Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School.

Slides:



Advertisements
Similar presentations
Energy Efficient Steam Systems
Advertisements

ENERGY SURVEYING Please Click through this presentation.
Energy Service Productivity Management ©2007 ESPM Energy Consultants, L.L.C. All Rights Reserved.
DISTRICT HEATING: AN OVERVIEW PRESENTED BY: NIELSEN SYSTEMS APRIL 8, 2011.
Welcome to a world of expertise Renewable Heating Solutions Jamie Boyd Sales Manager - Renewables & Installed Heating Glen Dimplex Northern Ireland.
S T A T E O F C A L I F O R N I A The Department of General Services Grid Neutral Schools Division of the State Architect, Department of General Services,
Heat Recovery for Commercial Buildings
June 28, 2010 Educational Plant Maintenance Association of Maine 42 nd Annual Conference Colby College District-wide heating with Bio-mass Mike McCormick,
Madawaska School Department Heating System Renovation and Replacement.
A Home Energy Workshop. Developed by Central Vermont Community Action Council In partnership with Efficiency Vermont.
© CNT Energy 2013 CNT Energy’s Energy Savers Program The Streamlined Approach to Retrofitting Multifamily Buildings in Chicago Russell Ruch Energy Analyst.
WOODFUEL FOR THE CONSTUCTION INDUSTRY Architects Point of View + Building Regulations.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Franklin County Technical School Performance Contract Project.
ORNL ESPC Overview GovEnergy ESPC Project Summary  $89M project funded by $8.2M in guaranteed annual savings  Energy Conservation Measures: 1.Select.
Objectives: Understand importance of utility and maintenance system in industry/plant.
Economic Realities for Sustainable Real Estate Green Retrofit Lending 34 th Annual Real Estate & Economics Symposium Fisher Center for Real Estate & Urban.
TEAM UP! FOR Waste-Heat AND Recovery SAVINGS It can be as easy as re-using hot exhaust air.
“Energy Efficiency Guide for Industry in Asia”
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Solar Energy Technology for Commercial Facilities John Archibald American Solar, Inc. Association of Energy Engineers Baltimore Chapter.
PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
 Industrial societies spend huge amounts of energy.  Much of it is supply by electricity which comes from generators in power stations.
Utility Rebates Services and Funding to Help Build “Green” Restaurants and Hospitality Facilities Tom Coughlin Program Manager.
“Biomass in our Schools” EPMA Presentation Presented by: April 10, 2013.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Some aspects of energy efficiency and energy conservation in buildings Dorota Chwieduk Department of Eco-Building Engineering Institute of Fundamental.
“Sustainability serves as a lens through which business decisions are examined. Sustainability is not the responsibility of one department or the task.
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Surat Textile Cluster Surat, Gujarat State.
Northeast and Mid-Atlantic States Regional Low Carbon Fuel Standard Stakeholder Meeting
Building Technologies Energy and Infrastructure Upgrade Program Utilizing National Grid Incentives Rensselaer County Office Building.
Lansing Board of Water & Light REO Town Headquarters & Cogeneration Plant REO Town Cogeneration: Concept to Commercial Operation.
PASBO Building Considerations for Vo-Tech Education March 17, 2011 Pat Adams Dave Kramer Collin Sandifer.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Bill Harrison New Jersey Chapter February 3, 2009.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Plant Utility System (TKK-2210) 14/15 Semester 4 Instructor: Rama Oktavian Office Hr.: M-F
Heating Systems.
March 30, 2010 Michael Kelleher SUNY College of Environmental Science and Forestry Energy Use, Renewable Energy and SUNY ESF Climate Action Plan.
Facility Improvement Program Town of Shirley June 17, 2013 Robert Reddish ABM Building Solutions.
International Newspaper Group 2008 Gannett’s Green Campaign.
HEATING SYSTEMS. Conventional heating systems The energy released by the burning fuel is transferred to the surrounding air by conduction, convection,
Marriott Corporate Headquarters
Yellow Wood Associates, Inc. 228 North Main Street St. Albans, Vermont (802) (802) Fax
ENERGY AGENCY LITHUANIA Perspective for the EU Structural Assistance to the Energy Projects in Lithuania for the period Marijus Franckevičius.
The key to comfort and reduced fuel use for all heating systems.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
THERMAL POWER PLANT.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Energy Conservation Building Upgrades Alma School District.
Personal details: ENG.Iqbal AL-tayyar Bachelor in Mechanical Engineering from Kuwait university. Director of Technical Supervision Department. Applied.
MSAD # 52 Energy Savings Performance Contract May 4, 2016 Upgrading our School Facilities and Reducing Energy and Maintenance Costs Utilizing Performance.
Town of Woodbridge Beecher Road School Infrastructure & Energy Upgrade Presentation to Board of Education December 17 th, 2012 AKF John B. Rice, PE, LEED.
Introduction to Xylem Inc. Progressive Energy, Environment & Sustainability Summit 16 May 2013.
The key to comfort and reduced fuel use for all heating and cooling The key to comfort and reduced fuel use for all heating and cooling.
Cuba-Rushford CSD Capital Project
Fort Stanwix National Monument Energy Audit Contract
WAYNE STATE UNIVERSITY
Specifics of multi-apartment building deep complex retrofitting
DOMESTIC HEATING DESIGN PRINCIPLES
Flo-Direct®.
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Energy Management Introduction Rantharu Attanayake BSc. (Eng), MSc, MBA EE – Energy Management Mobile :
Presentation transcript:

Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School

Industrial Heating & Piping Co. Madawaska Town Meeting Heating Project Special meeting February 16 th, 2011 Introductions Todd Leroy, Superintendent, Madawaska School Department Mike McCormick, Owner, McCormick Facilities Management, Construction Manager for this project Maynard Pelletier, President, Industrial Heating & Piping, Prime Contractor for this project

Industrial Heating & Piping Co. Organizational structure for our “team approach” Todd LeRoy School Superintendent (Primary school contact) Mike McCormick Construction Manager (overall project responsibility) Maynard Pelletier General Contractor (mechanical installation and sub trades management)

Industrial Heating & Piping Co. Role of our team members Mike McCormick will meet with your Board committee Discuss what you would like to do in this project Long-term building goals Energy conservation Alternative/Renewable opportunities Financing the project Operations and Maintenance goals Review previous studies and efforts

Industrial Heating & Piping Co. Role of our team members Industrial Heating & Piping will be instrumental to the ultimate success of this project They will: work with the committee and CM to obtain an understanding of the desired outcomes investigate existing project conditions within the building perform the construction and manage sub trades Condensate return tank steam escaping

Industrial Heating & Piping Co. We are a team specifically assembled to best serve the districts interests We aspire to make this YOUR project We are here to assist and advise what will work for building systems We will meet with your Board and Committees to fully understand your needs and desired direction We will fully investigate the existing conditions We will explore multiple solutions and present them to you with the pros and cons of each

Industrial Heating & Piping Co. Approach to the project 1. Meet with the Board Committees 2. Perform thorough building and systems investigations 3. Conduct an energy audit and heating load calculations 4. Review green and alternative energy opportunities 5. Design final solution (s) 6. Construction complete before end of 2011

Industrial Heating & Piping Co. Existing conditions Aged and inefficient heat generation, distribution, and terminal devices No mechanical air exchanges within building Higher than average utility costs

Industrial Heating & Piping Co. There are 2 projects: #1 is the installation of a wood chip fired boiler and accessories to be the primary heat source Budgeted at $1.4 million #2 is to convert the steam system to a hot water system, and other energy improvements Budgeted at $2.7 million Together they will provide a comfortable and energy efficient school environment

Industrial Heating & Piping Co. Bio mass project description Construct a new boiler house to accommodate the wood boiler and wood chip storage Install a 4.3 MMBTU wood chip boiler and new oil fired back up boiler Install thermal storage tank and roof top solar units for domestic water and heating water supplement Connect wood fired system to new building distribution system

Industrial Heating & Piping Co. Steam to hot water conversion project Replace both existing boilers with one oil fired hot water boiler Reuse as much existing piping as possible and replace as needed Replace univents and terminal device Add fresh air systems with heat recovery Rebuild exhaust fans and air handlers, café and gym Install solid state direct digital building controls Remove equipment from existing boiler room Remove brick chimney Install new lights and sensor in gym

Industrial Heating & Piping Co.

Industrial Heating & Piping Co. Possible location for new bio mass plant

Industrial Heating & Piping Co. Fuel savings Fuel savings spreadsheet Annual 1 st year – $196, year savings – $1,967, year savings – $2,950,554 Savings over oil

Industrial Heating & Piping Co. ??Questions and Answers?? Thank you for attending tonight and supporting this exciting project for your school department and community. Burn Maine wood – create Maine jobs!