SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.

Slides:



Advertisements
Similar presentations
NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Advertisements

Stormwater Management Program Training Presented By FAU Environmental Health & Safety Phone: Fax: Web:
Stuck in the SWMP Storm Water Management Programs: New challenges for the Transportation Community.
11 Virginia Stormwater Management Regulations December 9, 2013 Va Soil and Water Conservation Districts Annual Meeting.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
What is NPDES? “National Pollutant Discharge Elimination System”
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Update on Stormwater Regulation
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Upper Providence Township Stormwater Management MS4 Program.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Slide 1 EPA Stormwater & Water Regulations: Local Impacts & Balancing Power 2011 Congressional City Conference.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
When It Rains, It Drains An Overview: The Lower Providence Township Storm Water Management Program.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Department of Conservation and Recreation 1 Proposed Stormwater Management Requirements for Virginia Rappahannock River Basin Commission June 24, 2009.
MUNICIPAL STORMWATER PERMITS Water Quality Partnership May 19, 2005.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
WOOLPERT Managing NPDES Phase II Requirements on a County-Wide Basis Jared Livingston.
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
MS4 Permitting Process William Creal Water Bureau Permits Section Chief.
Introduction to MS4 Stormwater Requirements (2009)
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Stormwater Management for Colleges and Universities Phase II for Colleges and Universities State Stormwater Programs Industrial Facilities.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Overview of Montana’s Stormwater Regulatory Program.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
MDOT Storm Water Management Plan Module 2: Best Management Practices
Urban Programs. Urban Programs - ESC Virginia Erosion and Sediment Control (ESC) Law –Approved in –Title 10 of the Code of Virginia. “Each District.
State of Connecticut Department of Transportation Stormwater Management Plan CONNECTICUT DEPARTMENT OF TRANSPORTATION Bureau of Policy and Planning Cynthia.
Stormwater Regulations NC Division Of Water Quality DPPEA Technical Sharing Session May 25, 2004.
Phase II National Storm Water Regulations What’s in it for you?
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
N.P.D.E.S. PHASE II Virginia Beach. Local Condition AREA 312 SQUARE MILES CHESAPEAKE BAY 98 SQUARE MILES WATERSHED SOUTHERN 209 SQUARE MILES WATERSHED.
An Overview of our Community’s Stormwater Management Program
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
1 Module 1: Refresh Your Perspective on the Storm Drain System Stormwater System Maintenance: A 4-Part Workshop Series.
Kentucky Growth Readiness for Water Quality Does your water quality matter?
Chapter 10 Local, Regional, State, and Multistate Water Management Agencies.
URBAN STORMWATER: A PERFECT STORM FOR CHANGE Jon M. Capacasa Director, Water Protection Division EPA Region III.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
CLEAN WATER ACT AND MUNICIPAL STORMWATER CALIFORNIA STORMWATER WORKSHOP David W. Smith, Manager NPDES Permits Section EPA/Region 9.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
North Hennepin Community College MS4 Plan October 24, 2014.
Fred Noble, P.E. State NPDES Administrator Florida Department of Transportation NPDES MS4 Permit Overview 2016 Maintenance Conference.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Municipal Separate Storm Sewer System (MS4) Permit
Stormwater Management and MS4 Compliance
Advanced Environmental Management (AEM) Training Phase I
STORMWATER MANAGEMENT
Town of Melbourne Beach
Summit County MS4.
Sacramento County Stormwater Quality Program
MS4 OVERVIEW 2015.
MS4 = Municipal Separated Storm Sewer System
Sacramento County Stormwater Quality Program
Presentation transcript:

SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office Lead

SLIDE 2 Blue Highways WHY SUSTAINABLE STORMWATER? Historical Concerns – Flood/Drainage Control Clean Water Act – Water Quality – Fishable & Swimmable Waters Federal Regulation Changes / Legal Challenges Chesapeake Bay TMDL – Urban Sector: Retrofits to comply New State Regs: Sustainable Development – Retrofitting is Expensive – Flood Damage is Expensive – Fishable and Swimmable Waters

SLIDE 3 Blue Highways Pollution Prevention – Good Housekeeping – Reduce Flows from Storm Events Environmental Site Design/Low Impact Design – Preserve Natural Features – Create Green Spaces – Retention and Infiltration “New” Virginia Regulations – Construction Sites – MS4 Permits Overview SUSTAINABLE STORMWATER APPROACHES

SLIDE 4 Blue Highways WHAT IS AN MS4? 1.Owned or operated by a federal, state, city, town, county, district, association, or other public body, created by or pursuant to state law, having jurisdiction or delegated authority for erosion and sediment control and stormwater management, or a designated and approved management agency under §208 of the CWA that discharges to surface waters; 2.Designed or used for collecting or conveying stormwater; 3.That is not a combined sewer; and 4.That is not part of a publicly owned treatment works. "Municipal separate storm sewer" means a conveyance or system of conveyances otherwise known as a municipal separate storm sewer system, including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels, or storm drains: DOTs: Vary from Region to Region and by State as to how they are permitted for their MS4

SLIDE 5 Blue Highways URBANIZED AREAS IN VIRGINIA Blacksburg Bristol Charlottesville Fredericksburg Harrisonburg Kingsport (TN) Lynchburg Richmond Roanoke Virginia Beach Washington, D.C Winchester Plus 11 Phase I (Large) MS4s in Northern Virginia, Richmond and Hampton Roads Areas of the Commonwealth – VDOT permit covers all Urbanized Areas

SLIDE 6 Blue Highways Construction General Permit – Develop a Stormwater Pollution Prevention Plan (SWPPP) »Erosion & Sediment Control Plan (ESC) – during construction »Pollution Prevention Plan (P3) – during construction »Stormwater Management Plan (VSMP) – post construction – Stronger Regulatory Measures Municipal Separate Storm Sewer System – Phase II (Small) – General Permit »6 Minimum Control Measures (MCMs) Special Conditions – Measureable Goals STORMWATER POLLUTION PREVENTION New Regulatory Requirements – Federal Clean Water Act Discharge Permits

SLIDE 7 Blue Highways MS4 Requirements – VDOT Current Permit 6 MINIMUM CONTROL MEASURES MCM 1. Public education and outreach on stormwater impacts MCM 2. Public involvement and participation MCM 3. Illicit discharge detection and elimination MCM 4. Construction site stormwater runoff control MCM 5.Post-construction stormwater management in new development and redevelopment MCM 6. Pollution prevention/good housekeeping for municipal operations

SLIDE 8 Blue Highways MS4 Requirements 6 MCM MEASURABLE GOALS Public Engagement/Outreach/Education – MCM 1: Three High Priority WQ Issues – MCM 2: Four Local Activities System Inventory/Asset Management – MCM 3: Outfall Mapping and Screening Pollution Prevention – MCM 4: ESC; Staff and Contractor Training; TMDL Inspections – MCM 5: Post Construction; Local VSMP Programs; Staff and Contractor Training; SWPPP Review – MCM 6: Good Housekeeping: EMS-like policies/procedures; High Priority Facilities; Staff and Contractor Training Special Conditions - TMDLs

SLIDE 9 Blue Highways Now Have Specific MS4 Requirements TOTAL MAXIMUM DAILY LOADS Required Load Reductions – Pollutant Specific – Best Management Practices – Chesapeake Bay Program – Va DEQ Chesapeake Bay TMDL Action Plan – 5% Plan June 30, 2015 – 40%, 100% implemented under future permit requirements – TMDL Law Suit – Achieved by 2025

SLIDE 10 Blue Highways Water Quality Criteria and Methodology – Runoff Reduction Method – Promotes Sustainable Design »Environmental Site Design »Volume (source) Reduction »Infiltration/GW Recharge Water Quantity Criteria – Energy Balance Equation – Flood Control State Approved BMP Efficiencies – Retention/Bioretention/Infiltration – Innovative Practices Local Programs – Streamlined Permitting – Enhanced Compliance New VSMP Requirements STATE REGULATION CHANGES

SLIDE 11 Blue Highways “Traditional” BMP pollutant removal efficiencies do not take into account the removal that occurs when the runoff volume is reduced. Many BMPs do not reduce runoff volume at all. Traditional Methodology SIMPLE METHOD

SLIDE 12 Blue Highways Using BMPs that also provide volume reduction provides greater overall pollutant (mass load) removal This reflects a “Mass Balance” Approach New Virginia Methodology RUNOFF REDUCTION METHOD

SLIDE 13 Blue Highways The longer and stronger the force acts, the more sediment is moved. The ENERGY BALANCE METHOD is based on the interaction of both flow volume and peak discharge, which determine the stream channel configuration Reduce Peak Discharge Rate Water Quantity / Flood Control ENERGY BALANCE METHOD

SLIDE 14 Blue Highways Virginia BMP Clearinghouse Examples: – Rooftop Disconnection – Rainwater Harvesting – Grass Swales – Infiltration – Bio-retention – Wet Swale – Wet Pond – Extended Detention Proprietary BMPs + NEW STORMWATER BMPS

SLIDE 15 Blue Highways TMDLs – Load Reductions from the Urban Sector – Chesapeake Bay TMDL Sea Level Rise/Climate Change Groundwater Recharge Long-Term BMP Maintenance Cost Reductions? – Future Innovative BMPs – Water Quality Markets Recognizing the Need for Sustainable Stormwater Management STORMWATER EVOLVING DISCUSSIONS

SLIDE 16 Blue Highways QUESTIONS? Ginny Snead, PE