Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.

Slides:



Advertisements
Similar presentations
Sistan & Balouchestan Electric Power Distribution Company
Advertisements

 E4 Electrical Installation #1 Power Distribution.
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
Ward 21 Reliability Cedarvale and Surrounding Area Prepared for Councillor Mihevc Toronto Hydro System Planning March 25, 2015.
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
Lecture 26 Distribution Systems Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Assumption University Thailand EE4503 Electrical Systems Design Introduction 1.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
Distributed Power Systems ELCT 908
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
Potential Underground Wiring Meeting with Residents Wednesday, September 15, 2010 lionsbay.ca Lower Lions Bay Water Line Replacement The Village of Lions.
Dayton Power and Light Patrick Slone EMS Safety Coordinator.
1 Introduction to Power Systems Expensive! Influential!Intrusive! Source: Riadh W. Y. Habash, Electromagnetic Fields and Radiation, Marcel Dekker, New.
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
ELG4125 Transmission and Distribution Systems
Subtransmission Reliability Criteria
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
What makes substation work?
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
Lyndonville Electric Department Feasibility Analysis Review December 2,
January 2009 SEMO Ice Storm Extreme Measures IEEE-PES St Louis Chapter Meeting June 18, 2010 Presented by David Wakeman Vice President, Energy Delivery.
1 Service Delivery Point(s) for Multi-tenant Facilities An Overview Matt Imel Sr. Tariff Specialist PG&E December 8, 2011.
Substation Inspection Program. Mission Substation Incident The event occurred on December 20, 2003 during the peak Christmas shopping season A fire occurred.
FPSC Electric Utility Infrastructure Workshop Florida Municipal Electric Utilities Alan Shaffer Assistant General Manager - Delivery Lakeland Electric.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Steady State Analysis Of A Microgrid Connected To A Power System
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
Distribution Systems-General
SERVICE ENTRANCE EQUIPMENT
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Submitted To:- Submitted By:- Mr.
- Discuss the measurement of power in circuits - Learn how to construct parallel circuits and how they behave differently from series circuits - Define.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
What makes substation work?
FOR OVER 100 YEARS…LIFE. POWERED BY EDISON. Southern California Edison Presentation to City of Palos Verdes Estates December 13, 2011 Marvin Jackmon, Regional.
Presentation Topic: Circuit Breakers Represented to: Dr. M. Riaz Khan Represented by: M. Mujahid.
Switches and Over Current Protective Devices Class Instructor ALPHER E. DE VERA, uap.
Interconnected Generation Preliminary Engineering Work Related to Fees.
Science A Physics – P1 Science A Physics – P1 Topic 2b : Transmission of Electricity Topic 2b : Transmission of Electricity.
ELECTRICAL INSTRUMENTS ( service and utilization )
Electrical Power System
URBAN DESIGN Non-standard (Alternative) and Aesthetic Liafis A Ogboye, P.E.
A Project on Underground Distribution System Presented by 1.Venkateswara Rao Kudarapu 2.Aditya KVL 3.Tharun M 4.Neeraj.D.
Sub Station.
RESIDENTIAL ELECTRICAL SERVICE
SUB-STATIONS.
Chapter # 25 Sub-Stations risemark.pbworks.com.
Electric Utility Master Plan Update
Interconnect Protection of Dispersed Generators
Power Generation and Distribution
Background B513 built in early 1970’s for mainframe era.
Subteam 1a Competitive Solicitations Framework Working Group Meeting
E4 Electrical Installation
Basics of electrical engineering
HIGH DENSITY (ZERO LOT LINE) CONSTRUCTION
Pacific Power Seismic Preparedness Update
Conductor A material, such as copper, that permits the flow of electricity; usually refers to the a wire.
EET 323 – Electrical System Design Lecture 11: Panel-boards and Switch-boards Instructor: Radian Belu, PhD.
Review of Distribution Network Protection
Hamilton County / National Grid Meeting
Presentation transcript:

Nelson Hydro Downtown Conversion July 26, 2010 Project Overview

Introduction –This project consists of upgrading the electrical distribution system in the City of Nelson downtown core, –The existing lane structures have overhead primary and secondary lines, and transformation mounted on poles and overhead platforms, –These will be replaced with a system having overhead secondary lines, underground primary lines, and pad mounted transformers, –The primary supply voltage will be changed from 4 kV to 25 kV.

Hydro T&D Upgrades The Downtown Conversion is part of the Long Term Hydro T&D Upgrade plan: Transmission line upgrades (nearly complete), Voltage conversions (Front St. 2009, Downtown 2010/11, Uphill 2012), Rosemont Sub rebuild (2010/12), We are about mid way through this plan: Completion of the Downtown Conversion and the Rosemont substation upgrade will move us close to completion.

Project Need –The Downtown distribution needs to be upgraded for several reasons: 1.The pole structures are at the end of their service life, 2.Upgrading the distribution voltage will improve logistics, and help move towards retiring the City Substation at Victoria and Josephine Streets, 3.Due to age and damage the structures are concerns for safety, 4.Moving to 25 kV distribution will result in a reduction of distribution losses.

Project Need

Scope of Project

Scope of Project Pole Replacement

Other Benefits The new design will have fewer conductors running down the Lanes. This will allow: Single pole structures instead of two pole structures – provides more free space at ground level, and easier access to parking areas, Fewer wires and no transformers in the air will have a tidier appearance, Improved electrical service reliability in the downtown area, Improved lane way lighting, The upgraded distribution voltage provides better ability to serve new / changing loads downtown.

Design Details New structures will be a single pole line with wire arranged vertically. (Existing arrangement uses two pole structures with a combination of horizontal and vertical wire configurations), Secondary circuits (customer voltage) will run overhead down the lanes. (Existing design also does this), Primary circuits (distribution system) will be in underground ducts running beneath the streets. (Existing system has these primary circuits overhead in the lanes), Transformers will be located on ground level islands where each island will feed roughly 1 block. (Existing system has multiple overhead transformer banks mounted on poles and platforms).

Design Details – Pad Mount Transformers Before 400 Block Kootenay Street After 400 Block Kootenay Street

Design Details – Lane Lines Existing Structures New Structures

Cultural & Decorative The CDC has proposed that they be tasked with decorating the transformer island with a cultural theme. This will include placing the history of Nelson Hydro on several of the transformers, and keeping several transformers for other cultural themes. We would like to install new lighting in the lanes with a historic theme. Costs for the lamp fixtures similar to the style used on Baker street are exorbitant. We are continuing to look for an option that has a more historical theme than the existing fixtures but has reasonable cost.

Customer Impacts Construction in lanes and streets. This will mean inconveniences due to restricted parking, some limited access for deliveries, and typical construction site hazards and delays, Power outages during the switch over to the new system in These outages will be kept to a minimum, and will be of short duration, There will be a time where two sets of poles will obstruct the lanes. Both the existing and new structures must be in place in order to keep the conversion outage time to a minimum, Street paving and sidewalk repair will occur after the civil construction.

Project Schedule 2009 /10: Acquire Materials Aug 2010: Install New Poles in Lanes Sep 2010: Commence Civil Works (ducts, transformer pads) Spring 2011: Electrical Installation (underground and overhead lines) Summer 2011: Move customers over to new system Fall 2011: Telus and Shaw transfer to new poles 2011/12: Remove old infrastructure (two pole structures, & wire)

Nelson Hydro Downtown Conversion