Life-Cycle Project Management: EIS and Permit Integration Water for the Future: Repair and Bypass of the Rondout-West Branch Tunnel Jennifer Farmwald,

Slides:



Advertisements
Similar presentations
The Challenge to Install 1,300 New Water Meters. Scope Install electromagnetic meters (mostly) + telemetry + solar power ~700 sites in Upper Murray Valley.
Advertisements

Introduction. What is ISO14001? A documented system of all impacts a company are having on the environment. A detailed strategy to reduce these impacts.
1 Establishment of site security Chemical plant drain down & dismantling ->500 Tanks ->5000 Pipe Runs Demolition Site assessment and characterisation Construction.
Project Selection Overview By Tim Washington September 14 th, 2011.
Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
Finally! – A Process that Looks at Environmental Risk Early J. S. Irving Environmental Compliance Idaho National Laboratory.
Environmental Sustainability RPF May Slide 2 © CSIR Resolution: RPF Nov 2007 That an RPF working group be established to develop.
The New York City Watershed Agreement “A commitment to Partnership”
Upper Merion Township’s New Storm Water Management Program
Supply Augmentation Need Planning
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
C51 RESERVOIR PROJECT UPDATE Design, Permitting and Coordination NOVEMBER 10, 2014.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager October 6, 2011 Briefing on: DC CLEAN RIVERS PROJECT Anacostia River.
Ohio Department of Transportation Office of Transit Urban Roundtable September 30,
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering NYC Watersheds 
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering NYC Watersheds.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering NYC Water Supply System Overview How does NYC get the water it needs? Or How big is.
NYC Water Supply System Overview How does NYC get the water it needs? Or How big is NYC’s water footprint? How does NYC get the water it needs? Or How.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Water Research Foundation Workshop: Benchmarking April 23, 2015.
Federal Energy and Environmental Regulation Agencies and Laws
Water System Planning Study
CRITICAL INFRASTRUCTURE PROJECT IMPLEMENTATION— A WATER PERSPECTIVE NARUC STAFF SUBCOMMITTEE ON ACCOUNTING AND FINANCE SPRING MEETING New Orleans April.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Lower Susquehanna River Watershed Assessment Citizens Advisory Committee November 29, 2012 Anna Compton USACE 1.
NARUC Summer Committee Meetings Committee on Water Water Supply Planning: East, West, North and South July 17,2007.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Project Plan. Project Plan Components Project Overview – Description and Strategy Business Case Summary Key Deliverables and Scope Critical Success Factors.
Triple Life Cycle Assessment – Toward Sustainable Design of Municipal Capital Facilities Richard Gelb Sustainable Building Coordinator, Seattle Parks and.
LIFE AFTER LANDFILL – THE TRANSITION FROM LANDFILLS TO RESOURCE RECOVERY AND TRANSFER STATION 27 September 2007 "Planning – Guidance on Planning Issues.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
Public Scoping Meeting National Environmental Policy Act Portageville Bridge Project Tuesday, November 19, PM – 7 PM Genesee River Restaurant,
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Federal Aviation Administration NextGen Environmental Management System (EMS)
Intro to the Delaware River Basin Megan Wiley Rivera HydroLogics, Inc Sept 13, 2010.
NYWEA WSTC at West Point, NY September 15, 2009 The Impacts of Reservoir Drawdown on Water Quality in NYC’s Catskill and Delaware Reservoirs by L. Janus,
-1- UNRESTRICTED / ILLIMITÉ Demonstrating the Safety of Long-Term Waste Management Facilities Dave Garrick 2015 September.
 Project Capacity: 54 MGD  Water Purchase Agreement: 30-year take-if-delivered contract with San Diego County Water Authority for water purchase of.
Agency Board June 19, 2014 Update on the Davis-Woodland Water Supply Project.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering NYC Watersheds.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
@ContentsExecutive Summary Annexures A M A J U B A Umkhandlu Wesifunda District Municipality Distrik
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
ACMA Tune-up 400 MHz (Update and Milestone 3) MHz - Introduction 11 March 2016.
Nyc Build it back RFB Furnishing All Labor and Material Necessary and Required for residential construction services July 24, 2017.
The JMWP Consultation Visit frackfreeyork.org.uk for a link to the consultation page Download parts A and B of the publication response form if you plan.
Parts Management Plan Builder 26 July 07
Willow Meadows Civic Club Meeting September 13, 2011
I-280 Corridor Study and I-280/Winchester Blvd Project
Waste Planning Case Studies Exeter Energy from Waste Facility
Strategic Alliance Contract Northern Improvement
NYC Water Supply System Overview
Construction Management & Inspection
SmartMeterTM Steering Committee Update – September 2012
Environmentally Sustainable Design, Construction, Maintenance, and Operation. Oakland Yacht Club Harbor Reconfiguration.
Integrated Bilateral Agreement (IBA) 2018 to 2028
Ohio Department of Transportation Office of Transit
ERIE Summer Workshop Series: Watershed restoration
Early Funding (Regulations Section 6010)
Presentation transcript:

Life-Cycle Project Management: EIS and Permit Integration Water for the Future: Repair and Bypass of the Rondout-West Branch Tunnel Jennifer Farmwald, DEP September 18, 2013

2 Agenda Water for the Future (WFF) Program Overview Coordination: o Scope o Schedule o Contract Specifications o Construction Lessons Learned/Takeaways

3 WFF Program Overview The Rondout-West Branch Tunnel (RWBT) is part of DEP’s Delaware Water Supply System The RWBT will be taken out of service for up to 10 months to connect the Delaware Aqueduct to a bypass tunnel (currently under construction) During the shutdown, DEP will be unable to convey or divert water from the Delaware System Additional water supply is therefore needed to augment the Catskill and Croton system: o Reactivation of Queens Groundwater o Upper Catskill Aqueduct Rehabilitation o Demand Management Two Environmental Impact Statements Permits

4 WFF Program Overview

5 Bypass Tunnel – under construction Repairs in Wawarsing – in design Effects of the connection: o Increased drawdowns o Cessation of leaks in Roseton Cessation of leaks in Roseton o Additional releases from Rondout Reservoir Rondout Creek Cannonsville Reservoir. Lower photo shows same view as upper except at 6.5% capacity (Dec 20, 2001)

6 WFF Program Overview Queens Groundwater Reactivation Upper Catskill Aqueduct Rehabilitation o Cleaning o Leak repair o Chemical addition Demand Management o Municipal, Residential, non- Residential o System Optimization Watercourse resulting from Catskill Aqueduct Leak

7 EIS 1 - Completed Detailed assessment of shaft and bypass tunnel construction impacts. High-level, generic assessment of augmentation and temporary affects of the shutdown Impacts: o Noise o Transportation o Neighborhood Character Permits: o USACE Individual Permit o DEC Permits o Site Plan Approvals o NYSDOT Aerial View of RWBT Bypass Construction – Newburgh, NY

8 EIS 2 - Pending Update on shaft and bypass tunnel construction Detailed assessment of augmentation and temporary affects of the shutdown o Queens Groundwater Rehabilitation o Upper Catskill Aqueduct Optimization o Additional releases from Rondout Reservoir o Increased drawdowns in Catskill and Croton Systems o Cessation of leaks in Roseton Permits o Federal: USACE JDs, Nationwide o State: DEC, DOH o Local: 10+ Site Plan Applications, DEP, NYCDOHMH, NYC Design Commission

9 Design and Construction Coordination One contract to handle EIS and permits EA/Permitting review for all project designs (7 so far) Review all program contracts for consistency/scope Environmental Assessment and Permits Bypass Design Bypass Construction Catskill Design Catskill Construction Groundwater Design Groundwater Construction

10 Program Schedule Single, integrated program schedule Perform data needs assessment for contracts Red-flag items with long lead times Identify schedule constraints for risk management

11 Contract Specifications and Construction Integrated EIS commitments into contract specifications for first EIS: Conceptual Noise Mitigation Plan included as appendix Traffic mitigation letter agreement included as appendix; ensured allotment for purchase of adaptive traffic signals Negotiated GHG reduction measures: o From the EIS o From the contract specifications

12 Lessons Learned/Takeaways Integrate EA/permitting needs into design and construction contracts Coordinate closely to develop schedule milestones Identify risks and mitigation strategies early Meet with regulators early and often Work closely with the design and project management team Adapt for smaller projects