ACCA Legislative Conference Underground Storage Tank Compliance December 4, 2014 Lee Davis, UST Compliance adem.alabama.gov
UST Compliance Program Outline UST Program Overview Regulatory Requirements 2005 Energy Act adem.alabama.gov
Definition of UST Tanks and Piping Contains Regulated Substances 10% or More Underground adem.alabama.gov
USTs adem.alabama.gov
Regulated Universe Regulated Facilities ~ 5,600 Regulated Tanks ~ 15,300 Number of Tank Owners ~ 3,100 adem.alabama.gov
Inspectors 9 UST Inspectors in 4 Field Offices Approximately 400 inspections per inspector, per year adem.alabama.gov
Performance Standards USTs and Piping Fiberglass-Plastic Construction, or Steel and Protected from Corrosion Piping Nonmetallic, or adem.alabama.gov
UST adem.alabama.gov
Piping adem.alabama.gov
Performance Standards Spill Prevention To contain the volume of the delivery hose after disconnecting adem.alabama.gov
Spill Catchment Basin adem.alabama.gov
Performance Standards Overfill Prevention Activated by product level to prevent tank overfills adem.alabama.gov
Overfill Prevention Flapper Valve 4 1 2 3 2 3
Overfill Prevention Ball Float Valve 3 2 1
Regulatory Requirements Testing and Reporting Corrosion Protection Leak Detection Spill Catchment Basin Closure Suspected Releases adem.alabama.gov
Testing CP Test Cathodic protection test required once every three years adem.alabama.gov
Cathodic Protection System adem.alabama.gov
Impressed Current Anode adem.alabama.gov
Rectifier adem.alabama.gov
Galvanic Cathodic Protection System adem.alabama.gov
Release Detection Tanks – must have monthly method of monitoring for releases Pressurized Piping - must have annual line test or monthly monitoring Suction Piping – No monitoring required if “safe suction” adem.alabama.gov
Automatic Tank Gauge adem.alabama.gov
Testing Leak Detection Leak Detectors - equipment that will shut off or restrict flow of product if a leak is detected – Annual test Sump Sensors – Annual test adem.alabama.gov
Testing & Reporting SIR Annual Summary Report Line Tightness Tests Annual Line Leak Detector Tests Annual Cathodic Protection Tests 3 Year Spill Catchment Basins 3 Year adem.alabama.gov
Reporting Closure and Releases Permanent Closure of a UST System Suspected releases must be reported within 24 hours. Investigation and Corrective Action adem.alabama.gov
Suspected Release adem.alabama.gov
Secondary Containment Delivery Prohibition Operator Training 2005 Energy Act Secondary Containment Delivery Prohibition Operator Training adem.alabama.gov
Secondary Containment Effective August 6, 2007 Tank and Piping Manufactured with Inner and Outer Wall and Interstitial Space Interstitial Monitoring Only Acceptable Form of Leak Detection adem.alabama.gov
Submersible Pumps Effective August 6, 2007 USTs installed with submersible pumps on August 6, 2007 and thereafter, must have submersible pump containment sumps. adem.alabama.gov
Sub Pump Sump adem.alabama.gov
Under Dispenser Containment Effective August 6, 2007 New Dispenser System Includes Equipment Necessary to Connect to UST System adem.alabama.gov
Under Dispenser Containment adem.alabama.gov
Delivery Prohibition 2005 Energy Act Prohibition of delivery or acceptance of product for non-compliant UST facilities Penalty for owner and deliverer Regulations Effective April 25, 2008 adem.alabama.gov
Delivery Prohibition adem.alabama.gov
Delivery Prohibition Reasons Delivery prohibition may be imposed for failure of an owner to: Install, operate and/or maintain cathodic protection, leak detection, under dispenser containment, or spill or overfill controls Ensure compatibility of UST with product Perform required testing Pay regulatory fees Take corrective action for releases adem.alabama.gov
Delivery Prohibition ADEM Steps How will ADEM notify owners they are subject to delivery prohibition? Notice of Delinquency Notice of Violation Notice of Delivery Prohibition Opportunity to meet with Department adem.alabama.gov
Delivery Prohibition DP List How will ADEM notify fuel delivery companies that a facility is prohibited from delivery? Delivery Prohibition List on ADEM web site Delivery Prohibition List updated every Wednesday at 12:00 a.m. adem.alabama.gov
Delivery Prohibition Owner Response How can owners be removed from the Delivery Prohibition List? Return to Compliance Submittal of documentation ADEM will remove facility from list ADEM will send letter adem.alabama.gov
Operator Training adem.alabama.gov
Operator Training 2005 Energy Act Operators must be trained by August 8, 2012. Three classes of operator adem.alabama.gov
UST Trust Fund Registration Motor Fuel Substantial Compliance Orders Spill Prevention Overfill Prevention Corrosion Protection Release Detection adem.alabama.gov
AST Trust Fund Registration Motor Fuel SPCC Plan NPDES Permit adem.alabama.gov
UST Compliance Program I Can Answer Any Questions You May Have Now. adem.alabama.gov
Chief, UST Compliance Unit (334) 271-7759 mld@adem.state.al.us Contact Information – Lee Davis Lee Davis Chief, UST Compliance Unit (334) 271-7759 mld@adem.state.al.us UST Switchboard (334) 270-5655 ustcompliance@adem.state.al.us adem.alabama.gov