Marcel Vreeswijk (NIKHEF) The NIKHEF Muon Mission Drift tube wiring Chamber assembly X-ray scan of BOL-0 at CERN Status and Plans The Making of ATLAS Muon.

Slides:



Advertisements
Similar presentations
Alignment systems for GlueX GlueX Collaboration Meeting Bloomington, Indiana May 20-22, 2004 Courtesy of Dimos Sampsonidis, Aristotle University of Thessaloniki.
Advertisements

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI1 TPC Laser system  Functions of the system  Basics of the design  Construction tolerances.
Marcel Vreeswijk (NIKHEF) Assembly Station - general Introduction Tube placing + Gluing + test Summary: Status & Plans The.
BML chamber assembly Maria Curatolo LNF/INFN. Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Granite Table Granite table (on.
1 Program Introduction MDT Chamber Production Silicon Tracker Project Software & Physics Frank Linde (15’) Marcel Vreeswijk (25’) Nigel Hessey (25’) Stan.
Status of the ATLAS MM project
Projective platforms gluing for ATLAS chambers J.-Ch. Barrière, V. Gautard, P. Ponsot, Y. Reinert, Ph. Schune for the Saclay muon hardware group CEA Saclay.
DESY Zeuthen 1 Precision drift chambers (MDT) for ATLAS muon system. G.Chelkov JINR (Dubna) DESY Zeuthen 10 September 2002.
Status Update on Mechanical Prototype in Rome November 6,
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
University of Athens ATLAS BIS MDT assembly HEP 2001 Presented by Heraklion, 6-8 April 2001 D. Fassouliotis D. Fassouliotis.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Marcel Vreeswijk (NIKHEF) The Assembly of ATLAS Muon 2m 5m5m NIKHEF Muon Mission: 96 Barrel Outer Large (BOL) chambers Tube Production.
1 Program Frank Linde (45’) Marcel Vreeswijk (45’) Jan Spelt (45’) Robert Hart (15’) Tours: 14:00-15:00 CAVE (60’) 15:00-16:30 BOL-room (60’) Site Review.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
Optical Alignment System (OASys) Masters Thesis of Yuki Ikeda Rikkyo University Presented by Itaru Nakagawa RIKEN/RBRC 1.
Platform positioning during MDT construction Tool for the platform positioning Ph. Schune J.-Ch. Barrière P RAXIAL A LIGNMENT S YSTEM (barrel) positioning.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
NIKHEF ATLAS MUON group: H. vdGraaf, F. Linde, G. Massaro, M
The barrel reference system1 THE BARREL REFERENCE SYSTEM C.Guyot (Saclay) Goal: Provide a geometrical survey of the whole barrel muon spectrometer.
The RASNIK Alignment System. Particle Physics CERN, Geneva, Swiss.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
Status Report of activities in LNF Soldering procedure 1.Status of soldering machine 2.Measurement of wire position Chamber prototypes 1.Construction of.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Marcel Vreeswijk (NIKHEF) AGENDA Xray tomograph -BOL0 results (Martin) BOL0 and BOL2 Features (Graziano) Discussion (All) Features and Mysteries of BOL.
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
Marcel Vreeswijk (NIKHEF) Assembly Station - general Introduction Tube Production Tube placing Gluing + test Summary: Status.
1998 IEEE Nuclear Science Symposium, Toronto, Canada High-Precision, Large-Volume Particle Tracking U. Bratzler* Outline (Example: Muon Tracking in ATLAS)
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Muon-raying the ATLAS Detector
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Marcel Vreeswijk (NIKHEF) Introduction The NIKHEF production Three Production Schemes –MPI NOW –MPI FUTURE –NIKHEF CLAMPS Conclusions Appended: photographs.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Luca Spogli Università Roma Tre & INFN Roma Tre
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Analyzing Praxial Platform Positions on MDT Barrel Chambers Using X-Ray Tomograph Measurements Chris Hayward Advisor: Silvia Schuh August 14, 2003 UM CERN.
Precision Drift Chambers for the ATLAS Muon Spectrometer
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Calibration and production of PRAXIAL (*) sensors for the ATLAS muon spectrometer Optical Metrology - SPIE Optical Measurement Systems for Industrial Inspection.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
1 ATLAS Muon Spectrometer Alignment LHC Days in Split, 5-9 Oct J.Krstic, M.Milosavljevic Institute of Physics, Belgrade D.Fassouliotis,C.Kourkoumelis,
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Marcel Vreeswijk (NIKHEF) The NIKHEF Muon Mission Chamber assembly Assembly QA Assembly QC Summary, Status and Plans The Assembly of ATLAS Muon chambers.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
1 TRACK CHAMBERS BASED ON PRECISION DRIFT TUBES HOUSED INSIDE 30 mm MYLAR PIPE A.Borisov, N.Bozhko, R.Fakhrutdinov, A.Kozhin, B.Leontiev, A.Levin.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
Llea Nasira Samuel Benedict College Charlotte Wood-Harrington
Structure and etc Shoji Uno (KEK) at B2GM
Production & QA of BOL chambers
Overview of the Frascati Production Facilities
Z. Szillasi On behalf of GEM Alignment group November 15, 2017
Gas Monitoring Chamber Production Status
Presentation transcript:

Marcel Vreeswijk (NIKHEF) The NIKHEF Muon Mission Drift tube wiring Chamber assembly X-ray scan of BOL-0 at CERN Status and Plans The Making of ATLAS Muon

Marcel Vreeswijk (NIKHEF) NIKHEF Muon Mission West side has expansion length o 0.1m in Xras s Construct: 96 Barrel Outer Large (BOL) chambers High Mechanical Precision: 20  m RMS on wire positions This talk: BOL-0 and Serial Production 2m 5m BOL=spacer+2x3 drift tube layers+ In-Plane alignment

Marcel Vreeswijk (NIKHEF) Tube wiring + QC Drift tubes: Extruded aluminum drift tubes (3cm) Wire (50  m gold-plated tungsten) positioned by two end-plugs QC on drift tubes, specs: Wire position: |Z,Y|<25  m Wire tension=> frequency Hz, RMS<0.3Hz Leak rate: < bl/s HV check: Endplug

Marcel Vreeswijk (NIKHEF) QC-Wire position Wire position Spec: |Y,Z|<25  m s EndPlug Drift Tube Coil Rejection <<1%: 2 tubes with Z> 50um (1 checked: no twister) cut For BOL-1 All tubes checked In future: Fast pre-check endplug No twister to position wire RMS: ~6  m

Marcel Vreeswijk (NIKHEF) QC-Wire tension Quality Control on drift tubes, specs: Wire Frequency: 27.2 (+-1.4)Hz, RMS<0.3Hz Rejection <<1%. s Horse-shoe magnet Drift tube Principle: Lorentz force on current through wire causes vibration Frequency RMS: 0.17 Hz Tension re-measured just before gluing on table (checks creep + broken wires)

Marcel Vreeswijk (NIKHEF) QC-Leak Rate + HV Quality Control Leak rate: < bl/s HV: < 20nA at 3400V s Drift tube (1% He)Vacuum chamber HV He sniffer Principle: Automated ‘Matrix’ for 80 tubes

Marcel Vreeswijk (NIKHEF) Rejection 1% (!) QC-Leak Rate s 3 tubes inspected: 1 physical hole in aluminum 2 ‘dust’ on O-ring Leak rate is low: from 3bar to 2bar takes several years!! bl/s Leak-rate spec

Marcel Vreeswijk (NIKHEF) QC-HV A typical ‘Matrix’ fillA typical ‘Matrix’ fill s Gauge Tube with excess<<spec. Measure 5hrs. Average last 3hrs Tube nr Current (nA)

Marcel Vreeswijk (NIKHEF) Chamber Assembly West side has expansion length o 0.1m in Xras Spacer monitored by RASAS Situation mid 2000 Sphere tower with changeable block to adapt to tube layers NIKHEF Comb Frascati comb RASAS tower ‘Ear’ with sphere and RASAS-MASK In-plane mask In-plane lens Xplate longbeam s No Flexo

Marcel Vreeswijk (NIKHEF) ‘RASAS’ Monitors s Monitor positioning during assembly by RASAS monitor: Changeable blocks Support ‘ear’ which holds the mask The RASAS tower which holds the camera and lens xplate Block 1 Block 2 Block 3 Ypitch mm Scatter 5um Measured temperatures explain (small) drift

Marcel Vreeswijk (NIKHEF) s Tube diameter 3cm Distance 65  m tube Side ropeCentral rope Gluing BOL-0 2 x glue units 2x3 glue nozzles Tube layer 1 central ropes Spacer glued on layer 1 Tube layer 2 central ropes Spacer+1 glued on layer 2 Tube layer 3 central+side ropes Spacer+1+2 on layer 3 etc….

Marcel Vreeswijk (NIKHEF) Sag Compensation Sagcompen- sation tower Additional weight for balance s Own weight leads to large sag of xplates Compensate (at Bessel points) with pneumatic system Need typical P=3bar (8 towers) to carry chamber (150kg) Residue: order 10  m

Marcel Vreeswijk (NIKHEF) Gluing BOL-0 s Glue: Days needed 1 Glue Spacer 1 1st layer+platforms 1 spacer on 1st 1 2nd layer+spacer 4 layers Total <10 days

Marcel Vreeswijk (NIKHEF) The BOL-0 s The BOL-0 was mechanically finished Dec 5th 2000 Next, studies: X-ray scan

Marcel Vreeswijk (NIKHEF) s in Tomograph

Marcel Vreeswijk (NIKHEF) s in Tomograph Wire positions RMS 16  m Analysis of Martin Woudstra

Marcel Vreeswijk (NIKHEF) Test stand s DATCHA DATCHA Like cosmic ray setup at CERN (shutdown in 2000) Test of alignment principle with prototype muon sector, using cosmic tracks --> 10  m on sagitta

Marcel Vreeswijk (NIKHEF) Test s Tests five chambers using cosmic rays (end 2001) Checks wire positions Checks DCS + DAQ Trigger modules, consisting of 50cm iron, with two layers scintillator. Ecut>1GeV Expected rate: 100Hz

Marcel Vreeswijk (NIKHEF) Status and Plans Finished BOL-0 at NIKHEF (dec. 5th 2000) with high mechanical precision (16  m RMS) Quality Control automated Production of tubes started May 2001 Now: Produce first chamber Expect to finalize 10 chambers by end 2001 Produce 1chamber/2weeks: 24 chambers/year -> finish summer 2005 Late 2002, evaluate need to speed up chamber production (work weekends and/or two gluing steps/day) Cosmic ray setup operational end 2001

Marcel Vreeswijk (NIKHEF) Sag Compensation Xplate sag before and after compensation s After sag adjustment we observe (almost) symmetric sags for chamber up and down positions-> no stress Chamber up Chamber (upside) down Understood within +-10  m

Marcel Vreeswijk (NIKHEF) Gluing BOL-0 RASAS monitors SE NW SW NE Global Z, RASAS X Global X Stability in Y appears good Relatively large Z movement layer 6 (spacer floats on glue?) s Lever arm in stacking block Global Z Global Y (up)

Marcel Vreeswijk (NIKHEF) Temperature Stability s Aluminum expands 24um/ o C/m, Granite 7um/ o C/m Under normal conditions, temperature stable within o C Test case: increase temp. by 1 o C: check RASAS monitors Xplate 2.4m fixed monitor granite Free to expand Raw: 50um Correct for AL 24um/ o C/m + Correct for granite 7um / o C/m

Marcel Vreeswijk (NIKHEF) Assembly Station West side has expansion length o 0.1m in Xras Granite table: 6m x 2.5m Three bare Cross-Plates are positioned on the station, carried by sphere holders The combs which will support the tubes are also visible In the background: wiring station, Quality Control setup(s) Situation mid 99 North X East Z Up Y s

Marcel Vreeswijk (NIKHEF) Alignment West side has expansion length o 0.1m in Xras s Projective alignment In-Plane Relative measurement of three points. Accuracy 1 um the coded mask ~ 100um block size Alignment scheme:

Marcel Vreeswijk (NIKHEF) RASNIK Components provided by NIKHEF s Light source + mask Image sensor Lens + holder

Marcel Vreeswijk (NIKHEF) ATLAS-Muon West side has expansion length o 0.1m in Xras Magnet system: air core toroid, End cap toroid constructed in the Netherlands s B field measurement by Hall probes (on CAN bus) designed and provided by NIKHEF |B Hall | - |B coil |  0.02% calibration

Marcel Vreeswijk (NIKHEF) QC-Leak Rate Quality Control on drift tubes, specs: Leak rate: He (4 bar) 2.5 x bl/s s Drift tube (1% He)Vacuum chamber HV (future) He sniffer cut Rejection 4% Leak rate is low: from 4bar to 2bar takes several years!!

Marcel Vreeswijk (NIKHEF) BOL-0 Heat Studies (No flexoos in BOL-0) s Inplane Yrasnik= 2 x sag The BOL-0 was covered with heat blankets, producing 50W/m 2 Gradient between MLs: 2.5 to 4 o C Sag of Chamber: 200um  50 to 80 um/ o C= acceptable Sag of xplate: 25um  6 to 10 um/ o C = acceptable 400um Yrasnik= 2 x sag Xplate 50um Chamber sag Xplate sag