Rainfall-Runoff Modeling

Slides:



Advertisements
Similar presentations
Hydrology Rainfall Analysis (1)
Advertisements

Hydrology Rainfall - Runoff Modeling (I)
Hydrology Rainfall - Runoff Modeling (II) Synthetic unit hydrographs
The Flood hydrograph A brief explanation-
Hydrologic Analysis Dr. Bedient CEVE 101 Fall 2013.
Unit Hydrograph Reading: Applied Hydrology Sections , 7.5, 7.7,
Chapter Two Hydrograph Convolution and Deconvolution
CHARACTERISTICS OF RUNOFF
Unit Hydrograph The Unit Hydrograph Unit Hydrograph Derivation
Rainfall – runoff modelling
Watershed Management Runoff models
Applied Hydrology RSLAB-NTU Lab for Remote Sensing Hydrology and Spatial Modeling 1 Rainfall-Runoff Modeling (2) Professor Ke-Sheng Cheng Dept. of Bioenvironmental.
Hyetographs & Hydrographs
Unit Hydrograph Reading: Sections , 7.5, 7.7,
Problem 1- Tabulated below are total rainfall intensities during each hour of a frontal storm over a drainage basin.
Hydrograph Interpretation.
Rainfall Climatology Average annual precipitation 30-year normal precipitation.
Ch  Know how to determine peak flow using the rational method 2.
1 Highway Drainage: Determining Flow Rates Ch. 8.
Reading: Applied Hydrology, Sec 15-1 to 15-5
Lecture ERS 482/682 (Fall 2002) Rainfall-runoff modeling ERS 482/682 Small Watershed Hydrology.
UH Unit Hydrograph Model Response Functions of Linear Systems Basic operational rules:  Principle of Proportionality: f(cQ ) = c  f(Q)  Principle of.
Precipitation statistics Cumulative probability of events Exceedance probability Return period Depth-Duration-Frequency Analysis.
Synthetic Unit Hydrographs
CE 3372 – Lecture 10. Outline  Hydrology Review  Rational Method  Regression Equations  Hydrographs.
Estimating Qmax Using the Rational Method
Basic Hydrology & Hydraulics: DES 601
FLOOD Mrinmoy Majumder Definition High stage in river when the river overflows and inundates the adjoining area Flood peak and frequency.
Flood hydrographsHydrosphere. Flood hydrographs show the effect that precipitation has on the water levels in a river. After a storm the water levels.
Precipitation Types Important for Real Time Input and Forecasting
Urban Storm Drain Design: Rainfall-Runoff relations.
Frequency Analysis and Data Reading: Applied Hydrology Sections
Review of SWRCB Water Availability Analysis Emphasis on Dry Creek Water Availability Analysis.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
Synthetic UH Definition: Synthetic Hydrograph is a plot of flow versus time and generated based on a minimal use of streamflow data. Example: A pending.
Basic Hydrology: Rainfall-Runoff – I
Comparisons of Simulation Results Using the NWS Hydrology Laboratory's Research Modeling System (HL-RMS) Hydrology Laboratory Office of Hydrologic Development.
Rainfall-Runoff modeling Forecasting and predictingForecasting and predicting –Flood peaks –Runoff volumes Due to Large rain and snowmelt events ***especially.
HYDROGRAPH is a graph showing the rate of flow (discharge) versus time past a specific point in a river, or other channel or conduit carrying flow. It.
-1 DR. S & S. S GHANDHY GOVT. ENGINEERING COLLEGE, SURAT. SUB : HYDROLOGY & WATER RESOURCES ENGINEERING ( ) TOPIC : HYETOGRAPH & HYDROGRAPH ANALYSIS.
Hydrology & Water Resources Engineering ( )
Sanitary Engineering Lecture 4
HYDROLOGY Lecture 10 Unit Hydrograph
Rainfall-Runoff modeling
Modified Rational Method
Routing surface runoff to a basin outlet
Construction Analysis Hydrographs
Water supply Flood prediction and forecasting. Water quality
Hydrologic Analysis (Bedient chapter 2)
S Curves From Mays, 2011, Ground and Surface Water Hydrology.
Basic Hydrology & Hydraulics: DES 601
Modified Rational Method
Using a unit hydrograph to determine storm streamflow
Rainfall-Runoff Modeling
CTC 450 Review Distributing flow in a pipe network Hardy-Cross Method
Chapter 3 -Hydrology Hwk#3 - pp ,4,7,11 Hydrologic Cycle
Highway Drainage: Determining Flow Rates
INTRODUCTION TO HYDROLOGY
Test 1 Results Mean 29.8 Std dev 3.5.
SCS Dimensionless Unit Hydrograph
Determining Peak Flows
Hyetographs & Hydrographs
SCS Dimensionless Unit Hydrograph
Find: Qp [cfs] shed area tc C 1,050 1,200 1,300 1,450 A B C Q [acre]
Preciptation.
Love Field Modernization Program
Preciptation.
Preciptation.
HEC-HMS Runoff Computation Modeling Direct Runoff with HEC-HMS Empirical models Empirical models - traditional UH models - traditional UH models - a.
WinTR-20 Project Formulation Hydrology Using WinTR-20 for Small Watersheds What is Small ?? Some individuals are using WinTR-20 for subdivision planning.
Presentation transcript:

Rainfall-Runoff Modeling Watershed Rainfall Runoff Rainfall-Runoff Model Rainfall Runoff Rainfall-Runoff

Modeling Considerations Development of a rainfall-runoff model depends on (1) Time scale (2) Basin scale For larger time scale (month, year, or longer) Runoff = f(Rainfall); VQ = g(VRain) For shorter time scale (eg. Storm events) Runoff Hydrograph = f( Rainfall Hyetograph) Q(t) = f [ I(1), I(2), …, I(t) ] Rainfall-Runoff

Rational Formula First proposed by Kuichling in 1889 Qp = k C i A where k = unit conversion factor, 1.008 for English unit; 0.278 for metric unit Qp = peak discharge (ft3/s or m3/s); i = rainfall intensity (in/hr or mm/hr) A = drainage area (acres or km2) Note: i = average intensity of rainfall corresponding to the duration of time-to-concentration. Rainfall-Runoff

Time-of-Concentration Definition: It is an elusive hydrologic variable and it is very difficult to measure. Rainfall-Runoff

Time-of-Concentration Methods (1) Rainfall-Runoff

Time-of-Concentration Methods (2) Rainfall-Runoff

Time-of-Concentration Methods (3) Rainfall-Runoff

Comparison of Time-of-Concentration Models Rainfall-Runoff

Time-Area Method Can be considered as an extension of the rational method in which rainfall intensity in not uniform over the storm duration Rainfall-Runoff

Time-Area Method (Eg. 1) Rainfall-Runoff

Time-Area Method (Eg. 2) Rainfall-Runoff

Time-Area Method (Eg. 3) Rainfall-Runoff

Time-Area Method (Eg. 4) Rainfall-Runoff