Full Monte Cost and Schedule Risk Analysis

Slides:



Advertisements
Similar presentations
Construction Management-Lec3 Planning and Scheduling-II
Advertisements

RiskyProject Project Risk Management Software
MEM 612 Project Management Chapter 5 Scheduling the Project.
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 18-1 Developed.
©2001 Plan B Systems Inc. PBSi Quantitative Cost/Schedule Risk Analysis.
Intaver Institute Inc. Comparison of RiskyProject Professional vs Lite versions Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada.
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
CHAPTER 4 MANAGING PROJECT PROCESSES. THE CONCEPT A project is an interrelated set of activities that has a definite starting and ending point and that.
Engineering Economic Analysis Canadian Edition
Systems Analysis and Design 8th Edition
Decision Focus ® “Decision Focus is a proven process for decision making that’s based on over 30 years of workplace results. It’s a set of tools that help.
Managing Projects
Decision analysis and Risk Management course in Kuopio
Monte Carlo Schedule Analysis The Concept, Benefits and Limitations Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1(403)
The What Why and How.  MCTS  These certifications provide the foundation for Microsoft Certification  MCITP  These certifications build on the technical.
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
PMT 257_Day 4_Risk Management
Engineering Economy, Sixteenth Edition Sullivan | Wicks | Koelling Copyright ©2015, 2012, 2009 by Pearson Education, Inc. All rights reserved. TABLE 12-1.
1 5. M ONTE C ARLO B ASED CPM Objective: To understand how to apply the Monte Carlo based CPM method to planning construction projects that are subject.
Managing Organizations Informed decision making as a prerequisite for success Action Vision Mission Organizational Context Policies, Goals, and Objectives.
1 Quality Center 10.0 NOTE: Uninstall the current version of QC before downloading QC All QC 10.0 documents can be located on the BI Shared Services.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Lecture 3 Scheduling CSCI – 3350 Software Engineering II Fall 2014 Bill Pine.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Engineering Economic Analysis Canadian Edition
“WHY ARE PROJECTS ALWAYS LATE?” (“and what can the Project Manager DO about that?) Craig Henderson, MBA, PMP ARVEST Bank Operations.
Project Schedule PLAN IT!. Project Schedule Project Schedule is based on Work Breakdown Structure (WBS) Define the WBS correctly or the Project Schedule.
Calculating Project Schedule Risk Using Monte Carlo Simulation Curt Blair, PMP.
VMcG 2/11/02 Critical Chain as an Extension to CPM Vincent McGevna, PMP February 11, 2002
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Chain Scheduling, PERT, and MS Project 2003.
Quantitative Project Risk Analysis 1 Intaver Institute Inc. 303, 6707, Elbow Drive S.W., Calgary AB Canada T2V 0E5
Intaver Institute Inc. Project and Portfolio Risk Management with RiskyProject Enterprise Project and Portfolio Risk Management with RiskyProject Enterprise.
Copyright 2003 Lynn Frock & Company. All Rights Reserved. 1 Five Ways to Build a Microsoft Project Schedule Lynn Frock, PMP Phone
12/4/2015 Vijit Mittal (NBS, Gr. Noida) 1 Monte Carlo Simulation,Real Options and Decision Tree.
Assignment-Level Tracking Field Calculations in Microsoft® Office Project Kelly Jones PMO Manager, Information Systems Sharp Healthcare.
DECISION MODELING WITH MICROSOFT EXCEL Chapter 14 Copyright 2001 Prentice Hall Publishers and Ardith E. Baker Part 3 andand PERT CPM.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
Roll the Dice with Confidence: Play to Win By Bill Carswell Adjunct Professor Embry Riddle Aeronautical University.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
Orlando Critical Chain as an Extension to C P M Orlando A. Moreno, PMP February,
Software Test Plan Why do you need a test plan? –Provides a road map –Provides a feasibility check of: Resources/Cost Schedule Goal What is a test plan?
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
MS Office Project Portfolio Server Overview of Project Server Gateway.
Project Management & Project Management Software
8.1 Plan Quality Management
Project Management – PTM721S
InLoox 9 Web App Product Presentation
Graphical Policy Analysis Tool
Project Management Chapter 3.
Unique Benefits of Using Risk Impact

Exercise 1: Escoger proyecto……….
InLoox 9 Web App Product Presentation
Chapter 6: Project Time Management
Project Time Management
Monte Carlo Schedule Analysis
CPM, PERT & Schedule Risk Analysis in Construction
Event Chain Methodology
What’s New in SEER-H The Galorath Team.
Quantitative Project Risk Analysis
Risk Event Modeling Intaver Institute Inc.
Risk Adjusted Project Schedules
Importance of Project Schedules
Expedite Project Updates Using a Custom Status View
CAD DESK PRIMAVERA PRESENTATION.
Agile Project Management and Quantitative Risk Analysis
Program & Project Risks and Reporting with Oracle Primavera Cloud
Presentation transcript:

Full Monte Cost and Schedule Risk Analysis for Microsoft Project from Barbecana

Full Monte Cost and Schedule Risk Analysis Full featured Monte Carlo Risk Analysis For Microsoft Project 2007 and 2010 Schedule Risk Analysis Cost Risk Analysis Sensitivity Analysis Schedule Quality Checks Compatible with Risk+ data High Performance

Schedule Risk Analysis 3 Point Duration Estimates Probability Distributions Probabilistic and Conditional Branching Correlation between Activities Criticality Index Probability Confidence Time

Sensitivity Analysis Allows you to identify the tasks creating the most uncertainty in project or milestone outcome Sensitivity Index Tornado Chart Tornado Sensitivity Chart

Cost Analysis Calculates Task and Project cost Takes into account Per Use Cost, Actual Costs, and Rates Uses Escalated Costs for late running tasks Probability Confidence Cost

Probabilistic and Conditional Branching Probabilistic Branching Define the probability of various paths through the project logic being executed For example: There is a 10% chance of re-work after QC inspection Conditional Branching Make a decision which path to execute based on the expected completion date of specific tasks For example: If material is delivered after June 28 then we will outsource installation.

Correlation Full Monte allows the definition of Groups that can be used to model the impact of external influences across multiple activities For example: A group called Weather can be defined and the influence of Weather on multiple transportation activities can be defined as a percentage

Correlation – Scatter Plot

Schedule Quality Check DCMA 14pt Assessment Analyze your project for compliance with all 14 of the DCMA schedule metric guidelines Industry Best Practice More than 10 additional metrics compared to the DCMA schedule assessment User Configurable Selection and Criteria Modify exclusions and thresholds

Schedule Quality Check

Integrated into Microsoft Project 2010

Integrated into Microsoft Project 2007

Sophisticated Data Editing Integrated Navigation Enter Optimistic and Pessimistic values as Durations or Percentages

Global Edits Control what gets updated

Comprehensive Analysis Options Choose either Project Completion or Specific Milestones for Sensitivity Analysis

Easily find available Graphical Reports

Histogram Reports

Intuitive navigation to relevant information Detail Task Results With immediate access to appropriate graphs

Gantt Charts Combined Deterministic, Expected and Sensitivity

Compatible with Deltek Risk+ Data Full Monte can convert and utilize existing Deltek Risk+ information including duration estimates and distribution types. Full Monte features customizable mapping to Microsoft Project fields to enable co-existence with existing add- on/customer use of user fields.

Fast… 1000 Simulations on 3600 tasks in around 30 seconds