Workshop Vienna, 2nd july 08 The „Energy in minds!“ - project in the energy region Weiz-Gleisdorf
Workshop Vienna, 2nd july 08 WeizWeiz GleisdorfGleisdorf 17 communities inhabitants Energy region Weiz-Gleisdorf
Workshop Vienna, 2nd july 08 Project Partner in Austria Coordination of the energy region Weiz-Gleisdorf: W.E.I.Z. Research organisation: AEE INTEC Institut for sustainable technologies Utility: Feistritzwerke STEWEAG GmbH
Workshop Vienna, 2nd july 08 Research/Innovation Information campaign Public energy day Innovative PV-systems Bio-fuelled co-generation High efficient retrofit Establish wood-pellet infrastructure Dissemination
Workshop Vienna, 2nd july 08 Demonstration Innovativ solar thermal systems 80 solar-comby-systems in private households (10 – 20m²) 8 large-scale-systems f. resident.buildings or tourism.comp. Innovative PV-systems 25 PV-Systems in private households with about 3 kWp Improve district heating system 15 local district heating systems with about 150 kWh th, using woodchips or pellets Energy checks for buildings
Workshop Vienna, 2nd july 08 Demonstration High efficient retrofit 7000 m² residential-buildings 2500 m² public-buildings 1000 m² office-buildings New low-energy buildings 4500 m² residential-buildings with passivhouse-standard Communal energy management Establish wood-pellet infrastructure 110 pellet boilers with 10 to 30 kW Establish bio-fuel infrastructure
Workshop Vienna, 2nd july 08 DEM: for example: Plant oil-infrastructure Two new fuel stations Training course for garage owners and mechanics Installation of an show room Adaption of 30 vehicles to use plant oil
Workshop Vienna, 2nd july 08 Solar thermal systems Since June 2005 we installed 1331,9m² = 67 solar plants (one family houses)
Workshop Vienna, 2nd july 08 Pellet burners Since June 2005 we installed 886 kW= 56 pellet burners (one family houses)
Workshop Vienna, 2nd july 08 New buildings (one family houses) Since June 2005 we supported 2214 m² of new buildings.
Workshop Vienna, 2nd july 08 Retrofits - one family houses Energy characteristic: 258 kWh/m²a Energy characteristic: 58 kWh/m²a Since June 2005 we supported 2327m² of retrofits.
Workshop Vienna, 2nd july 08 Retrofits - one family houses Measurements Roof: 40 cm heat insulation Outer walls: 12 cm insulation Windows: U-value 1,1 W/m²K Heating system: solar thermal system 20m², wood boiler, storage tank 1000l
Workshop Vienna, 2nd july 08 Retrofits - one family houses Energy characteristic: 205 kWh/m²a Energy characteristic: 54 kWh/m²a
Workshop Vienna, 2nd july 08 PV-plants PV-power: Wp 16m² therm. Collector 12 kWh/m² heating PV-Power: Wp Low energy-building in massive construction < 12 kWh/m² heating
Workshop Vienna, 2nd july 08 District heating systems - 7 plants finished – 820 kW th
Workshop Vienna, 2nd july 08 Communal energy management Streetlights - in 4 communities, installationion of energy saving streetlights - using new lamp-technology, reduction of operatingvoltage
Workshop Vienna, 2nd july 08 Online Energy-consulting
Workshop Vienna, 2nd july 08 Bio-fuel „plant oil“ - 8 vehicles adaped to bio fuel and in operation - 2 filling stations will be finished in July trasportable show-element to present the technology in the region
Workshop Vienna, 2nd july 08 Bio-fuel co-generation plants 1 plant running, 2 plants under construction - Electric Power: 8 kW – grid-connected - Thermal output: 18 kW – for heating office-building - Overall efficiency: aprox. 91%
Workshop Vienna, 2nd july 08 Monitoring for Energy in minds!° - projects
Workshop Vienna, 2nd july 08 Buildings monitoring
Workshop Vienna, 2nd july 08 Buildings
Workshop Vienna, 2nd july 08 Buildings Energy demand: Before:157 kWh/m²a After:24 kWh/m²a Energy costs: Before: €/year After:4.190 €/year
Workshop Vienna, 2nd july 08 Solar Thermal System and Pellet Boiler – Family Hausmann, Gleisdorf 19.5 m² 1,250 litres storage tank Domestic hot water is generated by a flat plate heat exchanger 10 kW pellet boiler for auxiliary heating
Workshop Vienna, 2nd july 08 Monitoring Solar Thermal System and Pellet Boiler – Family Hausmann, Gleisdorf House energy demand of 43 kWh/m²a for 150 m² living area The 19.5 m² solar thermal collector area was architectural integrated in the building’s south facade
Workshop Vienna, 2nd july 08
Solar Thermal System and pellet boiler – Family Wolf, Gleisdorf 15 m² 1,000 litres storage tank 10 kW pellet boiler for auxiliary heating
Workshop Vienna, 2nd july 08
Monitoring PV plants
Workshop Vienna, 2nd july 08 Monitoring PV-Plants – web-based