Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.

Slides:



Advertisements
Similar presentations
LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
Advertisements

1 LARP Magnet Program G. Ambrosio Many slides from (with a few modifications): Jim Kerby for the LARP Magnet Collaboration 25 October 2006 Rad-Hard Insulation.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Preliminary Design of Nb 3 Sn Quadrupoles for FCC-hh M. Karppinen CERN TE-MSC.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
Long Racetrack (LR) strategy – G. Ambrosio 1 LARP DOE review - FNAL, June 12-14, 2006 BNL - FNAL - LBNL - SLAC OUTLINE: LR R&D goals & plans Long Racetrack.
BNL - FNAL - LBNL - SLAC Long Quadrupole Results & Status Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
F LARP magnet R&D program Giorgio Ambrosio TD/MSD FNAL Annual Program Review September 07 OUTLINE LARP goals FNAL contribution to LARP FNAL core-program.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
BNL - FNAL - LBNL - SLAC Design and Test of the 1 st Nb 3 Sn Long Quadrupole by LARP Giorgio Ambrosio Fermilab Acknowledgement: many people contributed.
ASC 2012Nb 3 Sn IR Quadrupoles for HL-LHC – G. Sabbi 1 Nb 3 Sn IR Quadrupoles for HL-LHC BNL - FNAL - LBNL - SLAC GianLuca Sabbi for the US LHC Accelerator.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
BNL - FNAL - LBNL - SLAC Progress Report on LQ Program Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
LARP DOE Review, 7/9/2012Magnet Systems Introduction – G. Sabbi 1 Magnet Systems Overview and HQ Program GianLuca Sabbi 2012 DOE Review of LARP SLAC, July.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
Superconducting Magnet Group Superconducting magnet development for ex-situ NMR LDRD 2003 Paolo Ferracin, Scott Bartlett 03/31/2003.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
HE-LHC, 10/14/2010GianLuca SabbiUS LARP Magnet Development LHC Accelerator Research Program Magnet Development GianLuca Sabbi for the US LARP collaboration.
LARP CM17, 11/16/2011Magnet Systems Overview – G. Sabbi 1 Magnet Systems Overview GianLuca Sabbi LARP Collaboration Meeting 17 November 16, 2011 BNL -
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
LARP Collaboration Meeting Racetrack Coil Fabrication
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
S. Caspi, LBNL TQS – Progress and plans Shlomo Caspi LBNL Collaboration meeting FNAL April
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
DESIGN STUDIES IR Magnet Design P. Wanderer LARP Collaboration Meeting April 27, 2006.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Long Quadrupole Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
LARP DOE Review, 7/9/2012Long Quadrupole – G. Ambrosio 1 Long Quadrupole Program Giorgio Ambrosio DOE Review of the LARP Program SLAC July 9-10, 2011 LQ.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Many people contributed to this work, most of all the Long Quadrupole Task Leaders:
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
LHC Performance Workshop 2012Nb 3 Sn IR Magnets – G. Sabbi 1 New Magnets for the IR How far are we from the HL-LHC Target? BNL - FNAL - LBNL - SLAC GianLuca.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
TQS Overview and recent progress
TQ Program and Review Charge
Model magnet test results at FNAL
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
J.C. Perez on behalf of SMC collaboration team J.C. Perez
FRESCA2 Update on the dipole design and new calculations
EuroCirCol: 16T dipole based on common coils
the MDP High Field Dipole Demonstrator
MQXF updates P. Ferracin October 9th, 2014.
New Magnets for the IR How far are we from the HL-LHC Target?
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Presentation transcript:

Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting R&D activities Giorgio Ambrosio LARP DOE Review June 5-6, 2007 Outline: - Small Magnets: status and plans - Long Racetrack: status and plans - Other Supporting R&D activities

Racetrack Coil Technology – G. Ambrosio 2 LARP DOE review – FNAL, June. 5-6, 2007 Small Magnets - Goals Provide a means of evaluating conductor and cable under operating conditions similar to the TQ Validate numerical models related to magnet performance Perform training and quench initiation studies Investigate dependence of magnet performance on axial loading Technology development: –New coil parts –Different assembly procedures –Strain gauge R&D –Data analysis with different data acquisition systems –Field quality measurements –Coil alignment with shell-type structure –Coil fabrication tolerances “Small racetracks and small quadrupoles based on these coils: 2-layer, 26 cm long”

Racetrack Coil Technology – G. Ambrosio 3 LARP DOE review – FNAL, June. 5-6, 2007 Small Quadrupoles (SQ) Aluminum shell –Thickness: 22 mm –Outer diameter: 500 mm Iron yokes Stainless steel pads 4 bladders and 8 keys for assembly and pre-load Axial support –4 aluminum rods Diameter: 25 mm –Stainless steel end plate Thickness: 50 mm –Pre-load applied with hydraulic cylinder Strain gauges on shell and rods

Racetrack Coil Technology – G. Ambrosio 4 LARP DOE review – FNAL, June. 5-6, 2007 SQ02 Loading and Quench History Study of end pre-stress effect on magnet training and performance SQ02 –After cool-down Shell: 95 MPa Rods: 125 MPa (270 kN) SQ02b –Increase of  z rod at 293 K Same as TQS01 at 293 K –After cool-down Shell: 95 MPa Rods: 190 MPa (415 kN) SQ02c –Removal of axial rods –After cool-down Shell: 95 MPa Note: Axial loading applied with minimum shell tension Effect on training: - very good memory (consistent with other Nb 3 Sn magnets)  a series of ‘virgin magnets’ should be used to study the effect on 1 st th. cycle - Effect on quench performance can be “disruptive” if end pre-load/support is not sufficient

Racetrack Coil Technology – G. Ambrosio 5 LARP DOE review – FNAL, June. 5-6, 2007 SQ02 Strain Analysis Strain on the pole turn during excitation Results on a path moving along the cable –From the end of the straight section to the tip of the island Model assumptions: –Fr coeff. 0.2 –Separation allowed Peak tensile strain –From 1500 to 4500  strain Peak compressive strain –From -500 to  strain Friction plays an important role (stick-and- slip), but … be aware of the cliff

Racetrack Coil Technology – G. Ambrosio 6 LARP DOE review – FNAL, June. 5-6, 2007 Short-Term Plans: SQ03 Fabrication and test of 4 new coils –108/127 strand Possible candidate for future magnets –Conductor evaluation in operational conditions similar to the TQ/LQ magnets Cabling degradation Transverse stress degradation Short sample current Coil fabrication: by September Test: Oct-Nov.

Racetrack Coil Technology – G. Ambrosio 7 LARP DOE review – FNAL, June. 5-6, 2007 Long-Term Plans PROPOSALS: SRK (FY08): small racetrack to test TQ/LQ keystoned cables Rad-Hard insul. R&D (FY09+): test SQ with rad-hard insulation & impregnation materials that can withstand the expected dose at Max luminosity

Racetrack Coil Technology – G. Ambrosio 8 LARP DOE review – FNAL, June. 5-6, 2007 Rad-Hard Insulation R&D Goal: Develop insulation/impregnation scheme that can withstand the expected dose at Max luminosity Plan A (present mat.)Plan B (new materials) FY07Develop plans, schedule, cost Select alternative material FY08 Q1-Q2 Prepare samples and fixtures FY08 Q3-Q4 Irradiation & tests FY09Small Quad Rad-Hard Insulation Workshop Fermilab, April 20, 2007

Racetrack Coil Technology – G. Ambrosio 9 LARP DOE review – FNAL, June. 5-6, 2007 Long Racetrack - GOALS 1.The main goal is to test long Nb 3 Sn coils  target is to reproduce performance of short coils  magnet performance (training, …) are NOT an issue 2.Coils will be tested in an Al-shell-based supporting structure (preloaded using bladders and keys) in order to verify the use of this concept for long magnets Coil layout: two flat double-layer racetrack coils Technology successfully developed at LBNL and successfully modified at FNAL From 0.3 m to 3.6m Performed at BNL Developed at LBNL

Racetrack Coil Technology – G. Ambrosio 10 LARP DOE review – FNAL, June. 5-6, 2007 SRS01 Description Two double layer racetrack coils. Coil total length m; straight section m. Total length with horseshoe fixture 0.3 m. 21 turns per layer, 42 turns total per coil. Coil and fixture same as SM coils. Two coils tested were configured as common coil. Cable was RRP 54/61, 0.7mm strand OD, Cu/non-Cu ratio 0.89.

Racetrack Coil Technology – G. Ambrosio 11 LARP DOE review – FNAL, June. 5-6, 2007 SRS01 Test Ramp rate dependence due to long twist pitch. Performance at 1 A/s shows successful tech. transfer

Racetrack Coil Technology – G. Ambrosio 12 LARP DOE review – FNAL, June. 5-6, 2007 LR Support Structure Aluminum shell –Single piece –Length: 3.6 m Iron yokes –50 mm thick laminations Iron pads –Half length (1.8 m) Stainless steel skins –Full length (3.6 m) Bladders Keys and shims –Half length (1.8 m)

Racetrack Coil Technology – G. Ambrosio 13 LARP DOE review – FNAL, June. 5-6, 2007 Assembly: tooling & procedures Support structure assembled at LBNL with dummy coils –Tooling and procedures performed very well Tested at BNL at 77 K Dummy coils removed and re-inserted at BNL  Support structure is ready to be used for LRS01

Racetrack Coil Technology – G. Ambrosio 14 LARP DOE review – FNAL, June. 5-6, 2007 Instrumentation for 77 K test Instrumentation of shell and dummy coils –Trace on shell –Strain gauges on dummy coils Six stations along z axis Measurements –Azimuthal and axial shell strain –Horizontal and axial coil strain Dummy coil strain gauge locations

Racetrack Coil Technology – G. Ambrosio 15 LARP DOE review – FNAL, June. 5-6, 2007 FEM analysis of shell strain Aluminum shell in tension after cool-down –Different thermal contraction of aluminum and iron –Friction between shell and yoke Different strain profiles depending on friction factor

Racetrack Coil Technology – G. Ambrosio 16 LARP DOE review – FNAL, June. 5-6, K test results Good agreement between measurement and FEM with 0.2 fr. coeff. Top-bottom asymmetry will be addressed during LRS01 assembly by using bladders on both bottom and top locations Longitudinal variation of azimuthal stress in the shell is within acceptable range ( MPa) High longitudinal tension in shell and dummy coils Shell axial stress (MPa) Shell azimuthal stress (MPa) Dummy coil axial  strain

Racetrack Coil Technology – G. Ambrosio 17 LARP DOE review – FNAL, June. 5-6, 2007 Coil Fabrication Coil Winding: –Winding machine completed. –Coil winding completed. Automatic winding and pneumatic pushers operated nicely. Coil looks good, electrical checks good.

Racetrack Coil Technology – G. Ambrosio 18 LARP DOE review – FNAL, June. 5-6, 2007 Coil Reaction –Oven fabrication and acceptance tests completed temperature uniformity and ramp rate met specs. Achieved +/- 3 deg C at 650 C. –LRS01 coils heat treatment completed

Racetrack Coil Technology – G. Ambrosio 19 LARP DOE review – FNAL, June. 5-6, 2007 Coil Impregnation –Fixture fabrication complete, heaters mounted and wired –Dummy coil sectioned and inspected after impregnation  very good! –Improved bonding between coil and protection heater –LRS01 Coils successfully impregnated

Racetrack Coil Technology – G. Ambrosio 20 LARP DOE review – FNAL, June. 5-6, 2007 Coil & SS Handling Support Fixture Lifting: –Fabrication of beams and collars complete. –Same beams lift react & impreg tooling.

Racetrack Coil Technology – G. Ambrosio 21 LARP DOE review – FNAL, June. 5-6, 2007 Plans SHORT TERM: LRS01 assembly and pre-load: June 12 –LBNL and FNAL people are planning to attend it LRS01 test start: last week of June LONG TERM: Depend on LRS01, TQ02s, LM02 performance –Have all parts and cable available for a new coil

Racetrack Coil Technology – G. Ambrosio 22 LARP DOE review – FNAL, June. 5-6, 2007 FNAL Long Mirror FNAL “Mirror magnet” is a cos-theta dipole where a coil is substituted by iron blocks Plan: 2m – 4m mirror magnets Front view of mirror magnet The plan is to base the scale-up on a well understood design and fabrication technology FNAL successfully fabricated several dipoles and mirror magnets Larger probability of success of the LQ by: Several features complementary to LRs  Diversity & Risk mitigation - conductor, keystoned cable, insulation, coil shape, use of wedges, mechanical structure, Start as soon as possible development and qualification of tooling and infrastructure for Long Quadrupole at FNAL (New 6-m long oven, …)

Racetrack Coil Technology – G. Ambrosio 23 LARP DOE review – FNAL, June. 5-6, 2007 LM01 Test Results LM01 (2m) reached expected SSL at 4.5K –SSL: ~21 kA with 10% degradation (PIT conductor) Similar training to HFDM03 –1m mirror with PIT conductor Some detraining at 1.9K under investigation LM02 (4m) test in Sept-Oct 07 Open marks show quenches in the leads

Racetrack Coil Technology – G. Ambrosio 24 LARP DOE review – FNAL, June. 5-6, 2007 Conclusions Small Magnets: –Useful tools for studying conductors, materials, fabrication issues  plan to continue Scale-up: –To date the scale-up efforts (LR and FNAL LM) are showing encouraging results; –LRS01 test by end of the month –LM02 test in Sept-Oct Long shell: –stress and strain in the long shell and in the dummy coils are in good agreement with FEM results assuming 0.2 fr. –Longitudinal variation of shell azimuthal stress is within acceptable range for the LR