WinTR-20 Computation Differences March 2009 1 WinTR-20 Project Formulation Hydrology Computer Program Will TR-20 and WinTR-20 give the same results ??

Slides:



Advertisements
Similar presentations
Unit Hydrographs Ch-7 (Streamflow Estimation)
Advertisements

Hydrology Model Basic Tutorial
NWS Calibration Workshop, LMRFC March 2009 Slide 1 Calibration of Local Areas 1 2 Headwater basin Local area.
WinTR-20 Course February Muskingum-Cunge Flood Routing Procedure in NRCS Hydrologic Models Prepared by William Merkel USDA-NRCS National Water Quality.
Hydrologic Analysis Dr. Bedient CEVE 101 Fall 2013.
CHARACTERISTICS OF RUNOFF
1 Profit Maximization We assume the goal of a firm is to maximize its profit. To do so it will have to decide what level of output the produce. We look.
WinTR-20 Project Formulation Hydrology Program to
WinTR-20 Project Formulation Hydrology Computer Program
© Janice Regan, CMPT 102, Sept CMPT 102 Introduction to Scientific Computer Programming Examples of loops and nested loops.
Hydrologic Routing Reading: Applied Hydrology Sections 8.1, 8.2, 8.4.
Reading: Applied Hydrology Sections 8.1, 8.2, 8.4
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
WinTR-20 Advanced Features June WinTR-20 Project Formulation Hydrology Computer Program Advanced Features Presented by: WinTR-20 Development Team.
Summary of Topics - HEC-HMS
1 Import NRCC Data February 2015 Obtaining NRCC Rainfall Data and Importing it into WinTR-20.
WinTR-20 SensitivityMarch WinTR-20 Sensitivity to Input Parameters.
Channel Routing Simulate the movement of water through a channel
Chapter 7 Production Theory
WinTR-20 Advanced Features March WinTR-20 Project Formulation Hydrology Computer Program Advanced Features Presented by: WinTR-20 Development Team.
WinTR-20 Data Converter May WinTR-20 Project Formulation Hydrology Converting Old TR-20 Input Files to New WinTR-20 Format Presented by: WinTR-20.
WinTR-20 Project Formulation Hydrology Computer Program Overview Presented by: WinTR-20 Development Team.
Copyright © Cengage Learning. All rights reserved. 2 Organizing Data.
March 2009WinTR-20 Course1 Muskingum-Cunge Flood Routing Procedure in NRCS Hydrologic Models Prepared by William Merkel USDA-NRCS National Water Quality.
__________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS COMPLEX WATERSHEDS SITES IN SERIES.
WinTR-20 Project Formulation Hydrology Computer Program Overview Presented by: WinTR-20 Development Team.
March 2003HEC-RAS Version 3.1 Other Features of HEC-RAS- part 2 Cross Section Interpolation Multiple Plans Supporting Pictures.
Channel Routing Simulate the movement of water through a channel
Channel Routing Simulate the movement of water through a channel
WinTR-20 PS, SD, FB HydrographsJune WinTR-20 Principal Spillway, Stability Design, and Freeboard Hydrographs Presented by: WinTR-20 Development Team.
WinTR-20 SensitivityFebruary WinTR-20 Sensitivity to Input Parameters.
DES 606 : Watershed Modeling with HEC-HMS
1 Import NOAA Atlas 14 Data June 2015 Obtaining NOAA Atlas 14 Rainfall Data and Importing it into WinTR-20 Presented by: WinTR-20 Development Team.
MTH 251 – Differential Calculus Chapter 4 – Applications of Derivatives Section 4.1 Extreme Values of Functions Copyright © 2010 by Ron Wallace, all rights.
1 TR-55 Urban Hydrology for Small Watersheds. 2 Simplified methods for estimating runoff and peak discharge for small urban/urbanizing watersheds Ch 1.
Hydrological Forecasting. Introduction: How to use knowledge to predict from existing data, what will happen in future?. This is a fundamental problem.
1 Detention Routing
ERT 246 Hydrology & Water Resources Eng.
(Unit 6) Formulas and Definitions:. Association. A connection between data values.
12 FURTHER MATHEMATICS Nominal and effective interest rates.
UNIT – III FLOODS Types of floods Following are the various types of floods: 1.Probable Maximum Flood (PMF):This is the flood resulting from the most sever.
WATER RESOURCES DEPARTMENT
Basic Hydrology: Rainfall-runoff based methods – III
Detention Basics
WinTR-20 Project Formulation Hydrology Computer Program
WinTR-55 Small Watershed Hydrology
Water supply Flood prediction and forecasting. Water quality
Channel Routing Simulate the movement of water through a channel
TR-55 Urban Hydrology for Small Watersheds
Design Rainfall Distributions Based on NRCC Data
EFH-2 Overview Quan D. Quan Hydraulic Engineer USDA – NRCS – WNTSC
03/02/2006 Flow Routing Reading: 8.1, 8.4, 9.1, 9.2.
Channel Routing Simulate the movement of water through a channel
FLOOD ROUTING Topic 5 River/Stream Routing Muskingum Method.
Using Northeast Regional Climate Center (NRCC) Data with WinTR-20
Using Northeast Regional Climate Center (NRCC) Data with WinTR-55
CEE 3430 – Engineering Hydrology David Rosenberg March 26, 2012
Hydrologic River Routing
Channel Routing Simulate the movement of water through a channel
Section 4.3 Optimization.
Ratio, Proportion, and Other Applied Problems
Floods and Flood Routing
Find: Omax [cfs] Given Data 29,000 33,000 37,000 41,000 inflow outflow
Flood Routing.
Hydrographs River Discharge = cross sectional area X
3 Chapter Chapter 2 Graphing.
HEC-HMS Runoff Computation Modeling Direct Runoff with HEC-HMS Empirical models Empirical models - traditional UH models - traditional UH models - a.
WinTR-20 Project Formulation Hydrology Using WinTR-20 for Small Watersheds What is Small ?? Some individuals are using WinTR-20 for subdivision planning.
Frequency Distributions
Presentation transcript:

WinTR-20 Computation Differences March WinTR-20 Project Formulation Hydrology Computer Program Will TR-20 and WinTR-20 give the same results ?? Presented by: WinTR-20 Development Team

WinTR-20 Computation Differences March WinTR-20 Computation Differences Runoff hydrographs Adding hydrographs Diverting or dividing hydrographs Structure Routing Reach Routing

WinTR-20 Computation Differences March Runoff Hydrographs With the same delta t, TR-20 and WinTR- 20 will produce equal hydrographs. However, the delta t is rarely the same. Delta t is set by the user in TR-20. Delta t is 6 % of the Tc in WinTR-20.

WinTR-20 Computation Differences March Runoff Hydrographs (continued) The minimum practical delta t in TR-20 is 0.1 hour. There is no practical limit to delta t in WinTR- 20 (delta t is set within WinTR-20). For example, if Tc is 0.1 hour then delta t will be hour. This will cause peak discharges to be slightly higher (generally 5% or less) in WinTR-20 for small Tc’s.

WinTR-20 Computation Differences March Runoff Hydrographs (cont) The peak in TR-20 is determined based on a parabolic fit to the highest three consecutive hydrograph coordinates. This is not a good mathematical approach. It is better to make the delta t smaller instead. This may cause the TR-20 peak discharge to be significantly higher than the largest hydrograph coordinate for small Tc’s.

WinTR-20 Computation Differences March Runoff Hydrographs (cont) To see the internal delta t in WinTR-20, leave the Print Time Increment blank on the Global Output window.

WinTR-20 Computation Differences March Adding Hydrographs If two hydrographs with the same time interval are added, then TR-20 and WinTR- 20 will produce equal hydrographs. Again, the time intervals are rarely the same. WinTR-20 will combine hydrographs with different delta t’s.

WinTR-20 Computation Differences March Adding Hydrographs (cont) For example, let us add hydrographs A and B. Hydrograph A has a time interval of 0.1 hour and Hydrograph B has an interval of 0.33 hour. Hydrograph A is interpolated to a time interval of 0.33 hour and added to Hydrograph B. Hydrograph B is interpolated to an interval of 0.1 hour and added to Hydrograph A.

WinTR-20 Computation Differences March Adding Hydrographs (continued) Whichever hydrograph has the higher peak is saved for further operations downstream.

WinTR-20 Computation Differences March Diverting or dividing hydrographs Given the same cross section elevation- discharge data and inflow hydrograph at the same delta t, the TR-20 and WinTR-20 will produce equal hydrographs. Again, the time intervals are rarely the same.

WinTR-20 Computation Differences March Structure Routing For the same Structure elevation-discharge-storage data and inflow hydrograph, TR-20 and WinTR-20 will produce equal hydrographs.

WinTR-20 Computation Differences March Maximum number of Hydrograph Points The maximum number is 100,000. This allows WinTR-20 to save hydrographs at extremely short time intervals. Sometimes with structure routings with very low release rates, this 100,000 point limit can be exceeded.

WinTR-20 Computation Differences March Difference in Reach Routing The Modified Att-Kin method in TR-20 was replaced with the Muskingum-Cunge method. In general, the Muskingum-Cunge will give a higher peak discharge at the end of the reach when considering the same rating table, reach length, etc.

WinTR-20 Computation Differences March The End

WinTR-20 Computation Differences March