Cable Channel tests ____________________________________________________________ 17/Apr/07 Pisa Group Four configurations of insulation has been tested.

Slides:



Advertisements
Similar presentations
Barrel services minimum space allocation in Z ‘Strawman’ layout and Spider… layout WARM and COLD GAP versions Services envelope in Z: In order to reserve.
Advertisements

WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- M0 COOLING IN H4 Cooling is a key issue : –APD gain : ~ -2.4 % /  C –XTAL response (scintillation) : ~ -1.9.
Thermal Analysis of short bake out jacket version 1 12-Nov-2013.
27/9/2007, T Water =19°C No Box screwed onto cooling block: T min =37°C, T max =48 °C.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 18 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
1 Denis Grondin – Sept.23 TH, 2010 Cooling & mechanics status CALICE Collaboration Casablanca at LPSC ECAL.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
W. EbensteinDOE Review Duke UniversitySeptember 1999 TRT Barrel Cooling: Electronics  Motivation: u Overheating of electronics causes premature failure.
NSTX TF Bundle & Center Stack Curing Oven Mike Viola Joe Rushinski Frank Jones April 14, 2003.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
Land Vs. Water Lab Lab Section.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
C ONCENTRIC TUBE H EAT EXCHANGER TEST SETUP AT C RYOLAB CO2 FOR CMS T RACKER WEEK MEETING. Theodoros Katopodis PH-CMX.
Tracker Thermal Control System 1 AMS Tracker Thermal Control System (TTCS) Phase II Safety Presentation SRII meeting, 21 May 2007, Houston Johannes van.
LMC 30 LPC A. Verweij, TE-MPE. 30 Sept 2009, LMC meeting 1.9 K, 0 T, 7.5 kA run Heat pulse.
ATLAS Calorimeter Argon Gap Convection Test Bed Brian Cuerden 24 Apr
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Nuclear Thermal Hydraulic System Experiment
Rod Dry Dec Training Module #6: Problem Statement Low pressure steam (1 barg) is condensed in a heat exchanger with cooling water. The exchanger.
ERT 216 HEAT & MASS TRANSFER Sem 2/
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
A for Military Ships August What is A? A is a system of: –tube assemblies –tube connectors –tube management closures –fibre bundles –fibre management.
ATLAS Calorimeter Argon Gap Convection Test Bed April 25,
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
Summary of Winding Pack Thermal Results K. Freudenberg
Convection: Internal Flow ( )
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
Table of content 1- Heat exchanger design (cooler ) 2- Distillation column design. 3- Valve.
SEPTEMBER 2002 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Detector Heater Panel Testing Alexis Smith September 17, 2002.
Thermal Control System. The Three Mechanisms of Heat Transfer Conduction - The transfer of heat through a solid –Interface Heat Exchangers –Cold plates.
DETECTOR PIXEL CHIP MCM PIXEL BUS COOLING TUBE PIXEL BUS AND PILOT MCM CONNECTIONS (1) SDM comp LASER DIODE Space reserved (15mm) for connections.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
PHASE II FLIGHT-SAFETY REVIEW AMS-02 EXPERIMENT sub-detector SILICON TRACKER Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25,
Tracker Goals o Main issue is to be able to run cold as more radiation is accumulated. o Due to “uncontrolled” humidity behavior, our present limit is.
How much makes it through the atmosphere. Why a seasonal variation? First, why do we have seasons? Earth’s axis is tilted 23.5° to the plane of its orbit.
Pixel upgrade test structure: CO 2 cooling test results and simulations Nick Lumb IPN-Lyon MEC Meeting, 10/02/2010.
CLIMATE GRAPHS. Temp In °C Precipitation In mm OTTAWA LABELS! CITY AT TOP TEMPERATURE ON LEFT IN °C PRECIPITATION ON RIGHT MONTHS ACROSS THE BOTTOM.
IBL CO 2 cooling flexible transfer integration into IDEP 24 July 2013 Jan Godlewski, Bart Verlaat, Siegfried Wenig, Nicolas Massol, Tomasz Blaszczyk 1.
W. EbensteinDOE annual review Duke UniversitySeptember, 1998 TRT Barrel Cooling: Electronics  Motivation: u Overheating of electronics causes premature.
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
AT/CRG/cd 1 DFBX Low Current Lead Chimneys Consolidation May 16th 2008.
Stave thermal analysis Cooling connections CO2 warm Test
Florian Buchsteiner (HEPHY Vienna)
Calorimeter Experiment to Determine the Specific Heat of Aluminum
Service channels between Tracker and PP1
The EMC cooling F. Raffaelli INFN - Pisa 06/09/2017.
Ti/SS transitions A.Basti INFN-PISA*
Service channels between Tracker and PP1
MICE Meeting at RAL, Oct-23, 2005
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
cooling and supports of the forward endcap EMC
HB RM prototypes Ianos Schmidt Aug 17, 2017.
CEDAR Detector Ventilation System Review
Hot and Cold Can Experiment
First of all we will remind some numbers:
Dr.Salwa Alsaleh fac.ksu.edu.sa/salwams
ANNEX E PRESENTER WINSTON THOMAS
Members of project: Christian Brosch Andreas Maier Tamara Bubeck
Tests on a dummy facet of PIX upgrade using CO2 cooling
GENERALPIPINGREQUIREMENTS:. Designing and erecting an efficient piping system requires certain aspects/ requirements which could be found in our PME handbook…
Single Detector Design
GeoServer v2.5 Bilinear The following shows the results for WMS getMap requests for a 74x96 deg. NAVGEM Air Temperature 1 deg. grid (roughly size of Africa).
Building pattern  Complete the following tables and write the rule 
Presentation transcript:

Cable Channel tests ____________________________________________________________ 17/Apr/07 Pisa Group Four configurations of insulation has been tested in the following condition: T fluid C power off T fluid C power off T fluid C power on (1 watt/m) T fluid C power on (1 watt/m) Next tests: Mechanical e thermal Considerations in the real channel. Summary

____________________________________________________________ 17/Apr/07 Pisa Group 9 mm space loft in a packaging bag Radius of Tubes  38mm Min radius of cable Bundle  75 mm The box is isolated from the table of 20 mm Conf. 1

Conf. 1 test results no power ____________________________________________________________ 17/Apr/07 Pisa Group conf1 run1 4/4/07 no power temp fluid temp ext cables avg temp in box temp ext box top temp ext box vert temp ext box bottom temp tair  t cable C  t insul C  t total C

____________________________________________________________ 17/Apr/07 Pisa Group Conf. 2 The box is isolated from the table

Conf. 2 test results no power ____________________________________________________________ 17/Apr/07 Pisa Group temp fluid temp ext cables avg temp in box temp ext box top temp ext box vert temp ext box bottom temp tair  t cable C  t insul C  t insul C conf2 run2 5/4/07 no power

Conf. 3 test results no power ____________________________________________________________ 17/Apr/07 Pisa Group temp fluid temp ext cables avg temp in box temp ext box top temp ext box vert temp ext box bottom temp tair  t cable C  t insul C  t insul C

Conf. 4/5 test results no power ____________________________________________________________ 17/Apr/07 Pisa Group The configuration 4 is isolated from the table. 3 mm of armeflex is installed around cables. The cooling pipes were rapped with a foil of 50  m of aluminum

Conf. 4 test results no power ____________________________________________________________ 17/Apr/07 Pisa Group temp fluid temp ext cables avg temp in box temp ext box top temp ext box vert temp ext box bottom temp tair  t cable C  t insul C  t insul C

Conf. 4 test results with power ____________________________________________________________ 17/Apr/07 Pisa Group temp fluid temp ext cables avg temp in box temp ext box top temp ext box vert temp ext box bottom temp tair c4 run9 13/4/

Conf. 5 test results no power ____________________________________________________________ 17/Apr/07 Pisa Group temp fluid temp ext cables avg temp in box temp ext box top temp ext box vert temp ext box bottom temp tair  t cable C  t insul C  t insul C

Conf. 5 test results with power I=9A V=15 ____________________________________________________________ 17/Apr/07 Pisa Group temp fluid temp ext cables avg temp in box temp ext box top temp ext box vert temp ext box bottom temp tair conf5 tf-13 power

Next tests: ____________________________________________________________ 17/Apr/07 Pisa Group We were trying to improve the uniformity of temperature. For this reason we are adding on the cable bundle an aluminum foils of 0.2 mm The test will be done on conf5.

Mechanical e thermal Considerations in the real channel. ____________________________________________________________ 17/Apr/07 Pisa Group Several sections have been found. The channel are taper. The section of cable and tube must be adapted at the different sections

Mechanical e thermal Considerations in the real channel. ____________________________________________________________ 17/Apr/07 Pisa Group

Summary ____________________________________________________________ 17/Apr/07 Pisa Group 1.For the connector there is no problems of condensation. 2.Internal flow must be assured to keep the channel dry for safety 3.In the condition of C and max power the plate was at / C and no variation with no power and min temperature C. This was placed underneath the channel. These are the extreme condition. 4.An effort to improve the uniformity of temperature must be done.