US Army Corps of Engineers BUILDING STRONG ® Skiatook Lake Drought Issues and Management
BUILDING STRONG ® Purpose The purpose of the Interagency Drought Management Committee is to identify drought related issues and suggested actions which will serve the most critical needs with the remaining project storage. Actions that are identified will be worked on by Federal and State Agencies.
US Army Corps of Engineers BUILDING STRONG ® Skiatook Lake Drought Issues and Management Scott Henderson Chief, Water Management Section Tulsa District 24 October 2014
BUILDING STRONG ® Skiatook Lake Current Situation Water supply for Sapulpa, Sand Springs, Skiatook, and Osage County RWD #15 (future) Water quality releases required to meet permit requirements as measured at Sperry Conservation pool at (down 15.7’) 56% conservation pool Lake Elevation During the Drought
BUILDING STRONG ® Skiatook Lake Authorized purposes include: ► Flood Control * ► Water Supply * ► Water Quality * ► Fish and Wildlife ► Recreation * Purposes that have allocated storage and control water management operations Authorized purposes are the reasons the lake was constructed and every lake is unique
BUILDING STRONG ® FLOOD CONTROL POOL CONSERVATION POOL (WS /WQ) INACTIVE POOL DAM Storage Zones Skiatook Lake Elevation Incremental Storage Cumulative Storage (feet) (acre-feet) (acre-feet) Flood Control Pool: Conservation Pool: Inactive Pool: Current Elevation 698.3
BUILDING STRONG ® Skiatook Lake Significant Drought Statistics Below average rainfall since – Lowest 3-yr inflow period since impoundment Worst single year 2014 –Tracking to be 2 nd lowest inflow year Requires over 7 inches of runoff over the entire watershed to refill the pool
BUILDING STRONG ®
Skiatook Lake Conservation Pool Significant Water Accounting
BUILDING STRONG ® Skiatook Lake
BUILDING STRONG ® 11 Low Flow Requirements at Sperry, OK on Bird Creek In Cubic Feet per Second (cfs) Oct 1 – Oct 15Oct 16 – Mar 31Apr 1 – May 31Jun 1 – Sep 30 Annual Average Releases from Skiatook Lake for water quality control will be made together with releases from Birch Lake and runoff from the uncontrolled drainage areas below Birch and Skiatook Lakes to meet the flow schedule at the Sperry gage. Skiatook Lake
BUILDING STRONG ® Skiatook Lake
BUILDING STRONG ®
Skiatook Lake Elevation - Duration
BUILDING STRONG ® Skiatook Lake Elevation - Duration Percent of Time at or Below Pool Elevation PercentPool Elevation 80% % % % % % %694.7
BUILDING STRONG ® 16 - We are in a significant, multi-year drought. - Skiatook is a large lake with a small watershed. - Skiatook has significant demands on its conservation pool. Water quality and evaporation are the largest, followed by water supply. - The project purposes are flood control, water quality, water supply, fish and wildlife, and recreation. We operate for Congressionally authorized purposes, with flood control, water quality, and water supply having allocated storage. Skiatook Lake
BUILDING STRONG ® INCOG Presentation
BUILDING STRONG ®