ETA Environmental Health and Safety Monthly Metrics February, 2015.

Slides:



Advertisements
Similar presentations
EETD Environmental Health and Safety Monthly Metrics April, 2014.
Advertisements

EETD Environmental Health and Safety Monthly Metrics March, 2014.
EETD Environmental Health and Safety Monthly Metrics July, 2013.
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Fire and Environmental Safety Health, healing and hope.
EETD Environmental Health and Safety Monthly Metrics October, 2013.
EETD Environmental Health and Safety Monthly Metrics December, 2013.
EETD Environmental Health and Safety Monthly Metrics August, 2013.
University Safety Office 10 Parks Road Oxford OX1 3PD Health and Safety Self Assurance Toolkit Directly.
EETD Environmental Health and Safety Monthly Metrics June, 2013.
EETD Environmental Health and Safety Monthly Metrics December, 2012.
EETD Environmental Health and Safety Monthly Metrics August, 2014.
EETD Environmental Health and Safety Monthly Metrics September, 2014.
EETD Environmental Health and Safety Monthly Metrics April, 2013.
EETD Environmental Health and Safety Monthly Metrics February, 2013.
EETD Environmental Health and Safety Monthly Metrics June, 2013.
EETD Environmental Health and Safety Monthly Metrics March, 2013.
1 Low Conductivity Water (LCW) Connection Training Environmental Energy Technologies Division Safety Topic January 9, 2012.
1 EETD NEW HIRE SAFETY ORIENTATION Environmental Energy Technologies Division (EETD) June 21, 2013.
ETA Environmental Health and Safety Monthly Metrics November, 2014.
EETD Environmental Health and Safety Monthly Metrics November, 2013.
EETD Environmental Health and Safety Monthly Metrics February, 2014.
EETD Environmental Health and Safety Monthly Metrics October, 2014.
EETD Environmental Health and Safety Monthly Metrics January, 2013.
ETA Environmental Health and Safety Monthly Metrics December, 2014.
ETA Environmental Health and Safety Monthly Metrics March, 2015.
Developing GIS for Scottish Canals
DAILY APPARATUS CHECKS The goal of a daily inspection is to ensure all systems and equipment are in proper working order before apparatus leave the station.
EETD Environmental Health and Safety Monthly Metrics May, 2014.
EETD Environmental Health and Safety Monthly Metrics June, 2014.
Federal Aviation Administration Project Status Update: R90 Tracon, STL ATCT, MCI ATCT, mold and moisture issues Presented to : CSA Terminal and Technical.
Overall Office Assessment GAR RateRate Current Issues: (results of analysis) Low violent crime rates demonstrate that people living and working on Picatinny.
ETA Environmental Health and Safety Monthly Metrics April, 2015.
ETA Environmental Health and Safety Monthly Metrics January, 2015.
Managing the Information Technology Resource Jerry N. Luftman
EETD Environmental Health and Safety Monthly Metrics January, 2014.
1 EETD SAFETY TOPICS FEBRUARY 28, 2013 Laboratory Area Housekeeping Awareness.
EETD Environmental Health and Safety Monthly Metrics September, 2013.
ETA Environmental Health and Safety Monthly Metrics June, 2015.
EETD Environmental Health and Safety Monthly Metrics July, 2014.
ETA Environmental Health and Safety Monthly Metrics July, 2015.
ETA Environmental Health and Safety Monthly Metrics May, 2015.
/0203 Copyright ©2002 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Safety and Health Program.
Release Reporting. Lesson #17 - Release Reporting How Do I Know If I Have a Leak in My UST System?
ETA Environmental Health and Safety Monthly Metrics August, 2015.
Chinook’s Edge School Division No. 73 General Safety Orientation.
ETA Environmental Health and Safety Monthly Metrics September, 2015.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
Division of Risk Management State of Florida Loss Prevention Program.
Active Corrosion Process Nisource – COH/CKY. Objectives  Understanding the terminology –Active Corrosion –& Suspected Areas of “Active Corrosion”  Developing.
INF 392G - Management of Preservation Programs Fall 2006 Class 9  Disaster Planning and Preparedness.
ETA Environmental Health and Safety Monthly Metrics October, 2015.
ETA Environmental Health and Safety Monthly Metrics November, 2015.
ETA Environmental Health and Safety Monthly Metrics December, 2015.
BY: Winston G. Smith Environmental Engineer UST/PCB & OPA Enforcement & Compliance Section EPA Region 4.
Linda Bagby - SBN Program Electrical Coordinator T600 Installation 8 February 2016 SBN Program Operational Readiness Clearance.
Presented by: Julie Dainty Jon Jones Kevin Elliott Technical Teacher Education, Pittsburg State University SAFETY IN THE CTE CLASSROOM.
ETA Environmental Health and Safety Monthly Metrics February, 2016.
M. Kimble. Safety Info. Safety and security specialists supervise and manage programs designed to provide for the safety and security of students, staff.
Safety and Health Program Don Ebert- Risk Manager (509)
Routine Board Operations Briefing/Chiefs Report North Routt Fire Protection District Presented by Mike Swinsick January 14, 2014.
San Francisco Fire Department Facilities Update.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
ETA Environmental Health and Safety Monthly Metrics March, 2016.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
ETA Environmental Health and Safety Monthly Metrics May, 2016.
Environment, Health & Safety
Departmental Safety Coordinator’s Training
Because Technology Never Stops
Presentation transcript:

ETA Environmental Health and Safety Monthly Metrics February, 2015

ETA Accidents- 2/15 TypeDateDept.DescriptionSeverityStatus Puncture to left hand 2/27/15ESDR While drawing chemical out of bottle with syringe, needle pulled out and punctured hand. First AidAccident investigation being set-up.

ETA Accidents- By Type

ETA Accidents- Severity

Emergency Incidents- 2/15 DateIncidentAreaStatus 2/17/15Coolant leak from MoWiTT trailer into parking lot. B64 MoWiTT Leak cleaned up by Facilities. The cooling system will be changed to a water-only system. All system fittings and components need to be inspected and repaired where needed.

Ergonomic Assessments- By Month

Open EETD Ergonomic Assessments Date Requested Dept.TypeStatus 2/27/15EAEIPreventativeAssigned 2/20/15EAEIDiscomfortActions Pending 2/19/15EAEIDiscomfortActions Pending 2/6/15ESDRHigh RiskAssigned 1/9/15BTUSDiscomfortActions Pending 11/25/14DIVPreventativeActions Pending 11/4/14EAEIDiscomfortActions Pending

ETA Job Hazard Analysis (JHA)- Pending New Hire vs. Expired Metric Started Sep ‘13

Job Hazard Analysis- % Completion

ETA Incomplete Training Assignments * Does not include SEC0203 “External Monitoring” Notice or “FSM” courses

Training % Completion Status

Incomplete Training by Course Type (Total Incomplete Assignments = 73 )

Training Assignments Due (Total = 73) Open Assignments by DivisionOpen Assignments by Hire Date

ETA Training Assignments Due

Electrical Equipment Inspection Failure Status (Red Dot) Equipment listed in the EEIP database as “failed” and requires repair prior to use.

ETA Failed Electrical Equipment Status (3/3/15) EquipmentDate Days Failed Dept.AreaStatus Fixture Current Sensor1/9/092244BTUS46-231Unable to locate unit Waveform Generator4/7/111426BTUS46-115Unable to locate unit Dual Seal Vacuum Pump4/27/111406EAEI63-101Unable to locate unit Aethalometer4/28/111405EAEI63-101Unable to locate unit AC Line Conditioner6/6/121000EAEI70-278Power cord needs to be replaced Blower6/11/12995EAEI70-289Power cord needs strain relief Appliance Monitors10/18/12866ESDR Units may never have been built. Request closure. Tracer Emitter Units (Multiple)11/20/12833BTUS70-217Units placed out of service Particle Samplers (multiple units)2/5/13756EAEI71-106Units placed out of service Residential Furnace10/18/13501BTUS70-173Unit being used for parts Turbine Meter Readout10/21/13498BTUS70-173Unable to locate unit MFC Pump12/2/13447EAEISactoWaiting for pump to be brought back from field Power Supply #111/7/14116EAEI70-278Uncovered AC terminal strip Power Supply #211/7/14116EAEI70-278Power cord needs replacement Power Supply12/10/1483ESDR70-173Unlanded conductors, ground bond not attached

Safety Concerns Submittals- ETA

ETA Safety Concerns Status #DateConcernTypeStatus 11809/23/14Need steps from B90 shuttle stop up to sidewalk. Uneven surface. Traffic- PedCATS submitted for funding /22/14Poor lighting near B90 stairwaysBuilding Maint. Open- Waiting for FWR closure /22/14Trash bin located at B63 is causing damage to exterior water pipe. Also blocking access ramp. Building Maint. Open- Facilities needs to find a new location /23/15Flashing crosswalk on Cyclotron Rd. is not operating properly TrafficOpen- Waiting for FWR closure

Corrective Action Reports (CATS)- 2/15 CAT #DateDescriptionLeadStatus 96757/29/14Seismically secure the laser table near the entrance. DOE assessment follow-up item. X. MaoFacilities work request submitted for installation /9/14Ensure air changes in meet fire code requirements S. SynarskiFacilities work request completed. Cannot close CATS until FWR is finalized in system by Facilities.

Audits and Inspection Status- 2/15 TypeDateLeadStatus DOE-BSO Walkthrough of B70 1 st floor 2/24/15K. Abbott/R. Scholtz Completed DOE-BSO Walkthrough of B70 2 nd floor 3/3/15K. Abbott/R. Scholtz Scheduled

Significant Safety Achievements- 2/15 Continue set-up of Work Planning and Control (WPC) projects/activities for ESDR. Several hands-on training sessions were organized to assist activity leads in learning how to use Activity Manager. The glove box self assessment project continues. A survey was distributed to PI’s and each glove box was surveyed by the assessment team. Data has been collected and is being compiled. The chemical container/sample clean-out of the B62 (Kerr) lab areas is nearly completed. A CMS inventory reconciliation resulted in the elimination of 800 containers that no longer exist. An ETA Safety Committee meeting was held 2/5/15. Alan Biocca has agreed to serve as the ETA Electrical Safety Officer (ESO). Participated in a DOE-BSO walkthrough of Building 70 lab areas. Efforts to eliminate old unused equipment needs to continue.

Short Term Safety Outlook- 3/15 Continue the set-up of the Work Planning and Control (WPC) “projects” and “activities” framework for ETA. Additional “hands- on” training classes are planned. Complete the Glove Box Operation Self-Assessment project report for submittal. Conduct the annual review and update of the ETA Integrated Safety Management (ISM) Plan. Provide follow-up for findings generated as a result of the B70 fire incident. A final ORPS report will be generated with findings. Continue old chemical/sample clean-outs in , , and Remaining inventory is being updated in the CMS. Assist with the set-up for new lab areas , B33 JCESR, and B60 test chambers.