Sopcawind: Software for the optimal place calculation for WIND-farms. FP7- ICT-2011-SME-DCL 296164-D7.2 Six Monthly Report (M6) Abstract Software for the.

Slides:



Advertisements
Similar presentations
Mahmut Ali GÖKÇEIndustrial Systems Engineering Lecture 2 System Identification ISE102 Spring 2007.
Advertisements

CIRAS PROJECT OVERVIEW
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Lecture # 2 : Process Models
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
Two main requirements: 1. Implementation Inspection policies (scheduling algorithms) that will extand the current AutoSched software : Taking to account.
UGDIE KICK-OFF MEETING F-MAN 1 ΑΝΝΕΧ 1-A by UGDIE.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
Understanding of Automation Framework A Storehouse of Vast Knowledge on Software Testing and Quality Assurance.
IEE OffshoreGrid Regulatory Framework for Offshore Grids and Power Markets in Europe: Techno-economic Assessment of Different Design.
Introduction to Computer Technology
United Nations Economic Commission for Europe Statistical Division Applying the GSBPM to Business Register Management Steven Vale UNECE
ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy.
Dr. István Fekete: The Role of Integrated Risk Management in Organizations April11th, Budapest.
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
These slides are designed to accompany Web Engineering: A Practitioner’s Approach (The McGraw-Hill Companies, Inc.) by Roger Pressman and David Lowe, copyright.
Juan Carlos Alonso Eco-Innovation - SIMPPLE - Spain 8th European Forum on Eco-Innovation, Bilbao, Spain April 2010 Making Eco-Innovation happen in.
Creating Scenarios & Simulating the Impacts of Policy: New possibilities with the Environmental Services Trading Simulation (ESTS 3.0) Game Chetan Agarwal.
Confidencial © 2011 TECNALIA 1 TECNALIA. 2 Tecnalia R&I 1st. Research and Technology Organisation in Spain and 5th. in Europe.
A Decision Support Demonstrator for Abiotic Damage to Trees, using a WWW Interface Ari Talkkari Roger Dunham.
Integrating Security Design Into The Software Development Process For E-Commerce Systems By: M.T. Chan, L.F. Kwok (City University of Hong Kong)
Funded by the 7 th Framework Programme of the European Union The CHOICE project Strengthening Chinese Collaboration on ICT R&D with Europe Dr T J Owens.
Acquiring Information Systems and Applications
The ICDP Information Network Telework and Information Management in Scientific Drilling Projects Jens Klump and Ronald Conze GeoForschungsZentrum Potsdam.
ZLOT Prototype Assessment John Carlo Bertot Associate Professor School of Information Studies Florida State University.
26 June 2008 DG REGIO Evaluation Network Meeting Ex-post Evaluation of Cohesion Policy Programmes co-financed by the European Fund for Regional.
September Technical Meeting Slovenia September Session: Application 2. Animal Tracking Santiago Zazo – Universidad Politécnica de Madrid
TESTBED FOR FUTURE INTERNET SERVICES TEFIS at the EU-Canada Future Internet Workshop, March Annika Sällström – Botnia Living Lab at Centre for.
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission Innovations in Automated Planning.
CLARIN work packages. Conference Place yyyy-mm-dd
Abstract Introduction Project Requirements End Product Description Proposed Technical Approach Approach and Considerations Team Members: Travis Djuren.
Systems Life Cycle A2 Module Heathcote Ch.38.
Force Platform & Cloud Computing Presented By Kancharla Sreeveni Student id : Sales Force Team.
K Phone: Web: A Software Package for the Design and Analysis of Microbial Functional.
Software Development Life Cycle by A.Surasit Samaisut Copyrights : All Rights Reserved.
1.- SOPCAWIND FP7 Project, Retrieved on January Z. W Geem, J. H Kim, G. V Loganathan, “A New Heuristic Optimization.
Rational Unified Process Fundamentals Module 7: Process for e-Business Development Rational Unified Process Fundamentals Module 7: Process for e-Business.
EUCISE 2020 EUCISE 2020 has received funding from the European Union’s seventh framework programme under grant agreement no: Participating Countries:
Software for the Optimal Place CAlculation for WIND-farms grant agreement n° Data pooling for the optimal localisation of wind-farms June 6-7, 2012,
Monte-Carlo based Expertise A powerful Tool for System Evaluation & Optimization  Introduction  Features  System Performance.
Due to the financial impact of statements derived from wind atlases, their verification is of high importance. Different wind atlases – reanalysis data.
Process Asad Ur Rehman Chief Technology Officer Feditec Enterprise.
D EMO W IND 2 – Delivering Cost Reduction in Offshore Wind ERA-NET Briefing Event 1 December, 2015 Sally Fenton, DemoWind Co-ordinator For further information,
14-Sept-11 The EGR version 2: an improved way of sharing information on multinational enterprise groups.
Activiti Dima Ionut Daniel. Contents What is Activiti? Activiti Basics Activiti Explorer Activiti Modeler Activiti Designer BPMN 2.0 Activiti Process.
Titre. Geographic Information System GIS offer powerful tools for adding spatial perspectives to: –Planning –Research –Technology transfer –Impact assessment.
BROADCAST MASTER APPLICATION OVERVIEW. Overview Broadcast Master is a complete Channel Management and Ad Sales system providing the ability to manage.
Total Resource and Energy Efficiency Management System for Process Industries The sole responsibility for the content of this document lies with the authors.
Systems Analysis and Design in a Changing World, Fourth Edition
Research & Innovation Action
Fundamentals of Information Systems, Sixth Edition
Understanding of Automation Framework
Robert Szuman – Poznań Supercomputing and Networking Center, Poland
European VIRTA pilot – current situation
Input for “Research and Innovation” – WG of PA 7
Project Information Contact Details
SCORES project presentation
Dependability management in automated border control
Closed Loop Wind Farm Control
1 What is EGR? ESTP course on EGR 6-7 September 2016.
Title of poster... M. Author1, D. Author2, M. Author3
Airport Noise Modelling - Overview
SCORES project presentation
Point 6. Eurostat plans for Time Use Survey data processing and dissemination Working Group on Time Use Surveys 10 April 2013.
Planning process in river basin management
Reportnet 3.0 Database Feasibility Study – Approach
Title of ePoster... M. Author1, D. Author2, M. Author3
DBOS DecisionBrain Optimization Server
ESTP course on EuroGroups Register
Presentation transcript:

Sopcawind: Software for the optimal place calculation for WIND-farms. FP7- ICT-2011-SME-DCL D7.2 Six Monthly Report (M6) Abstract Software for the optimal placement of wind turbines SOPCAWIND Naïma Vande Walle 1, Nicolaz Guidon 1, David de La Vega 2, David Guerra 2, Aritz Rabadan 3, Gábor Nyögéri 4, Valentin Sánchez 5, Diana Manjarres 5, Anika Geib 6 PO. ID 496 Results Sopcawind Software tool – Global Flow Diagram References EWEA 2013, Vienna, Austria: Europe’s Premier Wind Energy Event EWEA 2013, Vienna, Austria: Europe’s Premier Wind Energy Event The development of a wind park is a complex process, during which the screening for potential locations and the design of the best layout configuration are crucial steps. This project definition phase is a two-fold process. Firstly, the selected area must be screened for any constraints which could potentially obstruct or limit project development. Secondly, a trade-off between the yield, costs and the possible environmental impacts must be considered to be able to select the most favourable park layout. The overall objective of the Sopcawind project is to make an operational software tool, which will result in a considerable time reduction and gain in efficiency in the development a new wind park. Within the framework of this FP7 project, relevant, heterogeneous datasets were gathered, standardized and integrated into one common database which is linked to an optimisation tool. The gathered datasets comprise relevant constraints, terrain data, user owned data and wind data. The optimisation tool is an iterative heuristically-based multi-objective algorithm which optimizes the park layout for a number of criteria as chosen by the user. The final result of the tool will be the definition of (an) optimal layout(s) for a selected research area. This will enable project developers and consultancy companies to easily integrate datasets in a systematic way and analyse the development opportunities of a certain research area, using a simple GIS interface. Data selection and acquisition Two validation zones have been selected: Flanders and Basque country  Complete database should be available for these areas 142 datasets for 5 different coverage (Europe, Spain, Belgium, Flanders and Basque country) areas have been analyzed 96.5% of the datasets have been harvested or agreed to be transferred when needed for their inclusion in the SOPCAWIND data pool A non-automatic update procedure has been added. This will enable the project developer to systematically update the database Wind data for Europe based on MERRA data. For validation areas: 2km x 2km, 10min temporal resolution A design procedure has been defined: Input constraints are divided into different categories: Dataset management and integration Definition of data integration, transformation and harmonisation processes First test version of the database has been deployed Creation of a draft API for dataset download Open Source Technologies: PostGIS Optimisation tool The optimisation tool based on a meta-heuristic multi-objective algorithm relies on different modules: Cost module: The cost for the complete wind farm including operational costs, purchase cost, cost of cabling, etc. Yield module: Different calculation methods have been evaluated and a selection was done based on time, accuracy (represent wind potential variation within the project area), integration in overall design process.  Algorithm 1: Creation of a wind map for a certain area  Algorithm 2: Calculation of a yield value for a predefined park layout GIS Module: This module comprise the terrain info and the restrictions associated with the specific surroundings Impact module: Calculates the possible impact of the wind farm eg. Flickering, and telecommunication services Website Development Website: Will be used as users portal  the user will enter the tool via web-based interface Open Source Technologies: Java, OpenLayers, Geoserver, Spring Framework, PostgreSQL, etc. Prototype of the Sopcawind tool has been developed Acknowledgement Conclusions Relevant datasets for wind farm design have been identified, described and gathered in the Sopcawind database. A first test version of the designed database has been developed and is currently being tested. The definition for the separate modules of the optimization algorithm has been done and the algorithms are currently being created. A first prototype of the complete tool and a pre-test is scheduled to be ready by May However, the complete, web based interface tool, validated based on real case scenarios, will be up and running by May Optima Area TECNALIA RESEARCH & INNOVATION Zamudio (Bizkaia, Spain) {valentin.sanchez, 1 3E Brussels (Belgium) {Naima.VandeWalle, 2 UPV/EHU Bilbao (Bizkaia, Spain) {david.delavega, 3 EUROHELP Consulting Donostia-San Sebastián (Gipuzkoa, Spain) 4 GEOX KFT Budapest (Hungary) 6 ANEMOS Reppenstedt (Germany) The development of the Sopcawind tool is divided in the following steps: 1)Identification of the relevant datasets and creation of the Sopcawind database 2)Selection of the project area by means of the application of several first and second level constraints 3)Development of the optimization algorithm based on conflicting criteria such as the maximization of the yield and the minimization of the overall cost 4)Selection of the optimal park layouts 5)Application of impact studies related to flickering and telecommunication services The research leading to these results has received funding from the European Union Seventh Framework Programme ([FP7/ ] [FP7/ ]) under grant agreement n°296164