Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. PI System in T&D and Wind Generation Regional Seminar Series Jon.

Slides:



Advertisements
Similar presentations
1 Demand-Side Management Influence on Reliability NERC Demand-Side Management Task Force (DSMTF) Rick Voytas, Chair November 2007 Presented To The U.S.
Advertisements

This document and any attachments contain proprietary information and are the sole and exclusive property of Mitsubishi Power Systems Americas, Inc., MPSA.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Using PI for Reporting Regional Seminar Series Skye Blair and Alan.
PSE&G Condition-Based Maintenance
CPUC CSI Workshop CPUC CSI Stakeholder Workshop San Francisco, CA February 15, 2012.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. CCGT Plant Optimisation using Real Time Data Regional Seminar Series.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. PI for Facilities and IT Infrastructure Regional Seminar Series Robert.
Resource Adequacy in PJM
PacifiCorp-CAISO EIM Initiative Overview
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Improving Boiler Water Chemistry Regional Seminar Series Cincinnati.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Asset Optimization using PI and AF Regional Seminar Series Cincinnati.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
1 Integrating Wind into the Transmission Grid Michael C Brower, PhD AWS Truewind LLC Albany, New York
Wind energy in NZ 20% wind by 2030 Eric Pyle, Chief Executive, NZ Wind Energy Association.
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Regional Seminar Series Houston October 28, 2009 Flowserve’s Technology.
Empowering Business in Real Time © Copyright 2010, OSIsoft LLC All rights Reserved. Regional Seminar Costa Rica June 29, 2010.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Fleet Optimization Through Process Information Regional Seminar Series.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Critical Facilities, Data Center,& IT Regional Seminar Series Mike.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
Today’s Enterprise Energy Management Systems: What to look for…. Mark A. Noyes CEO and President Cambridge, Massachusetts.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Monitoring the paper mill operations, production quality and KPI’s.
Empowering Business in Real Time. © Copyright 2010, OSIsoft,LLC. All rights Reserved. Portal Visualization: Using Microsoft SharePoint and OSIsoft’s PI.
Fleet Performance and Reliability in Generation Utilities
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Value now. Value over time. © Copyright 2010, OSIsoft, LLC All rights Reserved. Enabling Data Infrastructure for Utility Sustainability John Lacy November.
APS and Its Smart Grid Initiatives September 26, 2012 Tony J. Tewelis Director, Technology Innovation.
E x R E x R 1:a E x R/a 2. E j 2.0 j j 0.05 Generator terminal voltage maintained at pu j 0.08 V/a Load voltage (V) maintained at
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. The Use of PI at International Power Regional Seminar Series Lee.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. ROMPETROL’S REAL TIME INFORMATION SYSTEM a road from PLANT OPERATIONS.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Value of Partnerships and Collaboration for World Class Performance.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Critical Facilities Introduction – NYC Sept 15, 2009 Regional Seminar.
PJM©2009www.pjm.com Implications of Electric Transportation for the National Grid Ken Huber PJM Interconnection February 19, 2010.
Copyright © 2007 OSIsoft, Inc. All rights reserved. Managing Wind Power in Real Time Scotty Gilbert Director, Wind Asset Management PPM Energy.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
AMI project for Israel Electricity Corporation
Click to edit Master title style Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Value Based Case Studies Regional.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Value now. Value over time. © Copyright 2010, OSIsoft, LLC All rights Reserved. Enabling Data Infrastructure for Utility Sustainability John Lacy November.
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
Last days of suppliers hegemony: customer driven market has come Athens, March 1 st, 2006 Ester Cámara Operations Manager Iberdrola Renewables Energies.
NEMMCO Bryan Connell Terry Day. Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. 2 NEMMCO was established in May 1996 to implement,
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
Managing Reliability and the Markets with PI
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
American Wind Energy Association Wind in The Portfolio Mike Jacobs American Wind Energy Association Managing Your Energy Portfolio in a Greener World January.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Real Time Goes Mainstream Dr. J. Patrick Kennedy, CEO and Founder OSIsoft Inc.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
PJM©2014www.pjm.com A System Operator’s Resilience Wish List Tom Bowe Executive Director Reliability and Compliance PJM Interconnection
1 10. BUSINESS STRATEGIES IN ANCILLARY SERVICE MARKETS Asko Vuorinen.
Wind Management at MISO
Breakout Session on Smart Grid Data Analytics
Mid-Continent Area Power Pool
New England Electricity Restructuring Roundtable
Jim Mcintosh Director, Executive Operations Advisor California ISO
UM 1856 PGE’s Energy Storage Proposal – Commission Workshop #1
Presentation transcript:

Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. PI System in T&D and Wind Generation Regional Seminar Series Jon Peterson VP, Marketing OSIsoft September 15, 2009

2 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. T&D and Wind Case Studies T&D California ISO Phasor Measurement Units and Wide Area Measurement System PSE&G Wind Generation Challenges In market availability MarketsS

3 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Midwest ISO Scope of operations Generation Capacity 131,306 MW (market) 159,000 MW (reliability) Peak Load (set July 31st, 2006) 116,030 MW (market) 136,520 MW (reliability) 93,600 miles of transmission 13 states, 1 Canadian province 750,000 square miles

4 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Midwest ISO Key Operational Uses of PI Monitor Transmission Flow Track Generation and Load Monitor Operating Reserve Monitor ACE and Frequency Monitor Tie Line Flows Across Boundaries Manage Procedures

5 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Load Comparison

6 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Generation Dispatch Data

7 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. California ISO Performance metric approach to regulation Improve the Quality of Regulation Service Rank Regulation Performance Share information with Generator Owners May Eventually Penalize Poor Performers Improve Reliability Better Response to System Emergencies NERC Control Performance Standards Reduce Costs Improve Efficiency of Regulation Service

8 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. California ISO Approach—member requirements Generators are integrated with CA ISO EMS Two way communication AGC Status Generation set points Performance trends Certification of generators Generator’s ramp rate

9 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Performance Metric Calculation Supplier Control Error Calculated with PI-ACE Calculation Period Instantaneous Value 10 Min Summation 1 Hr Summation Performance Metrics 1) Energy Calculations 2) Line Statistic Calculations Expected Generation Actual Generation Bid Ramp Rate

10 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Performance Metric Calculation Where: N=1 if StdDevRatio or Correlation fail (StatPerf = 1) N=2 if StdDevRatio and Correlation are good 100* ) + ( N StatPerfSCEPerf PerfMetric 

11 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Performance Metric Calculation Where: Bias = 1 mwh Error = 10 mwh (10*bias) If SCE > 11*bias, SCEPerf = 0% Supplier Control Error Energy

12 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Performance Metric Calculation Line Statistics Where StatPerf = 1 ifor

13 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Regulation

14 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Good Performer SCE 1H Avg= 1.2 mwh SCEPerf = 98.2% StdDevRatio = 99.6% Correlation = 91.4% Overall Performance PerfMetric = 94.6%

15 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Poor Performer--Response SCE 1H Avg = 9.9 mwh SCEPerf = 12.4% StdDevRatio = 87.0% Correlation = 73.5% Overall Performance PerfMetric = 38.1%

16 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. PMUs and WAMS Phasor Measurement Units Widely available SEL, GE and others Wide Area Measurement System Leverage PMU data installed on grid

17 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. PMU Frequency Voltage Real and Reactive Power Absolute phase angle Accessed via C protocol OSIsoft Interface now available to all customers Trained field service engineers for installation and configuration

18 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Examples

19 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Frequency Overview

20 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Frequency Error X-Y Plot of deviation of base station vs. reference

21 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Frequency vs. Angle X-Y

22 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. PSE&G Condition Based Maintenance Calculation Structure CA = F1(M1) + F2(M2) + F3(M3) + … Condition & Criticality Factors driven by data available Example Factors – CM Cost & Count for Past 6 Months – Operation Count for Past 6/12 Months – Gas Analysis – Change over time – Average Load over Time Peer Groups Apply calculations by peer group Voltage, Class, Type Example Groups: – 26KV – 69KV GCB – 138KV+ Power Transformer – LTC Vacuum Tanks Data Collection Analysis & Reporting Maintenance Management Raw data Measurement points Notification Feedback

23 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Prioritized summary report

24 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Details—load tap change issue

25 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved.

26 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Results LTC Stationary & Moving Contacts Burned Next PM Due 2015 LTC & Transformer would have failed before next PM Conservatively Saved $2M Transformer 2008 National Reliability Excellence Award America’s most reliable electric utility 3 rd time they received this award

27 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Wind Generation and PI Industry primary challenges Asset utilization Availability Efficiency Sell power at highest rates Grid integration Forecasting Scheduling Trading Warranty management

28 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Wind Generation and PI Industry primary challenges Enterprise integration Heterogeneous assets Security NERC CIP Regulations and Compliance Reporting

29 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Value of Availability Hours TurbineClass (kW) Capacity FactorAvailability Annual Expected Output (kWh)* Busbar Price /kWh Annual Cash Flow per WTG %100% 1,734, $ 73, %100% 2,890, $ 122, %100% 4,336, $ 184, %100% 5,781, $ 245, %100% 7,227, $ 307, %100% 14,454, $ 614, *Formula = Hours * Generator Capacity * Capacity Factor * Availability A typical utility scale wind farm may have 30 to 200 Turbines Large owners (e.g. Iberdrola – 3500MWs) may have thousands of turbines A single percentage point gain/loss of “in-market” availability (e.g. turbines available to operate when the wind is blowing) for Iberdrola Total Fleet would result in a 1 st Year ROI/loss of $4.3MUSD. NPV over 5 Years = 18% Discount Rate Based on US prices, power rate in Spain is.07 to.10/kWh produced For a Single Wind Farm of 150MWs: In a 1 st year ROI of $185,000 NPV over 5 years = 18% Discount Rate

30 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Gearbox Example 74-14

31 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Gearbox Example Fault high Temp Degrees 26 Degrees

32 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Gearbox Example DateTimeHours Lost Production Lost Fault 5/5/0419: ,627Gen Temp High 5/9/0420: ,200Gen Temp High 5/16/0418: ,297Gen Temp High 6/29/0416: ,665Generator R&R, Gen Alignment 7/16/046: Nacelle Reassembly after R&R Gen Total ,489 $10,024 lost revenue from 1 turbine over 2 month period

33 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Gearbox Example

34 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Power Curve Analysis

35 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Markets PPM—Scotty Gilbert 14 day forecasts; about best at this time 24 hour forecasts—climatology and park data They bank on this—trading is done 24 hours in advance. Supply vs. buy decisions

36 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Markets PPM—Scotty Gilbert At end of day reconcile reality with forecast Did you get the fuel predicted? Did you convert to power as predicted? Evaluate Market exposure Were assumptions true? Imperative to go back and understand and improve.

37 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Markets Scotty Gilbert’s words of wisdom Collect all the information True production vs. predicted Evaluate reasons Evaluate where to invest to improve Answer questions in real time. – Don’t take weeks to answer the CEO’s questions “Have the courage use the historical data to evaluate performance”

38 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Credits Midwest ISO unter.pdf unter.pdf California ISO PSE&G BM_PSEG_Gopal_Rothweiler.pps BM_PSEG_Gopal_Rothweiler.pps PPM (Iberdrola) 05B_Gilbert_PPM_files/Default.htm 05B_Gilbert_PPM_files/Default.htm

Thank you © Copyright 2009 OSIsoft, Inc. 777 Davis St., Suite 250 San Leandro, CA 94577