Why We Made the Decisions We Made and Where We Are in Building New Generation February 17, 2005 Prepared by Nilaksh Kothari, P.E. General Manager Manitowoc.

Slides:



Advertisements
Similar presentations
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Advertisements

Platinum Energy, Inc. Slide No. 1 PROJECT EVALUATION Joseph A. Orlando, Ph.D, PE Platinum Energy, Inc. Springfield, Virginia
The Impact and Cost-Effectiveness of the Missouri Solar Rebate Erin Noble Nicholas School of the Environment Duke University Advisor: Randy Kramer.
1 NARUC/FERC Collaborative on Demand Response Pepco and Delmarva Power Blueprint for the Future Filings J. Mack Wathen July 15, 2007.
Meeting with Rep. _______________ Solar Industry Representatives May 5, 2010.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
Northern Wood Power Boiler Re-Powering: Coal to Biomass William Smagula Director of Generation EBC- NH Chapter Meeting June 19, 2007 A Positive Step Toward.
CALPINE March 2, 2004 HARVARD ELECTRICITY POLICY GROUP Natural Gas and Electricity Ron Walter Executive Vice President.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
Darden School Social Responsibility and Entrepreneurship April 2, 2007 Recycling Energy: Profitably Mitigating Climate Change Tom Casten Chair, Recycled.
Combined Heat and Power in the Ethanol Industry Tom Kerr Energy Supply and Industry Branch U.S. Environmental Protection Agency Governors’ Ethanol Coalition.
Energy Retreat Institute for Sustainability, Energy, and Environment May 8, 2014.
Wind Power Development In South Dakota E-Week Presentation Rapid City, SD February 19, 2008.
Electricity Supply in Alaska Frank Abegg, PE Fairbanks, Alaska April 2006 Frank Abegg, PE Fairbanks, Alaska April 2006.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
Engineering Technology Division
Small Farm Profitability: Is Wind Energy the Answer? 1
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
WORKSHOP ON TECHNOLOGY PATHWAYS FORWARD FOR CARBON CAPTURE & STORAGE ON NATURAL GAS POWER SYSTEMS April 22, 2014 Revis W. James Director, Generation R&D.
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
MIDWEST ENERGY OUTLOOK THE ROLE OF COMPETITIVE POWER SUPPLIERS ENERGY MARKETS IN TURMOIL May 17, 2001 Freddi L. Greenberg.
Renewable Energy in New Jersey’s Clean Energy Program Scott Hunter Renewable Energy Program Administrator, Office of Clean Energy in the New Jersey Board.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Wind Energy Development In Illinois William S. Haas Energy Division Representative.
1 Are We Ready For The Future? 2005 NIPPC Annual Meeting September 8, 2005 Michael R. Niggli President, Sempra Generation.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
KEC Electricity Committee, March 12, 2008 Benefit Cost Study of the Governor’s 2015 Wind Challenge: 1,000 MW by 2015 Bob Glass KCC Utilities Division,
In Regard To The Manitoba Hydro Needs For And Alternatives To (“NFAT”) Business Case Submission submitted to: The Manitoba Public Utilities Board by: Bruce.
Regulatory Flexibility Committee Strategies for Procuring New Generation September 18, 2013 INDIANA POWER OF WIND COALITION.
LONG TERM ELECTRICAL SUPPLY PLAN STAFF RESPONSE TO QUESTIONS, ISSUES, AND RECOMMENDATIONS MADE IN NOVEMBER 2004 Presentation to the Gainesville City Commission.
Network Customer Meeting Access Metric Update November 16, 2006.
The Texas Renewable Energy Program National Governors Association Scottsdale, Arizona April 29, 2004.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Coal as a Future Generation Fuel Chris M. Hobson S enior Vice President and Chief Environmental Officer December 3, 2009.
Discussion of Resource Plans Michael Schilmoeller for the Northwest Power and Conservation Council Wednesday, June 10, 2009.
Electric Energy Issues and the Region Connecticut Business and Industry Association Stamford, Connecticut December 2, 2004 Kevin Kirby Vice President,
2009 APPA National Conference Dealing with Customers’ Inability to Pay in Tough Economic Times June 16, 2009, 1:30 – 2:30 pm William A. Johnson.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
National Governors’ Association April 5, 2001 James Mahoney PG&E National Energy Group and any other company referenced herein which uses the PG&E name.
Combined Heat and Power Workshop Report and Next Steps Power Committee Briefing 7/15/03.
1 Kansas Wind Energy A Municipal Utility Perspective KANSAS CITY BOARD OF PUBLIC UTILITIES Blake Elliott – Director Electric Supply Planning September.
Evaluation of NEW LARGE ENERGY LOADS July 28, 2014 Andy Wendell.
Discussion Forum 2004 APPA National Conference June 19 – 23, 2004 Seattle, Washington Issues for Green Power Programs Designing Marketing and Pricing.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Eugene Water & Electric Board. Dave Churchman Manager, Power Operations Eugene Water & Electric Board.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
National Energy Technology Laboratory Driving Innovation ♦ Delivering Results Steve Bossart, Moderator October, 2015 USAEE Pittsburgh North American Conference.
CALIFORNIA ENERGY COMMISSION Outlook for California’s Electricity Supply and Land Use Implications BLM National Lands Conference David Maul Chris Tooker.
Large-Scale Renewable Energy: The Top Challenges Dick Kelly Chairman, President and CEO EPRI 2008 Summer Session August 4, 2008 Dick Kelly Chairman, President.
In 2014, the average levelized price of signed wind power purchase agreements was about 2.35 cents per kilowatt-hour. This price is cost competitive with.
Northwest Power and Conservation Council The Northwest Experience with Energy Efficiency As A Resource Option Tom Eckman Manager, Conservation Resources.
Dale Arnold Director, Energy Services Ohio Farm Bureau Federation.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
Overview Market Opportunities Market Challenges
Affordable Energy Production from Renewable Fuel
Basin Electric SPP Market Update
Division of Energy Resources
Marginal Cost Pricing: Why Is It Important? Have We Achieved It?
City Council April 30, 2018 Item 13
Stevenson 5 Capacity Planning.
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Wind Development & Policy Options
Wholesale Electricity Costs
Presentation transcript:

Why We Made the Decisions We Made and Where We Are in Building New Generation February 17, 2005 Prepared by Nilaksh Kothari, P.E. General Manager Manitowoc Public Utilities

February 17, OUTLINE OF PRESENTATION  OVERVIEW OF THE SYSTEM  THE PROBLEM/CONCERNS  POWER SUPPLY OPTIONS CONSIDERED  BENEFITS OF OWNING GENERATION  PROJECT STATUS  QUESTIONS

February 17, Facts in Brief-2003 Electric UtilityWater Utility Revenues$35,140,092$4,748,813 Number of Customers 17,50213,540 Units sold522,931 MWhs2,917,478 kgals Miles of Line/Mains Average Net Investment $54,242,542$20,450,225

February 17, Sources of Capacity l Sources of Capacity -122 MW Total in 2004  Steam Generating Plant70.0 MW  Diesel11.0 MW  Combustion Turbine (Gas)21.0 MW  Market Purchases20.0 MW l Age of Facilities / Capacity  Boiler #550 Years / 15.0 MW  Boiler #646 Years / 17.5 MW  Boiler #738 Years / 17.5 MW  Boiler #812 Years / 21.0 MW  Diesel17 Years / 11.0 MW  Combustion Turbine 3 Years (Refurbished) /20.5 MW  Steam Turbine Generator #267 Years  Steam Turbine Generator #362 Years  Steam Turbine Generator #451 Years  Steam Turbine Generator #546 Years  Steam Turbine Generator #638 Years

February 17, Sources of Energy l Sources of Energy – 2003  MPU Generation292,133 MWH (55%) – Steam291,070 – Natural Gas 36 – Diesel 1,027  Market Purchases242,392 MWH (45%) – WPPI 91,149 – WPS148,633 – WE Energies 2,588 – Alliant 22 l Purchased vs. Produced Energy (MWH): Purchased / Generated  ,573 / 293,47748/52  ,769 / 264,18953/47  ,502 / 294,15749/51  ,768 / 255,16854/46

February 17, THE PROBLEM Projected Historical

February 17, Concerns l Age of the existing facilities  Boiler and generators > 50 years as compared to expected life of years  Increased down time of equipment for maintenance l Boiler #5  Environmental concerns- notice of violation from DNR  Requires special fuel, and is relatively expensive to operate l Transmission constraints limit import capability  Regional and Statewide  Interconnect through the Shoto Substation limited to 55 MW (summer) l Wholesale purchased capacity not reasonably available l MPU’s average cost of generation is higher than the cost of purchased power

February 17, Energy Production Costs - Existing

February 17, Power Supply Options Considered ( ) l Existing Generation Resources 1. MPU Steam Plant Improvements 2.MPU Steam Plant Package Boiler 3. MPU Peakers l Capacity and Energy Proposed to MPU 4. McCartin Group Manitowoc steam plant 5. Dominion Evantage peakers 6. Dynegy 7. Xcel Energy 8. Dairyland Cooperative 9. WE Energies 10. Capacity and Energy Proposals to GLU l Potential Lease Options 11. Edison Mission 12. FPLE/Tenaska 13. Dominion Thermal l Potential Self Build Options MW combustion turbine(CT) MW combustion turbine(CT) MW combined-cycle unit 17. MPU Plant Expansion 18. Other Independent Power Producers

February 17, Factors Considered in Evaluation of Options lDemand and energy forecast lAssessment of existing facilities lManagement/diversification of power supply portfolio lCapital, operating and maintenance costs lMinimize MPU’s generation costs/competitive electric rates lMaximize use of existing site lFinancing feasibility lAccount for uncertainties/trends  Retail deregulation  Environmental regulations  Transmission constraints  Role of Regional Transmission Organizations  Wholesale market transition

February 17, Average Purchased Power Cost (2003 $) = $38.97 Average cost of generation (2006 $) = $24.73 Projected Energy Cost Saving

February 17, l The 63.3 MW expansion at the existing site results in the lowest rate impact to MPU’s customers of all alternatives l Reduces air emissions per megawatt produced by one-third l Utilizes existing CFB technology (same as Boiler 8):  With Boiler 8, provides all of MPU’s baseload energy requirements at an average variable cost of $15-18 per MWH  Like Boiler 8, burns a wide range of fuels allowing more options to stabilize operating costs l Minimizes reliance on wholesale electricity markets that experience price volatility due to forces outside MPU’s control l Removes reliance on transmission system for power imports l Keeps money from MPU’s ratepayers in Manitowoc l Significantly increases MPU’s payment in lieu of taxes l Maintains jobs in Manitowoc and provides infrastructure for economic development Benefits of Power Plant Expansion

PROJECT STATUS

Power Plant prior to demolition (Looking South) February 2004

Foundation for Boiler Building in progress April 2004

Steel erection of Boiler Building July 2004

Boiler and Turbine Building (Looking Southeast) January 2005

Boiler Building (Looking Northwest) January 2005

Turbine Building Operating Deck Turbine Foundation Preps January 2005

QUESTIONS