Eliminate Routine Well Site Checking
Backgrounder Advanced Flow Technology – Calgary, Alberta – 7 Years in gas well monitoring – 1 year oil well monitoring – Patented technologies using temperature and acoustics Len Johnson – 30 years’ CEO technology companies – Last company: Advanced Measurements Inc.
Goals Validation of potential in US market – We know the Great White North, but.. Beta Test Partner – Fall time frame
Well Site Visits Over 700,000 oil wells in North America – Majority low production, manually monitored – 50% of operator time spent checking! Is the well producing as expected? – Pump Working? – Fluid being produced? – At the expected levels Is there a leak at the well head?
Well Monitoring Choices: SCADA Controller : $10k-$25kBert: Have Truck Will Travel: $800 per well/month
Filling the Gap Field based system – Low Cost ($3,000 range) – Self Powered – Easy to Install: Any well, anywhere – Cellular Network for communication – Class 1 Div 1 – All weather conditions
Information Easy to access and understand – Simple – Available from Smart Phone, Computer… Provides answers to basic questions: – Pump working, – well producing at expected levels, – not leaking Manage by exception
Manage by Exception Green = all systems go Yellow = maybe a problem Red= go to the well Click on an icon to drill down for well status
Is the Pump Working?
Is the pump working?
Is Fluid Being Produced?
Is Fluid being produced? ΔT = VariableΔT = 0 FlowingNot Flowing
Normal : Well Producing
Reduced Flow
Well Down
Delta T: Simple but powerful Any flow change – Flow trends easily spotted Sub-surface problems spotted in near real time Big reduction in requirement to trouble shoot – Fluid shots, putting wells on test
Is It Leaking?
Considerations for Leak Detection Accurate detection of leaks – 0 false negatives – Very limited tolerance for false positives Timely – Within hours
Not a Problem
Problem?
Problem
Leak Notification Green well, all good Sliding scale for notification – Notify when somewhat oily? – Notify only when visit is required? – Different levels of notification for field vs. office?
Benefits of Reduced Visits Lower Costs – 50% of operator time spent on routine checking – Leak remediation costs reduced Fewer Safety Incidents Higher Production – Problems spotted immediately – Operator time shifted from problem finding to problem solving
Summary The pump is working Fluid is being produced – At the expected level There is no leak Do we need to send a guy to the well?
The Ask 2-3 parties to advise and assist Some personnel time required in field 5-10 wells each Fall for field beta test