GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004.

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

Spectrometer Solenoid Update Steve Virostek - LBNL MICE VC 150 August 23, 2012.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
LHC HARDWARE COMMISSIONING REVIEW May 2005 CRYOGENIC VACUUM SYSTEM Paul Cruikshank for AT/VAC.
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
SHMS Design, Engineering & Construction Status for Hall C Users meeting Paul Brindza January 2010.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Spectrometer Solenoids MICO 197 Steve Virostek LBNL August 15, 2012.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
SHMS Spectrometer Update Hall C 2008 Users Meeting Paul Brindza January 18, 2008.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Installation of the T600 at Fermilab CSN2, September 22,
Solenoid Status Paul Brindza Dec. 12, Status of work at IUCF Solenoid R&R is based on a MOU between JLAB and IUCF The MOU divides the work into.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
1 MICE absorbers work package MPB – 27/10/15 Mike Courthold Mark Tucker Phil Warburton Steve Watson.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Integration of the Spectrometer Solenoid Magnets
Teleconf ACS – FREIA 28th March 2017
12 GeV Project Status Glenn R. Young 12 GeV Project Status
Installation of the T600 at Fermilab
Status of the PANDA Solenoid Magnet Production in BINP
HFM Test Station Main Cryostat
LARP Vertical Test Facility
DOE/SC Status Review of 12 GeV SHMS HB Magnet: Update since Oct 2015
Mathew C. Wright October 2016
SoLID Magnet - Engineering and Cost
HRS at small angles for e+/ e- pair for APEX
SNS PPU Cryomodule Instrumentation
PANDA The conceptual design of the control Dewar
as a prototype for Super c-tau factory
Cryogenic behavior of the magnet
IR Beam Transport Status
SNS PPU Cryomodule Instrumentation
SC1R Cold Box PDR Assembly Sequence
ICARUS Internal Cryogenic Sensors
Presentation transcript:

GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004

GlueX Detector and Solenoid

Solenoid showing new stand and Iron yoke fillers

GlueX Solenoid- Properties Max central field 25 KG Length 195 Inches Clear bore 73 Inches Weight of yoke 226 Tons Weight of Coils ~ 80 Tons Max current 1800 Amps Stored Energy 36 Mega Joules

GlueX Solenoid Recent Progress Coils #1 and # 2 are now complete! Refurbishment activities are complete and the coils are being prepped for storage and shipment to JLAB. Coils have been cold tested three times. Business Preparations for Coil 3 and 4 R&R are underway, expect start after October.

GlueX Solenoid Recent Progress Major new items in coils 1 and 2 include Six new Strain Gauges on coil supports to replace the mostly broken originals. Eight new PT-102 Platinum Resistance Thermometers on shield to replace original Thermalcouples ( still working) New Aluminized Mylar Multi Layer Insulation on Shields and coil of #2 cryostat

New MLI Insulation on Coil #2 Helium Vessel

GlueX Solenoid Recent Progress New Internal Conflat Flange Cryogenic connections on all four coils.8 per coil. These replace the original cut and weld joining technique. New 18 Inch vacuum bellows on coils 1,2 &4, Coil 3 TBD. Originals failed during first vacuum tests due to corrosion. New pump out flange on Coil #4.

GlueX Solenoid Recent Progress Coil #2 Leak in Helium Vessel near seal weld found and fixed. Coil #1 Shield leak found and fixed in supply pipe. Coil #2 piping error found and fixed. Two thirds of the shield in Coil #2 was isolated ie. non functional due to inlet and outlets found connected together.

GlueX Solenoid Recent Progress Coil #2 showed a 2 hour leak response during the final Helium Mass Spec. leak test indicating a possible 5 x 10 ^-8 torr-liter/sec leak in the shield. Coil #2 pressure test at 100 PSIG OK. Coil #1 passed its Helium Mass Spec. leak Test but failed its pressure test at ~30 PSIG! Coil #1 new leak was traced to corrosion in a LN2 supply line. Corrosion was confirmed at ODU. Coil #1 was repaired by replacing the pipe and retested.

New LN2 connection on Coil #1 Corrosion leak was near here.

GlueX Solenoid Recent Progress Due to the failure of the Coil #1 shield at low pressure during pressure testing, a decision was reached to do a cold test of coils 1 and 2 shields with LN2. Helium Mass spec. leak tests would be performed before, while cold and after warming. Test sequence repeated three times for each coil.

GlueX Solenoid Recent Progress Coils one and two passed all cold tests with no indication of leaks on a Helium Mass Spec. Leak detector with typical sensitivity of ~ 7 x 10^-10 torr-liter/sec! Coils one and two passed pressure tests at 100 PSIG! New instrumentation works Too! This engineer sleeps thru the night again!

Cold test gear and Temp. readout

Robin Strain starts the LN2 Coil 2

Bill Losowski and Leak Detector

Lead Tech Jeff Self, Suzie and Buckwheat

IUCF management nods its approval

GlueX Solenoid-Conclusions GlueX has two really good coils now! Coils 3 and 4 rework to be complete in FY JLAB Test Lab Space for Solenoid assembly and test secured and available for occupancy in January 2005.

GlueX Solenoid-Cost and Schedule Detailed schedule with resources to complete solenoid thru installation. Time phased cost to complete installation in 2009 with a yearly expenditure of ~300K$! Significant limitation is manpower availability. Techs for solenoid assembly and test, Mechanical designer for new solenoid components. Controls software seems OK.

GlueX Solenoid – Cost summary Cost to move from LANL 368 K$ Cost of New DC system 132 K$ Cost of refurbishment to date 297 K$ No JLAB salaries included so far! Cost to complete refurbishment 1467 K$ This includes cold testing in Test Lab. Cost to Install in Hall D 175 K$