Testing & Inspection Services - REF March 10,2010 Preproposal Presentation.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Building Codes, Zoning Ordinances
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Carriage house expansion at the Grover Cleveland birthplace
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Generation Business Line
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Skyscraper Construction
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Los Alamos NATIONAL LABORATORY 6/25/02, Sheet 1 UniFormat, OmniClass, MasterFormat UNIFORMAT II -- an org system for building “Elements” Elements: foundation;
So Cal Alliance of POTWs Energy Management/Biosolids Committee
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
MasterFormat™ April 7, 2005 Kevin R. Miller.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
Objectives To become familiar with a set of Construction Specifications; 1)Their layout and format. 2)The terms and definitions used and their legal ramifications.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
MasterFormat™ March 17, 2004 Kevin Miller.
Study of Top 500 Design Firms’ Plans to Adopt MasterFormat™ 2004 Kevin R. Miller, Ph.D. D. Mark Hutchings, Ph.D. Brigham Young University.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Construction Contract Documents
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
Construction Specifications Foreman’s Development Series
ARCH – 4601 Architecture Firm Presentation Popham Walter Architects Jason B. Ashe.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Albemarle County Public Schools Design for Vehicle Maintenance Facility Improvements September 10, 2009 R A N C O R N W I L D M A N A r c h i t e c t s.
Reading Structural Drawings
Foundation Plan Layout
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
……“Delivering Green” WeCare Organics LLC 9289 Bonta Bridge Road Jordan, New York
Construction Drawing Occupational Safety and Fundamentals
Building Plans.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Drawings ACT Objective Realize the organization and intent of construction drawings 2.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
Project title : Typical design of community college Supervisors: 1-Prof.Dr.abdulmohsion W. Dhowain 2-Dr. Mohammad Jamal AL Shannag 3-Dr. Ibrahim Hamouda.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
Project specifications Division 1- general conditions Division 2- sitework Division 3- concrete Division 4- masonry Division 5- metals Division 6- carpentry.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
CEE 578 Senior Capstone Design Types of Construction Drawings
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
ACSR Report The 33rd ARCASIA October 29 ~ November 2, 2012 Bali, Indonesia Korea Institute of Registered Architects (KIRA)
2011 WCW Conference. Fort McMurray James Sacker, Director Environmental Hugh Crawford, Wastewater Supervisor Plant Operations staff Alberta Environment.
1 JCI 1 1 An engineer is someone who can do for $5,000 what any damn fool can do for $50,000. Anonymous.
Energy Huntsville Opportunity Report and Government Collaboration June 2016.
What is MasterFormat?. “MasterFormat is a master list of numbers and subject titles classified by work results or construction practices for organizing.
Session 1: Identifying Construction Drawings and Drawing Components.
Upon completion of this module, you will be able to:
Overview of MSBA Building Process and Project Timeline
Hailo US Tower Equipment Manufacturer
Construction Documents
(Refer to Chapter 2 of the textbook)
Multistory Office Building
Wood Structures Topic 8 Quality Workmanship
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Carleton College Summer 2018 Science and Campus Construction Plan
Minuteman Vocational Technical Regional High School Progress
Project: 250 West Street, Columbus, Ohio
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
All Africa Housing (PTY) LTD
EAST PENNSBORO AREA SCHOOL DISTRICT
Presentation transcript:

Testing & Inspection Services - REF March 10,2010 Preproposal Presentation

Agenda Introduction Related Projects Project Schedule Site and Building Construction Documents Proposal

QA/QC Philosophy Section Contractor—Quality Control Program Testing Inspection Owner—Quality Assurance Program Testing 24 hours Inspection 48 hours Contractor is still responsible

Contract 28: Renewable Energy Facility What’s it all about? Contract 28 builds a 50,600 square foot multi-story building at the Southerly Wastewater Treatment Center to house the following new systems: Biosolids dewatering and conveyance Fluidized bed incineration Steam production using waste heat from incineration Electricity production using steam This will allow Southerly to abandon its existing thermal conditioning, dewatering and conveyance, and multiple hearth incineration systems.

Contract 28: Renewable Energy Facility Turbine Generator Bldg. Truck Loading Incineration Dewatering

NORTH SOUTHERLY WASTEWATER TREATMENT CENTER MAINT. BLDG. SLUDGE STORAGE TANKS SOLIDS HANDLING & INCINERATION ABANDONED IMHOFF TAKS DIGESTER “A” TANK GROUP SITE OF RENEWABLE ENERGY FACILITY NORTH TCSTs CONSTRUCTION STAGING AREA 2 CONSTRUCTION STAGING AREA 3 ROAB “B” DELIVERIES THRU ROAD “B” GATE

Scope of Work TCIS-28 (Full Time) 1. Project Resident Chief Inspector – fulltime; supported by coordinating Special Inspector (PE) (As Needed Basis) 1. Specialty Testing Services – Section Construction Inspection Services – all disciplines 3. Shop Witness Testing/Inspection 4. Laboratory Testing Services – Section 01451

Related Project Contract 28B: Fluidized Bed Incinerator Equipment Procurement Infilco Degremont is supplying equipment for three fluidized bed incinerator trains to be installed under Contract 28 Price: $49,753,000

Contract 28B Integration Issues: Equipment delivered by IDI will be received by the Contract 28 contractor. Most of the equipment IDI is supplying will be installed by the Contract 28 contractor. IDI’s installation responsibilities are limited to: –Construction of fluidized bed incinerator shells and refractory lining of shells’ interiors –Code welding of waste heat boilers An IDI representative will be on site to provide technical assistance for the installation of IDI-supplied equipment by the Contract 28 contractor. For IDI-supplied equipment, site visits by manufacturers’ representatives are covered under IDI’s contract. Contract 28 contractor will assist IDI in start-up and testing of the incinerator trains.

Project Schedule Start: June, B Delivery: Oct, 2010-Oct, 2011 Start Commissioning: Late 2012 Complete Work: 2013

Site Plan INCINERATION TURBINE GENERATOR BIOSOLIDS HANDLING & CONVEYANCE TRUCK LOAD-OUT OFFICES Building Area = 50,600 SF; Pavement Area = 29,800 SF BIOSWALE (1 OF 3) GRAY WATER CISTERN

INCINERATION TURBINE GENERATOR BIOSOLIDS HANDLING & CONVEYANCE (POLYMER SYSTEM) TRUCK LOAD-OUT MECHANICAL SPACES Building Level Schematic Basement (El )

INCINERATION TURBINE GENERATOR BIOSOLIDS HANDLING & CONVEYANCE TRUCK LOAD-OUT CONTROL RM. LAB MULTI- PURPOSE RM. Building Level Schematic Ground Floor (El ) SUBSTATIONS NOTE: IF CROSSED OUT, THERE IS NO FLOOR AT THE LEVEL DEPICTED

INCINERATION TURBINE GENERATOR BIOSOLIDS HANDLING & CONVEYANCE (STORAGE BINS, CAKE PUMPS) TRUCK LOAD-OUT OFFICES Building Level Schematic Second Floor (El and 620.5) MCCs EL EL

INCINERATION TURBINE GENERATOR BIOSOLIDS HANDLING & CONVEYANCE (CENTRIFUGES) TRUCK LOAD-OUT COMM. RM. & LOCKER RMS. Building Level Schematic Third Floor (El ) UNASSIGNED ROOF EL

TRUCK LOAD-OUT Building Level Schematic Roof (El ) ROOF EL ROOF EXTENSION TO ACCOMMODATE OVERHEAD CRANE ON THIRD FLOOR) ROOF EXTENSION TO ACCOMMODATE WASTE HEAT BOILERS

General Building Information: 1,057 14x73 75-ton H-piles under Biosolids Handling & Conveyance, Incineration and Offices 17 14x73 75-ton H-piles under Truck Loading 77 14x73 90-ton H-piles under turbine generator 50 10x42 H-piles under biofilter Nominal 18” thick basement floor slab; thicker at pile layouts and pile caps Nominal 16” thick concrete perimeter walls from basement floor slab to El ’ x 10’ x 4’ thick isolated concrete pad for turbine generator

General Building Information (Cont.): Floor grating (excluding platforms) is limited to portion of third floor in Incineration area. Remaining floors are concrete. One freight elevator; adjacent stairwell extends from basement to roof. One passenger elevator; adjacent stairwell extends from basement to third floor. Modified built-up roof system. Metal roof panel system for roof extensions. Aluminum curtain wall for Office area. Face brick on masonry block backup for remainder of building.

North Building Exterior

East Building Exterior

South Building Exterior

West Building Exterior

Contract 28 Bid Documents 3 Drawing Volumes Containing a Total of 903 Sheets Volume 1 of 3:Title (T) 6 sheets General (G) 3 sheets Demolition (D) 21 sheets Site Civil (C) 32 sheets Process Mechanical (M) 110 sheets Architectural (A) 81 sheets Volume 2 of 3:Title (T) 6 sheets Structural (S) 109 sheets HVAC (H) 45 sheets Plumbing (P) 35 sheets Fire Protection (F) 7 sheets Instrumentation (I) 121 sheets Volume 3 of 3:Title (T) 6 sheets Electrical (E) 321 sheets

Contract 28 Bid Documents 3 Technical Specification Volumes Containing a Total of 269 Individual Specification Sections Volume 1 of 3:Div. 1 – General Requirements (49 Sections) Div. 2 – Site Construction (15 Sections) Div. 3 – Concrete (7 Sections) Div. 4 – Masonry (5 Sections) Volume 2 of 3:Div. 5 – Metals (14 Sections) Div. 6 – Wood and Plastics (2 Sections) Div. 7 – Thermal and Moisture Prot. (17 Sections) Div. 8 – Doors and Windows (7 Sections) Div. 9 – Finishes (8 Sections) Div. 10 – Specialities (10 Sections) Div. 11 – Equipment (27 Sections) Div. 12 – Furnishings (3 Sections) Div. 13 – Special Construction (23 Sections)

Contract 28 Bid Documents 3 Technical Specification Volumes Containing a Total of 269 Individual Specification Sections Volume 3 of 3:Div. 14 – Conveying Systems (5 Sections) Div. 15 – Mechanical (43 Sections) Div. 16 – Electrical (34 Sections)

Pre-Proposal Communication Information and Data requests (March 16 th is the last day)

Proposal Content Executive Summary (5 pages) Qualifications (20 pages) – Individuals – Project Team Technical Approach (30 pages) Local Participation ~ 80% (3 pages) SBE Participation ~ 15% (2 pages) Testing Services Rate Schedule Proposed Overhead Rates: field, office

Evaluation Criteria Written Qualifications ~ 60% Written Technical Approach ~ 25% Presentation & Interview ~ 15% (Optional)

Requirements 15% SBE Goals Certified List Updated Monthly Tiffany Jordan, Contract Compliance Manager 80% Local Requirement Presentation by up to Three (3) Top Ranked Firms (Optional) 90 minutes for presentation including 30 minutes for questions Selection committee members will not be announced

THANK YOU FOR ATTENDING! Questions ?