1 Railway infrastructure charging schemes in Hungary Krisztián Urvald MÁV Co., Hungarian State Railways Customer Relations and Sales Brigitta Klempa VPE.

Slides:



Advertisements
Similar presentations
Intermodality in the area of Záhony Judit Thomka Regional Development Holding Ltd. Usti Nad Labem 17th April 2009.
Advertisements

BUDGETING Training Unit 13.2 Principles and financial rules of mobility.
May 2005 The French Water Services: Main present challenges.
European Commission - Directorate General for Energy and Transport EIA Round Table « Development of North-South Freightways » Port of Copenhagen, 30 October.
The Process of Including Pan-European Corridor X (Xa) in the Rail Freight Corridor Network (in Line with Regulation 913/2010/EU)
The Network Statement (JNB) contains the terms and conditions for the operation of the railway. Each year a new edition is released, which is the basis.
STUDY ON COMPETITION IN RAILWAY FREIGHT TRANSPORT IN SPAIN ICN, Sydney, May 1st 2015 María Sobrino Ruiz Head of Market Studies Unit CNMC.
1 Railway infrastructure charging and state subvention schemes in Hungary Dr. Péter Rónai MÁV Co., Hungarian State Railways Head of Customer Relations.
1 Directorate-General for Energy and Transport / Air Transport Directorate EU Directive on Airport Charges Background and content.
Impastato Vivaldi Regulation and administrative provisions regarding Italian Railway 1 Stefano Impastato - University of Rome “La Sapienza” Mario Vivaldi.
How to make increase railways sustainable
Transport Track access charges for Bulgarian railways Seminar, Sofia, 21 January 2015 Infrastructure charges under Directive 2012/34/EU – Single European.
EP Transport Committee Fourth Railway Package - public hearing Brussels, 7 May 2013 Better governance of the railways – a freight perspective Tony Berkeley.
The European Railway Agency in development
National trends in passenger transport regarding the choice of transport mode Grant Agreement number: Project Acronym: USEmobility Project title:
IMPRINT-EUROPESeminar, October 2003, Budapest 1 Some Information Aspects of Railway Infrastructure Charging in Czech Republic ing.Robert Číhal CSc.
MÁV-TRAKCIÓ Railway Traction Private Company Limited by Shares.
1 EU S UPPORT TO STRENGTHENING COMPETITION IN S ERBIA Arpad Hargita EU-SCS A project financed by EU Implementing consortium lead by Hungarian Practice:
Harmonisation of the Public Transportation of Slovenia with the EU: A Need for New Financing and Organisation Solutions ? Stanislav Bozicnik University.
EU 3 rd Energy Package in the context of the tax problems of cross-border energy supplies REPORTER: KUROCHKIN DENIS ALEKSEEVICH EURASIAN RESEARCH CENTRE.
RAILWAY UNDERTAKINGS & INFORMATION EXCHANGE ICT Interoperability Issues in Rail Freight - European Railway Conference.
Chapter 2 Documents of Import & Export
Chart 1 Why Intermodal Traffic Volume in Germany (More Than) Doubled Within 10 Years! Rainer Mertel KombiConsult GmbH, Frankfurt am Main
Short summary of RFC 7 Orient-East/Med Corridor 11.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
COST CONCEPTS SANJAY UPRETI PAM. Some important cost concepts Fixed Cost Fixed costs are such costs which will still have to be incurred even if the production.
4 th FTS – CEER bilateral meeting Sergey G. Novikov Head of the FTS of Russia Florence February,
2012 On track for more!. Ministry of Transport and Communications Avinor AS (airports) Public Road Administration Norwegian Coastal Administration Train.
TAC and influence on RU’s in NL 21 th of Januari 2015Aldert Gritter.
Serbian Railways – “The Start of our Future” Belgrade, 16/04/2015.
1 An introduction to Project Cycle Management PCM DAY 3 Gori, 31/3 – 3/4/2015.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
REPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING Directorate for European Affairs and Investments Department for Energy Efficiency.
ROUND TABLE 1 DEVELOPING HIGH SPEED NETWORK IN SPAIN Luis de Santiago Pérez Director General of Railways Ministry of Fomento (Spain)
EXECUTIVE ROUNDTABLE SERIES Aviation in the EU Emission Trading Scheme Sophie Hagège, M&A Partner June 3, 2010 KEY LEGAL CONSIDERATIONS GOVERNING THE NEXT.
SABIEDRISKO PAKALPOJUMU REGULESANAS KOMISIJA Andrejs Dombrovskis expert Telecommunications and Postal Department Public Utilities Commission Electronic.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
HŽ Passenger Transport – overviewBUCHAREST HŽ PASSENGER TRANSPORT.
Working Party on Rail Transport – 63rd session Geneva, 18 November 2009 EUROPEAN COMMISSION.
Transport Modification of the PSO Regulation in the framework of the 4 th railway package Jan Scherp European Commission, DG Transport and Mobility Roundtable.
SEMINAR 21/01/2015 Railway infrastructure – key to achieve sustainable transport Track Access Charges for the Bulgarian Railways – Technical Assistance.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
EU/EBRD Municipal Finance Facility - Energy Efficiency ENVIRON CONSORTIUM Ildikó Adamecz Raj Partner, Director Corporate Finance BDO Hungary Advisory Ltd.
The Fourth Railway Package - National Regulatory Body’s Perspective Dr Iris Henseler-Unger, Federal Network Agency, Vice President.
Baltic Electricity Market Mini-Forum June 3, 2006 Riga, Latvia Electricity Licensing Rules in Lithuania Kestutis Zilenas Head of Licensing department National.
EFRTC European Federation of Railway Trackworks Contractors General Meeting Porto 5th June Presentation of Railway Infrastructure Manager from Hungary.
Track Access Charges in European Union Adriaan Roest Crollius Zoetermeer, 16 September 2015 The responsibility for the contents of this report lies with.
Ainārs Meņģelsons Public Utilities Commission Latvia 10th Baltic ERI June 4, 2010 Kuressare, Estonia IMPLEMENTATION OF 3-rd EC PACKAGE IN LATVIA.
Study on Regulatory Options for Further Market Opening in Rail Passenger Transport Stakeholder Meeting 10 February 2010 Session 2B Great Britain Case Study.
Rail Cargo Austria AG Railway Conference, Moskau – 23 rd of October 2014 Reinhard Bamberger, Board Member RCA AG.
GYSEV & BIKERS Németh Béla Project manager. Presentation Contents About GYSEV Projects Developments.
Calculation and methodology of the storage charges in the Hungarian gas sector
COSITU Khurshid M Ashraf Niyaz Omantel/ITU The ITU model for the calculation of telecommunication services costs, tariffs and interconnection charges.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 14 – Transport Bilateral screening:
Growth opportunities in South East Europe ANTAL, Dániel p r e s i d e n t W i e n, 28th January 2008.
- Special Education Needs (SEN) Network Administrative and Financial Aspects.
1 ERFA Annual Event Brussels, Welcome. Irmtraut Tonndorf ERFA Chair.
PRODUCER GROUPS AND ORGANIZATIONS IN THE AGRICULTURE OF IN HUNGARY.
in Croatian Track access charging system
TRANSPORT SCIENCE: INNOVATIVE BUSINESS SOLUTIONS
Maria Price, DPhil. (Oxon.) Head of EU Policies and Public Affairs
The intermodal logistics capacity in the region of Záhony
The competition enforcement in regulated sectors
THE EIB’s ACTIVITIES IN POLAND
MARGINAL COST PRICING TUOMO SUVANTO
Meeting of the WG on Rail Transport Statistics 2-3 April 2009
Non-RU Applicant (NRA), PCS UG
Institutional arrangements of external trade statistics in Hungary
Zsófia Ercsey - KSH – Hungary Marie-Madeleine Fuger - INSEE – France
Zsófia Ercsey - KSH – Hungary Marie-Madeleine Fuger - INSEE – France
Presentation transcript:

1 Railway infrastructure charging schemes in Hungary Krisztián Urvald MÁV Co., Hungarian State Railways Customer Relations and Sales Brigitta Klempa VPE Ltd., Rail Capacity Allocation Office Charging Section

2 Traffic volume on MÁV Co’s network Total number of trains (pieces) 1st January – 30th June, 2014 Source: PASS2

September, Number of foreign partners: AWT RAIL HU Zrt. BOBO Kft. boxXpress.de GmbH BSS 2000 Kft. CER Hungary Zrt. CRW, a.s. DB Schenker Rail Hungária Kft. DRT Danubius Rail Transport Kft. Floyd Zrt. FOXrail Zrt G&G Kft. GYSEV Zrt. GYSEV Cargo Zrt. KÁRPÁT Vasút Kft. LTE GmbH MÁV FKG Kft. MÁV Nosztalgia Kft. MÁV-START Zrt. METRANS (Danubia), a.s. MMV Zrt. MTMG Zrt. Magyar Vasúti Áruszállító Kft. PKP Cargo S.A. Petrolsped, s.r.o. PSZ, a.s. Rail Cargo Hungaria Zrt. Rail Cargo Carrier Kft. Railtrans International, a.s. RTS GmbH Swietelsky Vasúttechnika Kft. SZDS, a.s. Szentesi Vasútépítő Kft. Train Hungary Kft. Vasútvill Kft. Wiener Lokalbahnen Cargo GmbH Záhony-Port Zrt. ZSSK Cargo, a.s MÁV-GÉPÉSZET Zrt. MÁV-TRAKCIÓ Zrt. MÁV-START Zrt. Expansion of MÁV Co’s customers having network access contract

4 Incumbent’s share in revenue from freight network access charges 2013 Tendency: decreasing

5 Legal background To enable independent railway undertakings to have access to the railway network on a non-discriminatory basis (e.g. telecommunication sector, energy sector) [Directive 2001/14/EC] Non-discriminatory access to service facilities (e.g. transhipment sidings, freight terminals) irrespective of the ownership Independence of essential functions of the infrastructure manager: key infrastructure activities (e.g. capacity allocation- timetabling; charging) are independent of any railway undertaking in legal form, organisation or decision-making functions [Directive 2012/34/EU (Recast)] Act CLXXXIII of 2005 on rail transport Charging statute 83/2007 (X.6.) and its modifications Capacity allocation statute 101/2007 (XII. 22.) The basic principles of capacity allocation and charging are laid down in laws on every level of the relevant legislation hierarchy

6 CM Methodological document of network access charges – five-year CD Detailed calculations and data providing the basic of them – yearly Charging Methodology (CM) Charging Document (CD) Cost-based allocated unit prices Direct and indirect costs of infrastructure services Data of actual year costs and state subsidy State subsidy is divided based on transport political principles

7 Process of calculation Data request Based on CM Table for data providing Data supply IM: costs and performances Ministry: state subsidy Calculation Charges and mark-ups What market can bear Constructing of CD

8 Change in the methodology The base of charge calculation is the total reasonable cost. Total reasonable cost-based charging Direct cost-based charging The base of calculation is the costs directly incurred as a result of operating train service. In case of the charges for the minimum access package and for access to infrastructure connecting service facilities

9 Cost structure Cost content of services Variable cost component Fixed cost component Direct costs Connected to one service C1C3 Connected to more services C2C4 Indirect costs Operational costs-C5

10 Calculation methodology CHARGE Variable cost component of direct cost MARK-UP Indirect cost Fixed cost component of direct cost AMOUNT TO BE PAID STATE CONTRIBUTION Transpor t policy

11 Charge of the use of catenary Direct costs Indirect costs : Performance indicator = / = + Mark-up 0, State contribution 0,16 0,18 EUR (57 HUF) /electric train km CM CD (Electric train km) Charge / = Thousand EUR 1 EUR=320 HUF (Hungarian National Bank average currency rate 6th-15th January, 2015) Total reasonable cost based approach Direct cost based approach 0,18 EUR Direct costs – variable part Direct costs – fixed part ,08 0,26 0,16 0,18 EUR

12 Basic services – Minimum access package Services ChargeMark-up State contribution Amount to be paid Charge for ensuring train path (EUR/train path) 0,292,090,591,79 Charge for running of trains Gross ton km based charges 0, , , , Train km based charges Passenger trains Category I 0,411,140,301,25 Category II 0,441,150,491,09 Category III 0,380,940,930,39 Freight trains Category I 0,491,370,641,22 Category II 0,611,420,871,16 Category III 0,751,561,680,63 Loco trains 0,401,090,381,12 CD 2014/2015 timetable year, in EUR ( 1 EUR=320 HUF)

13 THANK YOU FOR YOUR ATTENTION! Brigitta Klempa Krisztián Urvald