AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System Zach Huston, Hayden Cummings, Adam Farnung, Tim Nichols, Robert Moshier, Andrew.

Slides:



Advertisements
Similar presentations
ADX 150 – Engine Repair ADX 170 – Climate Controls
Advertisements

Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
STEAM TRAPS.
1 DIESEL FUEL TOOL ON VEHICLE DIESEL FUEL SYSTEM SERVICE MODEL Rx HD 888 INSIDE FILTER.
AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System Zach Huston, Hayden Cummings, Adam Farnung, Tim Nichols, Robert Moshier, Andrew.
ELECTRONIC FUEL INJECTION. Introduction Strict emission standards require precise fuel delivery Computers used to calculate fuel needs EFI very precise,
when calibrating the sprayer
Measuring Erodibility of Cohesive Soils By Gregory J. Hanson USDA-ARS Hydraulic Engineering Research Unit.
AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System Zach Huston, Hayden Cummings, Adam Farnung, Tim Nichols, Robert Moshier, Andrew.
Reservoirs Covered in Ch. 5 of Vickers Text
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
Miniature Modular Rack Launcher Combo Senior Design Group 3 Casey Brown Cyril John Keith Kirkpatrick Bryan Rickards.
CCAS 3381 AUTOMOTIVE SKILL I ENGINE SUBSYSTEMS. OBJECTIVES To understand the operational principles and basic mechanisms of engine sub-systems Lecture.
 Latent heat  Sensible heat  Total heat  Specific heat.
Hydraulics.
Spray Finishing Operations/Spray Booth March 9, 2009.
SE-4000 Portable Eye Wash Spray Fixture The Speakman Company University of Delaware Team: Wes Doyle Nate Griffith Matt Jaskot Jason McKnight.
EDGE™ Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME),
FINAL PRESENTATION P The Team Austin Frazer Role: Lead Engineer - Analysis Major: Mechanical Engineering Eileen Kobal Role: Lead Engineer – Mixtures.
Piston Engine Operations
AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System.
AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System P
STEAM HEATING.
Hydronic Mechanical Controls
ELECTRONIC FUEL INJECTION COMPONENTS
SEMINAR ON “GASOLINE DIRECT INJECTION”
“We Bring Engineering to Life” U.S. Tobacco GAP – Barn Testing Procedure.
Gasoline fuel supply systems Function: store, transport, Pressurize and filter gasoline going to carburetor or fuel injection system.
EVAPORATIVE EMISSION CONTROL SYSTEMS
The Safe Transfer of Pressurized Gas. Collect the Necessary Tools and Equipment Safety Glasses for EVERYONE SCUBA Tank filled to 3000 psi Fill Station.
Percent Carbon on Platformer Catalyst by Volumetric Procedure CAUTION: Furnace tube is extremely hot! 1 Check system for leaks: a.Turn valve towards back.
Component Environmental Test Chamber Jeff Hughes 1, Peter Adam 1, Thong Vo 2 and Phong Ngo 2 1. Department of Mechanical and Material Engineering, 2. Department.
Air Conditioning International Mechanical Code
“DIESEL ENGINE” A SUMMER TRAINING PRESENTATION ON
Agenda Project Background Updated Requirements Chamber design
David Garvin Product Manager EarthDirEX Geothermal Copyright © 2015 Nortek Inc. All rights reserved.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Evaporative Emissions Control Systems (EVAP)
Supreme Power Engine Basics The four cycle engine.
Dental Systems. Dental Operating System with Headpieces  Used in the restoration of teeth and treatment of gum disease  The most common application.
What tests are necessary to make sure your kegs are being cleaned, sanitized and filled correctly By Andrew J. Brewer
P16680: AATech Universal Oil and Bag System Bryce Mowers Jessica Reed Maria King Nicole Anklam Philip Couturier Samantha Orlando.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Port Fuel Injection VS. Direct Fuel Injection The Basics of DFI The main focus of DFI is to effectively and precisely control the fuel-to-air ratio. To.
06/01/20161 Benny Hoff TÜV NORD Sweden AB AFS 2002:1 Use of pressure equipment.
P – , TOW TANK FOR TETHERED HYDROFOIL TEAM MEMBERS: Hope Alm (ME)Tim Buckner (ME) William Lentlie (ME) Andres Santizo Matheu (ISE) Shauna.
Calibration of your Field Sprayers using Shortcut Methods
P16680: AATech Universal Oil and Bag System Subsystem Design Review 10/20/15.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
Electrophotographic Cascade Development Apparatus Team 15503:Zach Foggetti (ME) Dalton Mead (ME) Bridget Kearney (EE) Ruishi Shen (ISE) Tom Wossner (ME)
Kaeser Rotary Screw Vacuum Packages
Flow Characteristics of Port Fuel Injection System P M V Subbarao Professor Mechanical Engineering Department Matching of Injector with Engine Requirements.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
The BioTector B7000i TOC analyzer with integrated oxygen concentrator
5 Principles of Engine Operation, Two- and Four-Stroke Engines.
CANTY QUICKPORTS™ “How they work”
Electronic Fuel Injection
GROUND SERVICING OF VARIOUS SUB SYSTEMS
14 Refrigerant Recovery, Recycling, and Recharging.
Electronic Fuel Injection
EVAPORATIVE EMISSION CONTROL SYSTEMS
Standard Operating Procedure
Gasoline electronic Fuel Injection Systems
Diesel Automotive Engines
ELECTRONIC FUEL INJECTION
Introduction of fuel feed system
Actuators Chapter 17 Lesson 5.
Preventive Maintenance
Presentation transcript:

AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System Zach Huston, Hayden Cummings, Adam Farnung, Tim Nichols, Robert Moshier, Andrew Heuser

Agenda Project Background Updated Requirements Chamber design Measurement System Action Items Fluid removal system

Background - AAT Advanced Atomization Technologies (AAT) Joint venture between General Electric Aviation and Parker Aerospace Specializes in manufacturing and testing fuel nozzles for gas turbine engines

Background - Project Fuel Injection Nozzle Testing System Qualifying fuel injection nozzles Specialized calibration equipment Expensive, odorous calibration fluid Problems with system Offensive odor permeates entire building Loss of expensive calibration fluid

Problem Definition All commercial aircraft nozzles must undergo a flow test to assure that requirements are met for spray angle. This test uses Stoddart Solvent (MIL-PRF-7024F Type II) Petroleum derived, clear, transparent liquid. The fluid is very expensive and has an offensive odor The current exhaust system is ineffective at both containing containing the odor and recovering the atomized fluid for reuse.

Project Schedule Represents Critical items

Customer Requirements

Engineering Requirements

Verification of Engr. Req.

Chamber Design Components: -Containment Chamber (Collection and containment of liquid cal fluid) -Airlock (Test location, isolation, purge) -Nozzle Fixture (Integration of both tests in one location, constrain and attach nozzle) -Gloves (Correct Material, ergonomics, attachment)

Full model

Ergonomic Analysis System must accommodate operator heights from 62” – 76” Shoulder width range: 16.1” – 17.7” Center to center glove separation 14” Range of distance from shoulder to ground: 50.7” – 62.17” Chamber will require 1 foot of adjustable vertical travel *For details on the anthropometric analysis reference System Level Design Documents on EDGE

Ergonomic Analysis 46” 62” To accommodate all operators and be safe to operate from the top and in the gloves the chamber requires 16” of travel

Nozzle fixture Overview: -Combines flow and angle testing in one location -Incorporates both nozzle block-offs for flow testing and measurement system for angle testing Roles in Engineering Requirements: - S4: “Elapsed Time”: does not add significant cycle time

Upper Door Overview: -Provides access to the nozzle fixture inside of the airlock -O-Ring sealed, solenoid locked (to be integrated into controls system) Roles in Engineering Requirements: -S1: “Air Quality”: Contains Calibration Fluid -S2: “Air Particle Removal”: Provides Seal for Vacuum -S8: “Calibration Fluid Leak”: Contains Calibration Fluid -S9: “Door Sealed During Operation” -S11: “Accessibility”: Easy Access for operator to Test Block

Gloves Overview: -‘Blast Chamber’ Style gloves -Allow operator access without exposure to fluid Roles in Engineering Requirements: -S1: “Air Quality”: Fluid does not leave chamber during operator interaction -S8: “Calibration Fluid Leak”: Calibration Fluid does not escape during operator interaction -S11: “Accessibility”: Easy Access for operator to Dual Block-off

Mid Chamber Valves Overview: -Ball valve interface between top and bottom chamber -Allows for separation of Air Lock from collected calibration fluid and smaller evacuation chamber Roles in Engineering Requirements: -S1: “Air Quality”: Liquid Cal fluid is isolated to completely closed portion of chamber -S3: “Liquid Drain Rate”: Easy Access for operator to Dual Block-off

Chamber Design Testing -Glove Pressure Testing: Several gloves samples were subjected to an air pressure of approximately 14.7 psi to test their structural stability to maximum internal chamber pressure. (Please see: subsystem testing, glove pressure test videos for more information) -Glove Material Exposure Testing: Samples of the same glove materials were exposed to the calibration fluid for two spans of time. Tests were performed on the samples post-exposure to record data for effects of the fluid on the materials. (Please see: subsystem testing, “Test Procedure Sheet (glove test).docx” for more information)

Bottom Chamber Overview: -Provides space for liquid calibration fluid to collect, separate from the air lock -Drain in bottom for line to fluid collection tank, recycled back into system Roles in Engineering Requirements: -S1: “Air Quality”: Liquid Cal fluid is isolated to completely closed portion of chamber -S3: “Liquid Drain Rate ”: Easy Access for operator to Dual Block-off -S8: “Calibration Fluid Leak”: Liquid Calibration Fluid is kept separate from rest of chamber, away from main openeing

Measurement

Fluids Subsystem Mist evacuation is needed to maintain visibility during test. The amount of air pulled from the system must be adjustable. Evacuating mist cannot influence the testing procedure. A two speed system combines low speed for visibility during test with high speed for fast mist evacuation at the end of the test.

Subsystem Flow By keeping the entire system sealed, no calibration fluid is allowed to escape. All aspects of the system are sealed including chamber doors, chamber drain, drain tank, mist collector system and mist collector drain. The test chamber will be automatically purged before allowing the chamber doors to be opened, eliminating the chance for an operator to come in contact with the atomized while also not allowing the atomized fluid to escape. Fluid that is pulled through the mist collector is returned to the drain tank. System is automated to reduce operator error.

Fluids Subsystem - Heart The heart of the subsystem is the AER Control System CM300. This unit is able to pull 300 cfm from the test chamber to quickly purge the system, while being throttled back during testing in order to not effect test results. Custom built unit will feature aluminum rotating drum to eliminate spark risk. Unit will be fitted with an activated carbon after filter to reduce any remaining odor. Filter can be replaced with ordinary activated carbon which is inexpensive and easily procured. Fluid removed via the collector will be returned to the drain tank.

Controls/ Integration

Risk Assessment

Remaining Risks RiskImportancePlan for MitigationCompletion Date Air / Fluid Leaks(27)(9)Test plan available on Edge under “Subsystem Test plans” ‘Test for Air Leaks in Chamber’ MSD II (Week 3-5) Nozzle Detaches27 Run test with different fittings to see which forms the best connection and is the easiest to install Week 14 Inability to interact with control system 9Determine I/O capabilities of test pressure control system Week15 Subsystem integration fail27Continue weekly updatesOngoing

Bill of Materials

Action Items Design Signed off by Jim Complete drawing package Make appointment with operators to perform glove simulation Compile purchase orders