SPILLWAY ( 77 mt) 31.5 Km SEEPAPALLY VAGU RESERVOIR Right Earth Dam226 Mt Left Earth Dam 522 Mt Non EPC Package Works under progress EPC Package Works.

Slides:



Advertisements
Similar presentations
PRESENTATION for EAST DELHI CA CPE STUDY CIRCLE of NIRC of ICAI on ACCOUNTING & AUDITING OF NGO/NPO by SUDHIR VARMA FCA;CIA(USA)on SATURDAY 23 RD DECEMBER.
Advertisements

1 PROJECT PROFILE : Lining of TGP Canal from KM to KM (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement.
ESTIMATES Mrs.Nirupma Kumar Prof. Fin & Investment.
Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status ENERGY.
LORD Addl. PD, DRDA, BOLANGIR Presentation by HARISHANKAR.
MUSURUMILLI PROJECT 15 km 35.4 km Project cost : cr
(A) Completion of on going works of dam, canals,etc. including restoration of works of dam. PROJECT WISE DETAIL Total Provision Rs Crore Measure/Project/SectorDistt.
No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs croresWorks under.
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
Implementation of MGNREGS in Andhra Pradesh In India Agriculture based Livelihoods: Opportunities and Potential 1 Government of Andhra Pradesh, India.
(POLAVARAM) (Head Works)
TADIPUDI LIFT IRRIGATION SCHEME
PRESENTATION BY Manaranjan Mali, Addl.P.D Technical, DRDA, Nabarangpur.
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
Budget allocation and release of funds to implementing agencies under ADIP Scheme S.NoFinancial Year Budget Estimate (Rs. In crores) Amount Released (Rs.
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
GNSS PROJECT (PHASE-I)
RAJASTHAN STATE AGRICULTURAL MARKETING BOARD JAIPUR
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
Corporate Office Ambience Corporate Tower, Ambience Mall, Ambience Island NH-8 Gurgaon
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
PHASE – I & PHASE - II.
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
ORGANISATION CHART OF RSRDC UNIT-GURGAON RE SH. SUKESH MATHUR ARE SH. UMESH KUMAR GARG ARE SH. J.M. MITTAL ARE SH. R.D. MEENA ACCOUNTANT SH. SANT LAL.
GREATER VISAKHAPATNAM MUNICIPAL CORPORATION
WATER RESOURCES DEPARTMENT
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMA SAGAR PROJECT STAGE-II
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
Karnataka Urban Infrastructure Development & Finance Corporation Working towards better urban living KARNATAKA MUNICIPAL REFORMS PROJECT 1.
Presented by Telangana Retired engineers forum 11.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.
Participatory Irrigation Management in Andhra Pradesh
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Review of CADWM Projects Under PMKSY
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Virtual Review - #61 by Chief Minister Dt
Polavaram Irrigation Project
#80 Virtual Review by Hon’ble CM dt: 5 Nov. 2018
Polavaram Irrigation Project
#28 Site Visit of Hon’ble Chief Minister Dt. 22nd October, 2018
Polavaram Irrigation Project
#79th Virtual Review by Hon’ble Chief Minister Dt. 29th October, 2018
Polavaram Irrigation Project
#82 Virtual Review by Hon’ble CM dt: 19th Nov. 2018
Polavaram Irrigation Project
#85 Virtual Review by Hon’ble Chief Minister, Dt. 21st January 2019
#87 Virtual Review by Hon’ble Chief Minister Dt: 04 FEB 2019
#89 VIRTUAL REVIEW BY HONBLE CHIEF MINISTER Dt. 25th FEBRUARY 2019
Polavaram Irrigation Project
#86 Virtual Review by Hon’ble Chief Minister, Dt. 28th January 2019
Presentation transcript:

SPILLWAY ( 77 mt) 31.5 Km SEEPAPALLY VAGU RESERVOIR Right Earth Dam226 Mt Left Earth Dam 522 Mt Non EPC Package Works under progress EPC Package Works under progress LEFT MAIN CANAL Project cost : cr Ayacut : ac HEAD SLUICE 2.00 mt X 1.2 mt BHUPATIPALEM RESERVOIR PROJECT

1 PROJECT PROFILE : Across Seethapallivagu 2 Administrative Sanction : G. O. Ms. No. 231, I & CAD, Dt: for Rs Crores 3 No. of EPC Packages (1 no old + 1 no. new) : 2 Nos 4 Agreement value of 2 packages : Rs Crs. (Head works Rs Crs.) (Canals Rs Crs.) 5 Budget provision for : Rs Crs. 6 Expenditure of the project 2004 – 05 : Rs Crs – 06 : Rs Crs. Cum. Exp. : Rs Crs 7 AyacutNew ayacut : acres 8 Land Acquisition Total Required : 1867 acres Acquired : 343 acres 9 Forest Land : 544 acres MOEF, New Delhi has granted approval for diversion of 544 acres of forest land vide Lr.No.F.No.8-35/03-FC; Dt BHUPATIPALEM RESERVOIR PROJECT

10 Mob. Advance (Rs. in Crores)Paid Recovered : : Total :