Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Sept. 30, 2004 NIKHEF-1 Hans de Vries Status NIKHEF Mechanics Secondary vacuum box Bellows Vacuum system CO 2 cooling: Bart Verlaat.
GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
Vacuum Technology Part II of the “What exactly do we have down there?” series.
Matthew Hills Hydrogen System – Piping and Instrumentation Diagram.
PWF 3/01 Plasma Fueling Program1 Pumping Systems for ITER, FIRE and ARIES P. W. Fisher Oak Ridge National Laboratory C. A. Foster Cryogenic Applications.
H 0 -H - PSB INJECTION VACUUM REQUIREMENTS C. Pasquino, P. Chiggiato, J. Hansen PSB - H0-H- injection review meeting, 18th April 2013.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
PEEM III Endstation Design Review
Process and Product Engineering Markets: Liquid Food Industry Pharma and Medical Industry Scientific Research Aerospace Industry CATI-A Design Pro/E Design.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato LIU - PSB Ho-H- Injection Meeting 1.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Construction of Wendelstein 7-X Max-Planck-Institut für Plasmaphysik
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
M. WONGPIXEL MECHANICAL GROUP MEETING 14 JAN % Model Outgassing Rate Measurement Model building status Setup Method explanation –Throughput method.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
PIMS IN INSTITUTE FOR NUCLEAR STUDIES Brazing Andrzej Soltan Institute for Nuclear Studies.
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
WENDELSTEIN 7-X Basismaschine Design Review Plasma Vessel Max-Planck- Institut für Plasmaphysik J. Reich, W7-X BasismaschineDesign Review Plasma Vessel.
Max-Planck- Institut für Plasmaphysik Karsten Liesenberg / AS-T Visit NCSX engineers 11/12 October 2007 Final assembly of Stellarator W7-X in the torus-assembly.
Max-Planck-Institut für Plasmaphysik 21 st IAEA Fusion Energy Conference, Chengdu, 16 – 21 October Experience Gained during Fabrication and Construction.
OLAV III Experience with the LHC Insulation Vacuum System S. Blanchard, P. Cruikshank, B. Jenninger, N. Kos, W. Maan, L. Mourier, N. Provot, J. Wallner.
CM28 - Vacuum System Update Matt Hills Mike Courthold 1.
National Ignition Facility Vacuum Systems Presentation to OLAV Workshop, ORNL July 11-14, 2011 NIF Vacuum Subsystems Managers Igor Maslennikov* John Hitchcock.
Max-Planck- Institut für Plasmaphysik U. Schultz, Assembly- Technology Working package Port assembly 1 Working package Port assembly Uwe Schultz.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Installation of the T600 at Fermilab CSN2, September 22,
Vacuum Technology and Components for Cryogenics
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Cryo Pump Limitations Recent operating issues with helium Mick Mann ANSTO – Lucas Heights - Australia.
Vacuum conditions in PANDA pbar-line Alexander Gruber, SMI, Vienna, Austria.
A. Kraemer, OLAVIII, July 11th, Gas Loads into SIS100 Cryogenic Vacuum Sections A. Kraemer, Calculations and Transparencies courtesy of St. Wilfert.
DESIGN AND PERFORMANCE OF VACUUM SYSTEM FOR HIGH HEAT FLUX TEST FACILITY Rajamannar Swamy*, Prakash Mokaria, Samir Khirwadkar, Sunil Belsare, M S Khan,
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
LCWS11 WG4 Fully featured accelerating structure engineering design
SIS 100 Vacuum chamber Recooler String system Components
Installation of the T600 at Fermilab
He Plant, LN2 Systems and Commissioing
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Sub-system integration for the VBOX
HFM Test Station Main Cryostat
RTML Vacuum System RDR Summary FermiLab October 24, 2007
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Challenges of vacuum chambers with adjustable gap for SC undulators
Leak Detection Tutorial Work
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
Introduction to W7-X Coil Testing at CEA – Saclay, France
Preparation of Components for the Mounting of
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Welds in the magnet system
On the accuracy of port assembly at Wendelstein 7-X
Vacuum System Design for the Target Monolith System
Presentation transcript:

Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October 2007 Vacuum Systems at Wendelstein 7-X and Leak Testing during Assembly Insulating vacuum in the cryostat Ultra-high-vacuum in the plasma vessel Interspace Vacuum system for multilayer bellows, double sealings, control coils, el. feedthroughs Evacuation of the gas inlet into the plasma vessel – already working Insulating vacuum in cryostats of the gyrotrons ECRH – already working Vacuum system for pellet injection Vacuum system and gas inlet NBI Insulating vacuum ICRH Vacuum systems for diagnostics (many) Vacuum system for the cooling machine...

Heinz Grote2 Max-Planck-Institut für Plasmaphysik, EURATOM Association Leak testing Strategy All components to be assembled are leak tested with Helium or SF 6 -before delivery (qualification of the workshops varies) -during incoming inspection -after re-work -on the assembly stands immediately after welding or mounting of the sealings -finally in an integral leak test after closing the cryostat and the plasma vessel Where ever possible pressure gradients during testing are equal as in working condition Where ever possible tubes and weldings of cryogenic parts are tested at temperature of LN 2

Heinz Grote3 Max-Planck-Institut für Plasmaphysik, EURATOM Association Leak testing Equipment (1) All large components are leak tested with Helium in a vacuum tank Volume: 55 m³ inner diameter: mm max. inner height : mm max. height of load (crane height): mm max. weight of load: kg base pressure (< 2*10-7 mbar empty tank) (< 3*10-5 mbar loaded with W7-X coil) double–O–ring seal [Viton] with interspace pumping 26 CF-ports various size pumps: 4 x 65m³/h rotary vane pumps, 2 x 1.000m³/h roots-pumps 2 x cold traps 2 x l/s turbomolecular pumps, used for W7-X coil Paschen tests, He-leak tests of superconductors and He-cooling tubes on coils, support structure etc.

Heinz Grote4 Max-Planck-Institut für Plasmaphysik, EURATOM Association Leak testing Equipment (2) All joints and weldings are leak tested locally with special designed chambers or flexible bags Variety of silicone sealed leak detection chambers made of stainless steel

Heinz Grote5 Max-Planck-Institut für Plasmaphysik, EURATOM Association Leak testing Equipment (3) Leak detection chamber made of Al sealed with Tacky Tape

Heinz Grote6 Max-Planck-Institut für Plasmaphysik, EURATOM Association Leak testing Equipment (4) Leak detection chamber made of stainless steel foil sealed with Tacky Tape

Heinz Grote7 Max-Planck-Institut für Plasmaphysik, EURATOM Association Leak testing Equipment (5) Silicone sealed stainless steel chamber for assuring 100 % He-atmosphere during leak testing Temperature sensor He- service pipe Data logger Leak testing at 77 K

Heinz Grote8 Max-Planck-Institut für Plasmaphysik, EURATOM Association Mechanical Pumping System - Cryostat Requirements during pump down Requirements during pump down from atmospheric pressure Evacuation down to 1 mbar 24 hours Evacuation down to 1 * mbar72 hours (from 1 down to 1 * mbar in 48 hours) Cooling down p < 1 * mbar Outgassing rate of the insulation 1 * mbar * l/(s * m²) Load of the insulation with water vapor0.25 g/m² Amount of the insulation30 layers á 1,400 m² (conservative assumption)

Heinz Grote9 Max-Planck-Institut für Plasmaphysik, EURATOM Association Mechanical Pumping System - Cryostat Working requirements, Geometry Working Requirements Max. partial pressure (He)1 * mbar Max. tolerable leak (He)1 * mbar*l/s S eff >= 1,000 l/s (inside the cryostat) 1,000 l/s in the cryostat 2,000 l/s at the port 3,180 l/s Geometry Ports for pumping 3 per module (= 15 overall), diameter 500 mm each Volumeapprox. 500 m³

Heinz Grote10 Max-Planck-Institut für Plasmaphysik, EURATOM Association Mechanical Pumping System - Cryostat Layout Pumping set on each of the 5 modules Gate valve DN 320 ISO F Tube DN 320, length 4 m Bypass DN 100 TMP 2,000 l/s Rotary vane pump 65 m³/h Roots pump 250 m³/h) ) on 2 modules only Rotary vane pump 65 m³/h)

Heinz Grote11 Max-Planck-Institut für Plasmaphysik, EURATOM Association Mechanical Pumping System - Cryostat Present status Uwe Schultz

Heinz Grote12 Max-Planck-Institut für Plasmaphysik, EURATOM Association Pumping System for Plasma Vessel - Base pressure, UHV-conditions, mbar Turbomolecular pumps (TMP) - Experimental, mbar Hydrogen (Deuterium, Helium) up to mbar in the Divertor high gas load Cryopumps, TMP + Roots + Rotary-pumps (3-stage mechanical pump system) - Regeneration of Cryopumps with TMP - Pumping through divertor gap:Cryopumps behind the target modules TMP: 10 individual systems 1 in each divertor unit at the ports AEH and AEP

Heinz Grote13 Max-Planck-Institut für Plasmaphysik, EURATOM Association Pumping System for Plasma Vessel Requirements for the Pumping System Experiment: 3*10 21 s *10 21 molecules*s -1 ~ 50 mbar*l/s Pressure in Divertor: 100*10 3 l/s cryo pumps: 75*10 3 l/s for H 2 TMP: 25*10 3 l/s for H 2 Pump down: ca. 1,300 m² inner surface, (1,000 m² stainless steel, 300 m² carbon, B 4 C) outgassing: 1*10 -7 mbar*l/(s*m²) (SS), 1*10 -6 mbar*l/(s*m²) (C, B 4 C), total: 4*10 -4 mbar*l/s base pressure : 40*10 3 l/s TMP only

Heinz Grote14 Max-Planck-Institut für Plasmaphysik, EURATOM Association Pumping System for Plasma Vessel Mechanical pumping system – Layout of 1 unit Pumping gap  2,430 l/s  2,870 l/s node:  3,200 l/s 2*1,850 l/s = 3,700 l/s Pumping gap  1,340 l/s  1,460 l/s 1,850 l/s Port AEH Port AEP Total approx.: 37.7*10³ l/s  25*10³ l/s at the ports AEH alone necessary for operation in the standard case, where the interaction zone of the plasma with the divertor targets is located near this port

Heinz Grote15 Max-Planck-Institut für Plasmaphysik, EURATOM Association Pumping System for Plasma Vessel Location of the Ports Pumping ports AEP AEH

Heinz Grote16 Max-Planck-Institut für Plasmaphysik, EURATOM Association Pumping System for Interspace Vacuum Present status 38 rectangular and oval ports with multilayer bellows (Plasma Vessel) 1 – 100 mbar to be vented only if both the cryostat and the plasma vessel are vented 40 rectangular and oval ports with double sealings (Plasma Vessel) ~ 0.1 – 1 mbar to be vented together with the plasma vessel 146 cryostat ports with double sealings ~ 0.1 – 1 mbar to be vented together with the cryostat 3 independent roughing vacuum systems – fivefold each according to W7-X modules (dry roughing pump, valve, measuring gauge, tubes to ports DN12-20) 10 control coils will have interspace vacuum to protect the plasma vessel from water leaks 14 electrical feedthroughs – not permanently pumped

Heinz Grote17 Max-Planck-Institut für Plasmaphysik, EURATOM Association Control Schematic for Pumping System W7-X based on SIMATIC S7-400 master programmable logic controllers part components W7-X Olaf Volzke central main control W7-X