Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Hydrogen Pre-Operation Safety Review 4 th October 2011 Hydrogen R&D System Operational Procedures and Test Plan M Courthold.
Palestine TV Test Jason Link University of Hawaii ANITA Collaboration Meeting at UCI 4/7/05 – 4/9/05.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
MICE collaboration meeting RAL 28 October 2004 Absorber R & D Plan by Wing Lau – Oxford University.
1 Technical Arguments in Favor of using the Cryomech PT-415 Cooler for Cooling the LH 2 Experiment Michael A. Green Lawrence Berkeley Laboratory Berkeley.
Magnet and Absorber Heat Loads and Cooling with Various Small Coolers
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
MICE - UK Project Progress Roy Preece 30 th April 2013.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
Instrumentation and Controls Test Plan Review 17 th February 2012 Roy Preece (STFC RAL)
HD target.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Hall D Target Design Status Jim Fochtman- February 22, 2012.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Subjects for SC FF magnet system at ATF2 Infrastructures at ATF2? How supply cryogen at ATF2 (set up cryogenic system?) (Gas helium recovery line?) Set.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
Installation of the T600 at Fermilab CSN2, September 22,
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
MICE Absorber and Focus Coil Magnet – Test Results
Teleconf ACS – FREIA 28th March 2017
Installation of the T600 at Fermilab
Cryogenic behavior of the cryogenic system
MICE Meeting at RAL, Oct-23, 2005
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Jason Link University of Hawaii
SNS PPU Cryomodule Instrumentation
SNS PPU Cryomodule Instrumentation
Presentation transcript:

Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)

Leak Checking –Wang leak checking Helium chamber envelope. Helium chamber has been checked for leaks before welding cooler tubes In last week, we have pumped the MICE#2 LHe system to 3 to 5 micron vacuum with booster pump, then we fully open the VEECO MS-50 leak detector while we throttle booster pump to 40-50%. The sensitivity scale is 10E-09. There is no detectable leak. We then bag each possible leak port and find no leak. We have pump down 3 times & leak check. The last one was made after Mr. Lo made soldering additional superconductor to each of 2 pair of four feedthrus.Instrumentation – New sensors, harness and feedthroughs. External cabling and hardware. After welding of the cooler tubes to the Helium chamber stub tubes, the weld and brazing were checked for leaks. Same leak rate level a above. –Wang Leak Checking Vacuum envelope After closing the vacuum chamber envelope the volume will be pumped. Comprehensive leak checking will be carried out. The pumping of the volume may take 2 – 3 days to attain a good vacuum for the leak checking.

Vacuum Purging with warm N2 –As soon as the leak checking is complete. –Using a LN2 dewer for the gas delivery –Fermi Lab gas heater will be used, 120F gas temp –Purge for as long as possible. Installation –Fermi Lab team to install the system –Test running of the system Pump and Purge –Using the same heater system. –Cycle pumping and purging may take up to 2 weeks –Vacuum Vessel and Radiation shield Outgassing / Leak rate –Isolate pumping system and record the rate of rise of the vacuum.

Pre Cool Stage Liquid Nitrogen delivery system –Installation and initial operated by Fermi Lab personnel –Control the temperature of delivery. –Approximately 2 days for this stage Personnel –24 Hour operation to ensure uniform cool down. –Must have minimum of 2 people per shift –Minimum of 2 shifts per day, preferably 3 shifts LN2 –Enough supply onsite to pre cool to 80k Preperation for LHe –Use the fill line heaters to remove residual LN2.

Cool Down to 4K Preperation –Purge Helium chamber with Helium gas to remove residual Nitrogen gas. –Pump on Helium chamber –Repeat Purge and pump 5 – 7 times. Cryo Coolers –Once no Nitrogen gas is in the Helium chamber volume the cryo cooler can be turned on. –Monitor operation and temperatures at the first and second stages. Liquid Helium fill –After confirmation of the cooler operation –Slow fill of Liquid Helium can proceed –Monitoring of level gauges –When level is nearing the top of the volume move the stinger to the top input within the vent tube. Personnel –24 Hour operation to ensure uniform cool down. –Must have minimum of 2 people per shift –Minimum of 2 shifts per day, preferably 3 shifts

Operation Characterisation (Thanks to Alan Bross) –Instrumentation check – do all sensor measurements give meaningful information? –Investigation of heater control circuit (if running sub-atmospheric – we hope!). –Measurement of loads on all cryocoolers (1 st & 2 nd stage on two stage) as fn. of heater power. –Calculate heat load to shield and cold-mass (at desired heater power). –Possibly repeat the above at a few LHe levels. –Vacuum rate-of-rise measurement (check for cold He leaks). –Stable operation at set point (T, P and LHe level) for min of 24 hr.