirmed compliant prior to start of project STILL WORK TO DO: Additional Follow-up still pending (stack testing, air permit consolidation, etc.) COMMUNICATION! Frequent and clear communication of when the facility could install/use equipment critical to maintaining compliance

Case Study - Conundrum Why Communication on Approval Status is essential! –Month 2 after applications were filed, approval status was such that: Generators could be run, but no fuel could be added to supply tank On #2 Fuel Oil, the boilers could not be run, but fuel could be added to supply tank

Lessons Learned/Key Points Pre-Construction PLAN AHEAD: Get detailed equipment and installation information as early as possible MONITORING = INSTRUMENTATION: Know what monitoring/recordkeeping will be required to ensure proper instrumentation (fuel consumption, etc.) are part of the project design. GET THE RIGHT SUBS: If tanks require registrations, ensure certified tank installers are part of the construction team. COMMUNICATION: Ensure timing is communicated so that environmental permitting does not slow you down and compliance is maintained.

Lessons Learned/Key Points Post-Construction NEW EQUIPMENT = NEW RECORDS: New Air Quality Emissions, Fuel, and Hours of Operation Recordkeeping must be addressed. NEW RULES = NEW RECORDS & REPORTS: New Standards (Boiler Area Source MACT, RICE MACT/NSPS) may require additional recordkeeping, notifications, and reporting. UPDATE EXISTING INSPECTIONS: Spill Planning Document Updates will include additional inspection requirements once units are installed.

References DEP Generator Tank Registration: – wnfields/StorageTanks/StorageTanksPortalFiles/Eme rgency%20Generator%20Tanks.ppthttp://files.dep.state.pa.us/EnvironmentalCleanupBro wnfields/StorageTanks/StorageTanksPortalFiles/Eme rgency%20Generator%20Tanks.ppt DEP Air Quality General Permits: – AQ/permits/gp.htmhttp:// AQ/permits/gp.htm EPA Generator MACT Air Standard: – EPA Area Source Boiler NESHAP Standard: –