STOPKIT Test - Ø14” & Ø6” Pipe Spools Set up 14”Ø Pipe 6mm Hole at Plain Pipe6”Ø Elbow 4mm Hole at Weld Heat Affected Zone Note:- Both pipe spools were.

Slides:



Advertisements
Similar presentations
“Stop the Leak”.
Advertisements

Oil & Gas drilling.
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Ways of ensuring something is level Leveling Tube A transparent tube that is filled with water. The water at the two ends will always be level. Spirit.
Fluid Mechanics.
Chapter 8 Forces in Fluids
Water Underground.
Cracks Longitudinal Transverse Crater Throat Toe Root
MENG 439 Dr. L. K. Gaafar Plasma Arc Cutting.
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
Are raindrops tear-shaped? Diameter < 2 mm Diameter 2 – 5.5 mm Diameter > 5.5 mm.
"AIR COOLER" Heat Exchanger
The Supreme Industries Ltd.,Gadegaon
Topic I.8. Water Supply Networks: Kinds, Structures and Design
Hydronic Mechanical Controls
DCP Meeting – September 12 th 2010 WP1/4: Leak Search & Repair- Paolo Petagna 1/9 PH-DT - WP1: REMOTE LEAK REPAIR- Update Report on status of leak analysis/quantification.
Lesson 30 Cementing - cont’d
DIFFERENTIAL MANOMETER
Outcome 3 (part 2) Heat emitters and their components Unit 208: Central heating systems.
Unit 2 Terms & Definitions.  Legal requirements designed to protect the public by providing guidelines for structural, electrical, plumbing, and mechanical.
Alpha Prototype Presentation Nov 4, Today’s Presentation: System Schematic Review Materials Analysis Materials Processing Tube Fabrication Joints.
MAGNA M a g n a D i g i t e c h I n d i a P r i v a t e L i m i t e d STEEL FABRICATTION TO DUCTILE IRON CASTING CONVERSION PROJECT NAME: CHARGE AIR PIPE.
What happens to rain or snow that falls on the ground?
1 6 th St. 250K Package Boiler th St 250K Boiler Condition Assessment Boiler condition – prior to cleaning  Boiler has been boiler shut.
HOUSTON, TEXAS1 Pipeline Repair ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.
TRENTON Casing Filler Presentation
Temperature Inversions
 Global warming is happening because of the cars smoke and the heat of factories and that even causes smoke, That smoke travels to the air and causes.
Formative Assessment. 1. Water flows at m/s down a pipe with an inner diameter of 1.27 cm. If the pipe widens to an inner diameter of 5.08 cm, what.
Heat and Sound Fluids 1 Pressure Specific Gravity Static Equilibrium Buoyancy.
The oil spill started in the Gulf of Mexico. The oil spill happened on April 20, It started with a swamp gas leak which caused an oil rig to explode.
Gas Laws Review. A sample of carbon dioxide occupies a volume of 3.5 L at 125 kPa pressure. What pressure would the gas exert if the volume was lowered.
3:00. 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52.
By Molly. Things that you will need  Fish tank  Grow bed tub  Water  Clay balls  Pipes  Oxygen pump  Water pump  Garden hose  Plants  Bucket.
Aerial Apparatus Operator Aerial Apparatus Testing.
Federal Aviation Administration OSU & NBS Updates 2009 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st &
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 11: STEAM PIPING SYSTEM (1)
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
The reading is 7.38 mm. The reading is 7.72 mm.
Leveling Tube A transparent tube that is filled with water. The water at the two ends will always be level. Spirit Level Tube incompletely filled with.
First Wall Panel - Overview
Installation of the T600 at Fermilab
Explosive Welding Welding Technology/ 3.3 Explosive Welding.
3.5 Pressure in Fluid’s Pascal’s Law.
Platform for moving and positioning Model test in small scale
Cryostat design Mechanical design: Thermal screens: Specifications:
Tensile Strength (MPa)
Date of download: 11/6/2017 Copyright © ASME. All rights reserved.
Organization Chart Part II.
Name: Angely K. Sandoval Grade: 7 Period: 5
Heat underground creates pressure which forces hot water upwards.
MICE Coupling Coil Update
Module 3 Domestic Heating/MMA Welding
Oil & Gas drilling.
Top Fire Protection Services Ottawa available on Dubinskyconstruction
Cooling System Test.
6.3 - Groundwater groundwater is the largest source of available fresh water for humans groundwater is stored in an aquifer movement of groundwater depends.
Ground Water Revised 12/16/09.
تهیه و تنظیم :حسین عروجی
بسم الله الرحمن الرحيم الموضوع:الوضوء صفته وفرائضه وسننه
Well Repair Installation of Well Liners
Ground Water Revised 12/16/09.
Industrial Stainless Clamp Band
Vocabulary Chapter 3: Lesson 1
Clamping and Boring Tools
U12-6 Warm-Up Wednesday, 05/08 What will happen to an aerosol can if it is thrown into a fire? Explain. Why is it possible to store large amounts of gas.
Both ends of the pipe will vibrate.
A 5. 0 L container has a pressure of 750 mm Hg
Pressure.
Presentation transcript:

STOPKIT Test - Ø14” & Ø6” Pipe Spools Set up 14”Ø Pipe 6mm Hole at Plain Pipe6”Ø Elbow 4mm Hole at Weld Heat Affected Zone Note:- Both pipe spools were Hydro tested at 120 BarG prior to drill to perform the STOPKIT TEST

Arresting an air Leak Under 7.0 BarG Pressure. Ear protection required due to high noise level. Leak Arrested at 10 N.m Torque. STOPKIT Test at 14ӯ Plain Pipe with a 6mm Hole Note:- After air test the spool was filled with water and successfully tested at 80 BarG - 20 N.m Torque

Water Leak with Initial Pressure kept at 2.5 BarG. As the leak rate started to be reduced the pressure was gradually increased to 80.0 BarG to assess the STOPKIT performance. STOPKIT Test 6” Elbow with a 4mm Hole at Weld HAZ

40 N.m Torque Applied Pressure 80.0n BarG STOPKIT Test 6” Elbow with a 4mm Hole at Weld HAZ 44 N.m Final Torque Minor Leak - Tear Leak Permanently Arrested

6” Elbow 14”Ø Pipe80.0 BarG STOPKIT Final Test at 80.0 BarG - Ø6” Elbow & Ø14” Pipe

STOPKIT 100 – Large Pad for Major Leaks 25mm Hole on Plain Pipe Pressurized up to 36.0 BarG. Evidence of Leak at around 30.0 BarG. Pressure Stabilized at 25.0 BarG – Leak Stopped STOPKIT 100

4mm Hole on Top of the Weld - Tested up to 36.0 BarG. No Evidence of Leaks STOPKIT 50 – Smaller Pad for pinholes STOPKIT 50