Geographical Position of HALDIA

Slides:



Advertisements
Similar presentations
POWERLINKS TRANSMISSION LIMITED a joint venture of TATA POWER &POWERGRID.
Advertisements

Duke Energy Carolinas Dan River Combined Cycle Project 8/17/10 For Vogt Power, my best estimate is 214 shipments (rail, truck, LTL, and small parcel- UPS.
31 st Annual General Meeting 26 th July, : The Year Gone by  Mixed global recovery with exposure to short term and long term risks continue.
Thermal Power Station Plant. Introduction 150 MW Thermal power station plant, produce 450t/hr steam at full load The max steam pressure is 150 bar with.
KILN BASED COKING PROCESS AND POWER GENERATION. The application of rotary kiln technology to process low calorific coal to produce coking coal The process.
SURATGARH SUPER THERMAL POWER STATION
American Public Power Association The Challenge of Building a Coal Plant in Today’s Environment Raj Rao President, Indiana Municipal Power Agency Chairman,
Steam (Vapour) Power Plant Rankine cycle Power Plant
CDR Analysis & Investigation Basic Course - Presentation
1. Cooling tower. 2. Cooling water pump. 3. Transmission line (3-phase). 4. Unit transformer (3-phase). 5. Electric generator (3-phase). 6. Low pressure.
Feedwater Heater Heat Transfer Richard Galati Brent Smith Justin Pierce.
Presentation Technology ORC GREEN MACHINE
2 July Turbine Condensate System
North American Power Group Western Mine-Mouth Coal-Fired Power Two Elk.
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
Welcome.
January 17, New Delhi. Contents  Background  Project Highlight  Power Allocation  Project Location  Gas Supply Network of ONGC.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Regents Alert*****.  To find out the date you must look at the position of sunrise and sunset.  June 21- Northeast to Northwest.  Dec. 21- Southeast.
STEAM TURBINE POWER CYCLES. The vast majority of electrical generating plants are variations of vapour power plants in which water is the working fluid.
AIM :- TO STUDY ABOUT STEAM POWER PLANT
Sterlite Grid Limited Committed to the nation's mission to provide quality power for all.
Generating Electricity
Heat pumps Effectiveness measured by the Coefficient of Performance C.O.P. = T h /(T h -T c ) This comes from the Carnot Efficiency As the outside air.
Generating Stations. Bulk electric power is produced by special plants known as generating stations or power plants. Depending upon the form of energy.
Welcome PRESENTATION BY ASHISH MISHRA.
STEAM POWER PLANTS.
Site: Ratcliffe-on-Soar Power Station Current/Defunct Use: Coal Power Station Location: South-West of Nottingham Land Owner: Mark Stevens Rail Connections:
Heat Pumps In a heat engine, heat is converted to mechanical energy by taking advantage of the fact that heat flows from hot to cold. The heat is taken.
A Seminar On Suratgarh Super Thermal Power Station (Raj.)
A seminar on Practical Training taken at KOTA SUPER THERMAL POWER STATION.
A Presentation On Summer Training At SURATGARH SUPER THERMAL POWER STATION (6×250MW)
Barford Power Station St Neots Community College Sixth Form Visit, May 2008.
SURATGARH SUPER THERMAL POWER STATION
Submitted in partial fulfillment for the Award of degree of Bachelor of Technology In Electrical Engineering Submitted By: Submitted To :- NITESH SONI.
A SEMINAR ON PRACTICAL TRAINING AT SURATGARH SUPER THERMAL POWER STATION.
KOTA SUPER THERMAL POWER STATION ,KOTA
SURATGARH SUPER THARMAL POWER STATION
Seminar Report On KOTA SUPER THERMAL POWER STATION Submitted in partial fulfilment for the Award of degree of BACHELOR OF TECHNOLOGY In Electrical Engineering.
Training Presentation On Suratgarh Super Thermal Power Station (Raj)
Submitted in partial fulfillment for the Award of degree of Bachelor of Technology In Electrical Engineering Submitted By: Submitted To : Department.
BOILER HOUSE CONDENSOR SHAFT PUMP CLEAN WATER IN THE BOILER THERMAL POWER STATION FUEL OR GAS STEAM TURBINE GENERATOR.
Presentation on Steam Power Plants R.C.Chaturvedi
CERTIFICATE This is to certify that the project work entitled “Different Power Plants“ Is being submitted by Name of the student : Enroll no.: Patel Akshaykumar.
Presented by Presented to:- Mr.Rajan Karir Associate Professor A PRACTICAL TRAINING SEMINAR ON KOTA SUPER THERMAL POWER STATION,KOTA UCE, RTU, Kota.
CESC – visit presentation Marwadi Shares and Finance Ltd. 17 August 09.
Coastal Gujarat Power Limited (A Tata Power Company) Harish Kumar Jangir Electrical Engineering 7 TH SEM.
A Presentation on THERMAL POWER PLANT Sunil Kumar M.E. (5TH)
Introduction And Thermal Power Plant
Luthin Associates Overview
Cooling Tower Blowdown Recovery using Thermal Desalination
FRESNO COUNTY WEST ANNEX JAIL
UBOH PLTU JAWA BARAT 2 PALABUHANRATU 3 x 350MW
THERMAL POWER PLANT.
Sub title- Authors (font 50; black; bold)
Sub title- Authors (font 50; black; bold)
Sub title- Authors (font 50; black; bold)
Western Section Joint Delivery Board Meeting 3rd February 2015
THERMAL POWER PLANT. A Thermal Power Plant converts the heat energy of coal into electrical energy. Coal is burnt in a boiler which converts water into.
THERMAL POWER PLANT.
THERMAL POWER PLANT.
THERMAL POWER PLANT.
Idaho Power Transmission System
Sub title- Authors (font 50; black; bold)
Sub title- Authors (font 50; black; bold)
Sub title- Authors (font 50; black; bold)
WATER AND STEAM SYSTEM.
Heat Recovery Steam Generators
Sub title- Authors (font 50; black; bold)
Use this slide to present information in bullet form.
Presentation transcript:

Haldia Power Station Presentation Title ( Arial, Font size 28 ) The Tata Power Company Ltd. Haldia Power Station Date, Venue, etc..( Arial, Font size 18 )

Geographical Position of HALDIA Site Location : The Geographical location of the site is Latitude : Between 22 0 15” and 22 0 7’ 15” North Longitude : Between 88 0 3’51” and 88 0 11’44” East The Site is located close to the northern bank of river Hooghly. Haldia River is also flowing North West side of the site. The confluence of Hooghly River and Haldia River is within 1 km on the Southwest side of the project site. Nearest village is Ranichak, which is about 4 kms away from the site. Access to Site : The site is well connected by rail and road with Kolkata and Kharagpur. It is also accessible from Kolkata by Hooghly River via Kukrahati ferry ghat. Kukrahati ferry ghat is connected via road to Chaitanyapur and then to NH-41 linking the site with Haldia.

Geographical Position of HALDIA Haldia Power Station

Project Summary

Process Diagram Waste Heat Boiler =16 Rated 24.5 TPH Coke Oven Rows = 04 nos, Batteries= 32 nos, Ovens = 352 nos) Turbine & Generator. UNIT#1 = 45 MW UNIT#2 = 45 MW UNIT#3 = 30 MW 132 KV SWITCHYARD GT = 3 Nos ST = 4 Nos

Carbonization Process

Waste Heat Recovery System Boiler Chimney I/L damper ID Fan O/L damper Coke Oven Bypass damper

Plant Schematics 2 1 3 4 Turbine & Generator UNIT-1 UNIT-2 UNIT-3 O W K E o V N 2/1 R O W 1 C K E o V N R O W 3 C K E o V N 3/1 R O W 4 C K E o V N 1/1 4/1 2/2 3/2 1/2 4/2 2/3 3/3 1/3 4/3 2/4 3/4 1/4 4/4 Boilers Boilers

BOP Schematic BOILER TURBINE BFP CEP CONDENSER DEARATOR COOLING TOWER #1-4 #2-4 #3-4 #4-4 #1-3 #2-3 #3-3 #4-3 #1-2 #2-2 #3-2 #4-2 COOLING TOWER #1-1 #2-1 #3-1 #4-1 TURBINE BFP 45 MW 45 MW 30 MW CEP CONDENSER DEARATOR EJECTOR GSC DRAIN COOLER LPH

Boiler Schematic Puppy Header Drum 2 nos of Evaporator 6 nos of   Drum 2 nos of Evaporator 6 nos of Economiser   3 nos of Super heater From FRS To TG through MS Common Header

Schematic of Electrical Network

Haldia Power Sale Schematic OA Customer WBSEDCL WBSEDCL sale will be 1/6th of total power sale @ Rs 1.86 per unit. Rest of power sale to OA customer through TPTCL. TPTCL 132 KV Bus Aux. Power Cons. has been segregated from TATA Steel w.e.f. 14th Nov 2011. TATA Power 120 MW TATA Steel

Haldia Milestones….. Commercial Date of Operation of Unit #1 : 8th Aug’08 Start of Open Access power sale : 20th Dec’08 Commercial Date of Operation of Unit#2 : 23rd Dec’08 Commissioning of new DM Plant : 16th July’09 Completion of Renovation of 132 kV transmission line : 6th Aug’09 Commercial Date of Operation of Unit # 3 : 10th Sept’09 Aux Power Segregation : 14th Nov’11

Email : eugine@tatapower.com Website: www.tatapower.com