Progress and Plan for Superconducting RF Cavity RF Group.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Superconducting Cavities for Super- KEKB S. Mitsunobu.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Progress of SC RF Cavity during the RF Group May 10, 2007.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
ATLAS Intensity and Efficiency Upgrade ATLAS USERS MEETING Speaker: Mike Kelly Physics Division May 15, 2014.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Low-Level RF of BEPCII Sun YI IMAC’07 May. 11, 2007 IHEP.
4th BEPCII IMAC Meeting April , 2006 Status of BEPCII Storage Rings Ma Li April 26, 2006.
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
Detail plan of S1-Global H. Hayano (KEK),
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Overview of Main Linac Cryomodule (MLC)
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
Overview of Main Linac Cryomodule (MLC) Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Comments from the SNS Cryostat Design Review February 2010 Tom Peterson, Fermilab 15 February 2010.
Hao Guo LINAC Department Institute of Modern Physics.
HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Developments of new treatment techniques for SRF cavities at KEK HORIZONTAL HPR FOR PERFORMANCE RECOVERY Yoshiyuki MORITA Motivation of developing HHPR.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Recent Result for the STF-2 Cryomodule Operation
Cryomdoule Test Stand.
S1G Experiment Schedule Plan
CERN – Zanon discussions
Cryomodule test stand at ESS site
at STFC Daresbury laboratory
ILC-SCRF Test Facilities considerations
Definition of work flow for string DESY Example on critical operation
XFEL Vacuum System Commissioning
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
BEPCII RF POWER SOURCE AND INPUT COUPLER
XFEL Collimation and Beam Switchyard Vacuum Issues
IHEP Cryomodule Status
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Cryomodule Assembly Plan
CEPC-650MHz Cavity Cryomodule
SC1R Cold Box PDR Assembly Sequence
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Progress and Plan for Superconducting RF Cavity RF Group

Progress in Last Year Transport two SC cavity modules and couplers from harbor to IHEP by air-suspended truck Transport two SC cavity modules and couplers from harbor to IHEP by air-suspended truck Leak check after transportation (instructed by Prof. Mitsunobu, MELCO send a Supervisor to check all of things) Leak check after transportation (instructed by Prof. Mitsunobu, MELCO send a Supervisor to check all of things) Evacuate niobium cavity cell and insulation vacuum vessel, high pressure rising up of helium vessel and nitrogen cooling channel. Evacuate niobium cavity cell and insulation vacuum vessel, high pressure rising up of helium vessel and nitrogen cooling channel. Do leak test for niobium cavity cell and insulation vacuum vessel. Do leak test for niobium cavity cell and insulation vacuum vessel. Prepare clean work environment Prepare clean work environment Design and construct clean room of class 10 ’ 000 for cavity assembly in RF hall of building six. Design and construct clean room of class 10 ’ 000 for cavity assembly in RF hall of building six. Design and construct clean booth of class 100 for HOM damper assembly. Design and construct clean booth of class 100 for HOM damper assembly. Design and construct clean cap of class 100 for coupler assembly. Design and construct clean cap of class 100 for coupler assembly.

Progress … con ’ t (1) Assembly of beam taper, RF bellow, gate valve and ion pump, as well as vacuum gauge and mass analyzer together. It include two SBP and two LBP module Assembly of beam taper, RF bellow, gate valve and ion pump, as well as vacuum gauge and mass analyzer together. It include two SBP and two LBP module Ultrasonic washing, ultrapure water rinsing for each beam taper. Ultrasonic washing, ultrapure water rinsing for each beam taper. Connected all components on to the beam taper. Connected all components on to the beam taper. Leak test and high temperature baking. Leak test and high temperature baking. HOM damper baking (Prof. Furuya, a S.V from MELCO ) HOM damper baking (Prof. Furuya, a S.V from MELCO ) Ferrite surface check. (There exist a remarkable cracking on the ferrite of the SBP2 HOM damper, KEK borrowed their spare one to us via Melco) Ferrite surface check. (There exist a remarkable cracking on the ferrite of the SBP2 HOM damper, KEK borrowed their spare one to us via Melco) Connect HOM damper on the beam taper. Connect HOM damper on the beam taper. Baked four HOM damper by heated cycle water around 45 Celsius degree for two months. Baked four HOM damper by heated cycle water around 45 Celsius degree for two months.

Progress … con ’ t (2) Assembly of the No.2 SCC module (Prof. Mitsunobu and Furuya, a S.V from MELCO ) Assembly of the No.2 SCC module (Prof. Mitsunobu and Furuya, a S.V from MELCO ) Slow leak cavity, coupler and HOM damper in sequence. Slow leak cavity, coupler and HOM damper in sequence. Mount coupler on the cavity module. Mount coupler on the cavity module. Connect SBP and LBP HOM damper on to the both side of cavity module separately. Connect SBP and LBP HOM damper on to the both side of cavity module separately. Evacuate whole module and do leak test. Evacuate whole module and do leak test. Ion pump baking. Ion pump baking. Move the No.2 SCC module to the horizontal test room Move the No.2 SCC module to the horizontal test room Preparation for final performance test (Furuya, a S.V from MELCO ) Preparation for final performance test (Furuya, a S.V from MELCO ) Locate and adjust module to the right site in test room. Locate and adjust module to the right site in test room. High power waveguide connection. High power waveguide connection. Connect cryogenic transfer line and safety valve, some modification will be done. Connect cryogenic transfer line and safety valve, some modification will be done. Test the cooling air and water for doorknob and coupler. Test the cooling air and water for doorknob and coupler. …

Plan for next 2006/4/26~29. Assemble the No.1 SCC module. After assembly, it will be stored in the clean room of building 6 (Prof. Mitsunobu, a S.V from MELCO ) 2006/4/26~29. Assemble the No.1 SCC module. After assembly, it will be stored in the clean room of building 6 (Prof. Mitsunobu, a S.V from MELCO ) 2006/4/30~5/2. Room temperature aging for the No.2 SCC coupler (Prof. Furuya, a S.V from MELCO ) 2006/4/30~5/2. Room temperature aging for the No.2 SCC coupler (Prof. Furuya, a S.V from MELCO ) 2006/5/8~5/31. Performance test for the No.2 SCC (Prof. Furuya, a S.V from MELCO ) 2006/5/8~5/31. Performance test for the No.2 SCC (Prof. Furuya, a S.V from MELCO ) Cooling down. Cooling down. Coupler aging at cold stage. Coupler aging at cold stage. Performance test (Q 0 ~Eacc, Emax, static loss, tuning range, Q ext for the coupler port and etc.) Performance test (Q 0 ~Eacc, Emax, static loss, tuning range, Q ext for the coupler port and etc.) Warm up. Warm up.

Plan … Con ’ t 2006/6/1~8/31. Tunnel installation for the No.2 SCC (Prof. Mitsunobu a S.V from MELCO ) 2006/6/1~8/31. Tunnel installation for the No.2 SCC (Prof. Mitsunobu a S.V from MELCO ) Move to tunnel, locate and align this module Move to tunnel, locate and align this module connect both side gate valve with vacuum chamber. connect both side gate valve with vacuum chamber. Prepare and test for LLRF, Interlock, WG, Transfer line, Cooling water, Gas line for G.V, etc. Prepare and test for LLRF, Interlock, WG, Transfer line, Cooling water, Gas line for G.V, etc. 2006/6/7. Move the No.1 SCC to the horizontal test room 2006/6/7. Move the No.1 SCC to the horizontal test room 2006/6/8~7/7. Preparation for performance test for the No.1 SCC 2006/6/8~7/7. Preparation for performance test for the No.1 SCC 2006/7/8~7/31. Horizontal test for the No.1 SCC (Prof. Mitsunobu a S.V from MELCO ) 2006/7/8~7/31. Horizontal test for the No.1 SCC (Prof. Mitsunobu a S.V from MELCO ) 2006/8/1~8/31. Tunnel installation for the No.1 SCC 2006/8/1~8/31. Tunnel installation for the No.1 SCC 2006/9/1~9/24. RF co-adjustment and signal check with other system 2006/9/1~9/24. RF co-adjustment and signal check with other system 2006/9/25~ … Beam commissioning 2006/9/25~ … Beam commissioning

Assembly of beam taper, RF bellow, gate valve, ion pump, vacuum gauge and mass analyzer

Clean room, clean booth and clean cap

Check the ferrite surface of HOM damper by microscope

HOM damper baking by the heated cycle water

The No.2 SC cavity is ready for horizontal test

Request … Ask vacuum group to fabricate a section of substitution beam pipe for SC Cavity module. Ask vacuum group to fabricate a section of substitution beam pipe for SC Cavity module. Set a quick valve to isolate linac and storage ring in emergency to protect the SC cavity from a severe vacuum leak. Set a quick valve to isolate linac and storage ring in emergency to protect the SC cavity from a severe vacuum leak. Prepare some spare key components and one whole spare cavity module. Prepare some spare key components and one whole spare cavity module. >>>> THANKS >>> THANKS <<<<<