12 months of success Richard Lampitt NOC FixO3: 12 months GA Crete October 2014.

Slides:



Advertisements
Similar presentations
How to form a consortium
Advertisements

The European Law Students Association Albania ˙ Austria ˙ Azerbaijan ˙ Belgium ˙ Bosnia and Herzegovina ˙ Bulgaria ˙ Croatia ˙ Cyprus ˙ Czech Republic.
EUDET Transnational Access : some administrative aspects Who is eligible? To be eligible to benefit from access to the EUDET infrastructures, a user group.
Funding Schemes. Legal and Financial Rules in the 7th Framework Programme PHOENIX Training Laulasmaa, 1 Sept 2007.
1 Plans for the European contribution to OceanSITES. FixO 3 Richard Lampitt National Oceanography Centre Southampton UK.
Communication ICM Bodrum, 21st of October The European Law Students’ Association Albania ˙ Austria ˙ Azerbaijan ˙ Belgium ˙ Bosnia and Herzegovina.
UNIVERSITY OF JYVÄSKYLÄ INTERNATIONAL COOPERATION.
FP6-ERA-NET/March CA and SSA Results of 2nd ERA- NET cut-off date CA and SSA Proposal Evaluation March 2004 and Negotiations/Selection April-August.
Not legally binding FP7 Rules for Participation and Grant agreement FP7 Helpdesk 
Erasmus Thematic Network Sanne Hirs, Project coordinator Faculty of Law, Utrecht University.
UNICA RECTORS’SEMINAR Brussels 5th of June 2007 Poul Petersen Tel
FP7 Rules for Participation and contractual aspects Mag. Carla Chibidziura FFG – European and International Programmes – FP7 Energy.
Delegations ICM Cluj-Napoca, 20th April The European Law Students’ Association Albania ˙ Austria ˙ Azerbaijan ˙ Belgium ˙ Bosnia and Herzegovina.
Delegations III KAM, Bratislava 4th to 8th September 2013.
Study Visits IV KAM Prague, 3 rd to 7 th September 2014.
Knowledge Management LXV International Council Meeting Qawra, Malta 16 th - 23 rd of March 2014.
Study Visits ICM Croatia, Opatija, 27th October to 3th November 2013.
The Geography Challenge
Institutional Visits IV KAM Prague, 3 rd to 7th September.
ELSA Shop(ping) – Spring SALE! LXV International Council Meeting Qawra, Malta 16 th - 23 rd of March 2014.
Knowledge Management and Transition ICM Cluj-Napoca, 24th April 2015.
Delegations IV KAM Prague 3rd to 7th September 2014.
Institutional Visits ICM Cluj Napoca, 19 th to 26 th April 2015 Patrick Zischeck, Assistant for IV and SV.
ELSA Shop(ping) LXIV International Council Meeting Opatija, Croatia October 28 th - November 3 rd 2013.
Introduction to Europe & European Law
Recruitment Kick-Off Meeting in Geneva. Kick-Off Meeting in Geneva: Budget and FinancesSlide Recruitment Outline 1.Who can be recruited?
Study Visits LXV International Council Meeting Qawra, Malta 16 th - 23 rd of March 2014.
Area Definition III KAM,Bratislava. The European Law Students’ Association Albania ˙ Austria ˙ Azerbaijan ˙ Belgium ˙ Bosnia and Herzegovina ˙ Bulgaria.
Reporting of 2007 EIONET air emissions priority data flows, summary of country performance Reporting of 2007 EIONET air emissions priority data flows,
ELSA Law Schools ICM Cluj-Napoca, 21st April 2015.
Grant case study LXVII International Council Meeting 19th – 25th April, Cluj-Napoca Romania.
SeaDataNet Pan-European infrastructure for Ocean & Marine Data management An Integrated research Infrastructure Initiative (I3) Kick-off Meeting June 8-10.
THE EUROPEAN UNION. Member States The European Union is composed of 27 independent sovereign states which are know as member states: Austria, Belgium,
Provisional FP-ICT InfoDay, Torino, 11/12/ The ICT Theme in FP7 How to submit a proposal 1. The Rules of the Programme.
Doing Business in Europe Bay Area CITD Seminar Series Tuesday, September 21st, 2004 Kemarra Inc. - Key Marketing Resources & Associates San Francisco USA.
Study Visits ICM Cluj Napoca, 19 th to 26 th April 2015 Patrick Zischeck, Assistant for IV and SV.
2008LIFE presentation LIFE+ call for proposals.
ICM Bodrum 24 th October AA Workshop Legal Research Group.
Institutional Visit LXV International Council Meeting Qawra, Malta 16 th - 23 rd of March 2014.
ELSA as the Franchise? LXV International Council Meeting Qawra, Malta 16 th - 23 rd of March 2014.
EXTREME MAKEOVER Members’ Magazine LXIV International Council Meeting Opatija, Croatia October 28 th - November 3 rd 2013.
Map - Region 3 Europe.
ELSA Summer Law Schools IV KAM Prague, 3rd to 7th September 2014.
© Enterprise Europe Network South West 2009 The Eurostars Programme Kenny Legg R&D Funding for the Environmental Sector – 29 June 2010 European Commission.
European Union. Refresher  Market: the interaction of buyers and sellers exchanging goods and services  Trade: the process of buying, selling, or exchanging.
Erasmus+ Work together with European higher education institutions Erasmus+
Bureau for International Research and Technology Cooperation Herlitschka 1 Warsaw FP6 Launch Conference - 26 Nov Small and Medium Enterprises -
Delegations LXV International Council Meeting Qawra, Malta 16 th - 23 rd of March 2014.
THE EUROPEAN UNION.
Social Studies: Europe & Russia Lesson 34 Practice & Review
EIE- Surveyor 1 Financial aspects ► 40 % amount 45 days after initial contract (about December2005) ► 40 % 45 days after approval of the progress report.
Geography Review On Map 1, please identify: -Spain -France -England -Russia -Ottoman empire -Persia -China -Mughal India -Songhai Empire.
The European Law Students’ Association Albania ˙ Austria ˙ Azerbaijan ˙ Belgium ˙ Bosnia and Herzegovina ˙ Bulgaria ˙ Croatia ˙ Cyprus ˙ Czech Republic.
ARTEMIS Call for proposals 2008 Tom Bo Clausen “Embedded Systems & Control” European Commission, Brussels.
LXVI Internationl Council Meeting Turkey 19th – 26th of October 2014 Academic Activites Workshop Monday 20th of October –
1. Training seminar Bonn, Feb. 3rd, 2009 EuroRIs-Net Transnational Access / Services Special Clauses Integrating Activities Practical Exercise: Financial.
European Innovation Scoreboard European Commission Enterprise and Industry DG EPG DGs meeting, May 2008.
CONFIDENTIAL 1 EPC, European Union and unitary patent/UPC EPC: yes EEA: no EU: no (*) (*) Also means no unitary patent Albania, Macedonia, Monaco, San.
France Ireland Norway Sweden Finland Estonia Latvia Spain Portugal Belgium Netherlands Germany Switzerland Italy Czech Rep Slovakia Austria Poland Ukraine.
INTERNATIONAL BUSINESS Unit 2 Business Development GCSE Business Studies.
PRAG PRACTICAL GUIDE TO CONTRACT PROCEDURES FOR EXTERNAL ACTIONS
DISTRIBUTION AUTOMATIC - GENERATION
PRAG PRACTICAL GUIDE FOR CONTRACT PROCEDURES
Joint Master Degrees EMJMDs Erasmus+ information day
Support to National Helpdesks
The European Parliament – voice of the people
The European Parliament – voice of the people
Support to National Helpdesks
EU: First- & Second-Generation Immigrants
State of play of OP negotiations
Presentation transcript:

12 months of success Richard Lampitt NOC FixO3: 12 months GA Crete October 2014

FixO 3 2

OceanObs Galway declaration Call text proposed Writing team established Call published FixO 3 Submission FixO 3 start FixO 3 end 3

FixO 3 start FixO 3 end Final report Mid-term review Technical report Grant agreement

5 Great achievements 11 milestone 15 TNA applications 17 deliverables

6 Great challenges 1 data policy accepted

7 EMODnet 20M Euro/year for the forthcoming future

8 Great challenges 1 data policy accepted 1 mid-term review

9 The reviewer's task is to give external advice to the Commission with respect to: 1. Fulfilment of the project work plan and deliverables 2. Relevance of the objectives and breakthrough potential 3. Resources vv achievements 4. Management 5. Contributions of partners and their integration 6. the expected impact in various categories 7: Plans for the use and dissemination of results. The reviewer(s) will also assist the Commission by recommending any reorientation that may be required. Mid-term review (in period 1-12 th October 2015)

10 Great challenges 1 data policy accepted 1 mid-term review Service Activity funding to start

11 NA TNA JRA M

12 Great challenges 1 data policy accepted 1 mid-term review Service Activity funding to start 8 milestones 24 deliverables AtlantOS to start

13

14

Data into public domain with minimum time delay Metadata associated Free of Charge or with just cost of reproduction Data Sharing Principles Full and Open Exchange of Data … Recognizing issues of accreditation 15

FixO 3 With surface chlorophyll (average 2007) Courtesy RSDAS 16

17 FixO 3 With Surface temperature climatology Courtesy NEODAAS, UK

18 FixO 3 With air-sea flux of CO2 (average 2000) (From Takahashi et al 2009) Courtesy Ute Schuster, UEA

19 FixO 3 With dust deposition rate annual climatology (from Mahowald 2005) Courtesy Natalie Mahowald

20

21 FixO 3 Workpackages 1: Project management 2: Technological harmonisation 3: Procedural harmonisation 4: Data management and harmonisation 5: Innovation through industry 6: Interface with policy and intergovernmental bodies 7: International and European networking of fixed point observatories 8: Outreach and training 9: Transnational access to FixO3 infrastructures 10: Service activities: Access to data products and knowledge 11: Optimisation of ocean observing capability 12: Research and development on critical observatory functions

22

23

24 Top Fossil Fuel Emitters (Absolute) Top four emitters in 2011 covered 62% of global emissions China (28%), United States (16%), EU27 (11%), India (7%) The growing gap between EU27 and USA is due to emission decreases in Germany (45% of the cumulative difference), UK (19%), Romania (13%), Czech Republic (8%), and Poland (5%) Source: CDIAC DataCDIAC Data; Le Quéré et al. 2012; Global Carbon Project 2012Le Quéré et al. 2012Global Carbon Project 2012

25 FixO 3

26 Across the Fram strait Within the Mediterranean

Essential Climate (Ocean) Variables Martin Visbeck

28

29 Transnational Access (TNA)

Provision of transnational access to researchers or research teams to one or more research infrastructures among those operated by the participants ‘Hands on’ access Remote access Transnational Access (TNA) 30

Definitions access provider = beneficiary that is in charge of providing access infrastructure = facility or resource (or a coherent set of them) together with related services installation = part of the infrastructure that could be used independently from the rest user = researcher in a user group, including the user group leader user group = research team of one or more researchers given access to the infrastructure under the project 31 Transnational Access (TNA)

Performance obligations provide access free of charge to selected user groups to the infrastructure or the installations publicise widely, including a dedicated web page on the internet, the access offered under this grant agreement ensure that users comply the terms and conditions of the grant agreement maintain appropriate documentation to support and justify the amount of access reported 32 Transnational Access (TNA)

Transnationality the user group leader and the majority of the users must work in an institution established in a MS or AS the user group and the majority of the users must work in a country other than the country where the legal entity operating the infrastructure (access provider) is established Exception the access provider is an international organisation or the JRC remote access to a distributed set of infrastructures or installations offering the same services 33 Transnational Access (TNA)

Selection of user groups Only user groups that are entitled to disseminate foreground they have generated under the project are eligible to benefit from access free of charge user groups requesting access have to submit in writing a description of work, including names, nationalities and home institutions of the users the access provider has to set up a selection panel to assist in the selection of user groups according to the principles of transparency, fairness and impartiality 34 Transnational Access (TNA)

Selection of user groups (II) the selection panel has to consist of international experts, at least half of them shall be independent from the infrastructure the selection has to be taken on basis of scientific merit – priority should be given to user groups: - who have not previously used the infrastructure - are working in countries where no such infrastructures exist 35 Transnational Access (TNA)

Access cost calculation of a unit cost (estimated or real) the total quantity of access to the installation during the lifetime of the project (access financed and not financed by the EC) - direct costs of the access, excluding subcontracts plus indirect costs of 7% of the direct costs the direct costs shall exclude all contributions to capital investments as well as travel and subsistence costs the direct costs may include cost of preparatory work 36 Transnational Access (TNA)

Community financial contribution (Last) Adjustment of access costs in the financial statement (Form C) corresponding to the (last) reporting period on the basis to the total quantity of access and the actual costs incurred to give access The community financial support shall not exceed 20% of the costs of providing access to the installation over the duration of the project. 37 Transnational Access (TNA)

Access cost calculation of a unit cost (estimated or real) the total quantity of access to the installation during the lifetime of the project (access financed and not financed by the EC) - direct costs of the access, excluding subcontracts plus indirect costs of 7% of the direct costs the direct costs shall exclude all contributions to capital investments as well as travel and subsistence costs the direct costs may include cost of preparatory work 38 Transnational Access (TNA)

39 Eligibility If your current employer is based in an EU member state or associated state. These countries are: Albania, Austria, Belgium, Bosnia & Herzegovina, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Israel, Italy, Latvia, Liechtenstein, Lithuania, Luxembourg, Macedonia, Malta, Montenegro, Netherlands, Norway, Poland, Portugal, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey, United Kingdom You may apply for access to infrastructure located in the same country as your own institution under certain circumstances.

Services through Communication Networks and e-infrastructure activities Special Clause No. 17, 18 and 19 to FP7 Grant Agreement 40

Special Clause No. 17 A.Performance Obligations The access provider shall provide access free of charge to the scientific services described in Annex I through communication networks have the services offered to the scientific community assessed periodically by an external board composed to international experts in the field, appointed by the consortium with the written approval of the Commission 41

Special Clause No. 17 B. Financial Provisions Community financial support for access costs shall not exceed 20% of the operating costs incurred by the installation providing the access over the duration of the project, excluding all contributions to the capital investments of the infrastructure 42

Special Clause No. 18 e-Infrastructure activities Definitions Connectivity: means a set of one or more circuits allowing for the transmission of full duplex bit streams denied end points, as specified in Annex I 43

Special Clause No. 18 Financial Provisions As an exception to Article II.16 (Upper Funding Limits) for the continued provision and upgrading of the required connectivity services as specified in Annex I, the maximum reimbursement rate shall be 50% of the total eligible costs. 44

Special Clause No. 19 Limitation of indirect costs for integrating activities Infrastructures and preparatory phase reimbursement of indirect costs related to coordination and support activities, except those related to the management of these activities, is limited to a maximum of 7 % of the direct costs relating to these activities, excluding the direct eligible costs for subcontracting and the costs of resources made available by third parties which are not used on the premises of the beneficiary 45